Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance N A | FARIDABAD | HARYANA | 121004 | L1 | Accepted-Finance Accepted | |
| 2 | L2₹8.3 L+₹1.3 L (18.2%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹8.4 L+₹1.4 L (19.6%)Accepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | L4₹8.9 L+₹1.8 L (25.6%)Accepted-Finance | L4 | Accepted-Finance Accepted | |
| 5 | L5₹9.0 L+₹1.9 L (27.0%)Accepted-Finance | L5 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | Yassir Ahmrd L7 | Mudassar Ahmed L3 | vikram singh L6 | M/S MOHD ISHAFQ CONTRACTOR L9 | Sabina Begum L4 | SAFEENA BEGUM L8 | Irshad Ahmed L2 | Pawan Kumar L1 | INDERJEET PARIHAR L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | WOODEN FOOT BRIDGE 2 No's 15 FT SPAN
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth,
1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from
cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 9.52 | Cum | 400 ₹3,808 | 300 ₹2,856 | 500 ₹4,760 | 250 ₹2,380 | 135 ₹1,285.2 | 400 ₹3,808 | 500 ₹4,760 | 50 ₹476 Lowest | 500 ₹4,760 |
| 2.00 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah | 14.95 | Cum | 1,500 ₹22,425 | 1,500 ₹22,425 | 500 ₹7,475 | 3,000 ₹44,850 | 550 ₹8,222.5 | 2,500 ₹37,375 | 500 ₹7,475 | 90 ₹1,345.5 Lowest | 4,400 ₹65,780 |
| 3.00 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft
complete job as per directed by the site inchargeEngage 2 Carpenter for 24 days for making 2 foot bridge of Span 15 ft | 48 | No | 750 ₹36,000 | 320 ₹15,360 | 500 ₹24,000 | 800 ₹38,400 | 2,300 ₹1,10,400 | 700 ₹33,600 | 900 ₹43,200 | 25 ₹1,200 Lowest | 1,800 ₹86,400 |
| 4.00 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft
complete job as per directed by the site inchargeEngage 4 Labour for 24 days for making 2 foot bridge of Span 15 ft | 96 | No | 500 ₹48,000 | 320 ₹30,720 | 500 ₹48,000 | 800 ₹76,800 | 2,100 ₹2,01,600 | 500 ₹48,000 | 500 ₹48,000 | 70 ₹6,720 Lowest | 500 ₹48,000 |
| 5.00 | Providing and fixing of Nails | 24 | Kg | 100 ₹2,400 | 100 ₹2,400 | 500 ₹12,000 | 120 ₹2,880 | 250 ₹6,000 | 150 ₹3,600 | 100 ₹2,400 | 30 ₹720 Lowest | 250 ₹6,000 |
| 6.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.
Two or more coats on new work over an under coat of suitable shade with ordinary paint of
approved brand and manufacture | 30.67 | Sqm | 300 ₹9,201 | 180 ₹5,520.6 | 500 ₹15,335 | 150 ₹4,600.5 | 40 ₹1,226.8 Lowest | 165 ₹5,060.55 | 200 ₹6,134 | 80 ₹2,453.6 | 300 ₹9,201 |
| 7.00 | Carriage of materials from source to site of work Stone av. Distance HL 500 Mtr | 14.95 | Cum | 750 ₹11,212.5 | 600 ₹8,970 | 500 ₹7,475 | 100 ₹1,495 | 295 ₹4,410.25 | 400 ₹5,980 | 500 ₹7,475 | 30 ₹448.5 Lowest | 1,300 ₹19,435 |
| 8.00 | CONSTRUCTION OF PATH 10000 FT Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not
exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan,
depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed
earth to be levelled and neatly dressed in all kinds of soil. | 451.71 | Cum | 300 ₹1,35,513 | 200 ₹90,342 | 500 ₹2,25,855 | 250 ₹1,12,927.5 | 23 ₹10,389.33 | 230 ₹1,03,893.3 | 300 ₹1,35,513 | 8 ₹3,613.68 Lowest | 150 ₹67,756.5 |
| 9.00 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone. | 39.83 | Cum | 1,200 ₹47,796 | 1,200 ₹47,796 | 500 ₹19,915 | 2,000 ₹79,660 | 730 ₹29,075.9 | 2,000 ₹79,660 | 400 ₹15,932 | 8 ₹318.64 Lowest | 3,900 ₹1,55,337 |
| 10.00 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. | 606.41 | Sqm | 300 ₹1,81,923 | 180 ₹1,09,153.8 | 5 ₹3,032.05 Lowest | 400 ₹2,42,564 | 220 ₹1,33,410.2 | 220 ₹1,33,410.2 | 150 ₹90,961.5 | 8 ₹4,851.28 | 140 ₹84,897.4 |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
1 Jul 2026, 4:00 pmClosed
Wildlife Warden Chenab Division,Kishtwar
Kishtwar
Construction of Track route in Nanth Catchment from Hud Mata to Bramsar including Construction of path, foot bridge, shelter shed and tenting sites. Under Mitigation Plan , Wildlife Division Kishtwar for the Year 2026-27.
2026_FD_312623_1
NIT 01 OF 2026-27 Track route Nanth Catchment Hud Mata to Bramhsar
Open Tender
Civil Works
Item Wise
90 days
Nanth, Dachhan.
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Wildlife Warden Chenab Division,Kishtwar
₹28,000
29 Sept 2026
17 Jun 2026
2 Jul 2026
17 Jun 2026
1 Jul 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | WOODEN FOOT BRIDGE 2 No's 15 FT SPAN
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth,
1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from
cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 9.52 | Cum | - | - |
| 2 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah | 14.95 | Cum | - | - |
| 3 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft
complete job as per directed by the site inchargeEngage 2 Carpenter for 24 days for making 2 foot bridge of Span 15 ft | 48 | No | - | - |
| 4 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft
complete job as per directed by the site inchargeEngage 4 Labour for 24 days for making 2 foot bridge of Span 15 ft | 96 | No | - | - |
| 5 | Providing and fixing of Nails | 24 | Kg | - | - |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.
Two or more coats on new work over an under coat of suitable shade with ordinary paint of
approved brand and manufacture | 30.67 | Sqm | - | - |
| 7 | Carriage of materials from source to site of work Stone av. Distance HL 500 Mtr | 14.95 | Cum | - | - |
| 8 | CONSTRUCTION OF PATH 10000 FT Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not
exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan,
depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed
earth to be levelled and neatly dressed in all kinds of soil. | 451.71 | Cum | - | - |
| 9 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone. | 39.83 | Cum | - | - |
| 10 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. | 606.41 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_1012150.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .