Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC KHANDRA BARDHAMAN 713363 WEST BENGAL INDIA | KHANDRA | BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.0 L+₹6,223.80 (3.26%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.1 L+₹17,793.80 (9.33%)Rejected-Finance 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | L3 | Rejected-Finance L3 |
Tender Value
₹2.3 L
EMD Value
₹2,900
Closing Date
7 Jun 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AREA ENGINEER ENM
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
repairing/rewinding of two nos. of electric motors 90KW/550V 1480 RPM CNG Make induction motor CC.NO. N-263 and 110KW/550V 1480 rpm Marathon Make CC.NO. JPC-15 under Jhanjra Project Colliery.
2024_ECL_309031_1
ECL/GM/JNR/EnM/A2/24-25/26 dated 23.05.2024
Open Tender
Miscellaneous Works
Item Rate
15 days
JHANJARA UNDERGROUND
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,900
5 Sept 2024
27 May 2024
8 Jun 2024
27 May 2024
7 Jun 2024
28 May 2024
27 May 2024 - 3 Jun 2024
Amount
PART A Repairing/rewinding of electric motor 90KW/550V 1475 RPM C&G Make induction motor CC.NO. N-263.
Dismantling of motor stater and rotor both after removing of circuit connection and jumpering, taken out burnt coils from stater slot, cleaning of core slots by approved type cleaner ,drying etc.
Supply of SE Copper Wire 20SWG
Insulation Cost
Labour Cost
Supply of pvc copper insulated copper lead
Supply of terminal insulator
Supply of wooden farma for making Coils as per size
Repairing of both end cover by welding and machining
Labour cost for assembling
Repairing of rotor shaft by welding and maching
Replacement of Ball Bearing no. 6318
Less of copper scrap value
Both side transportation charges of above motor
PART B Repairing/rewinding of electric motor 110KW/550V 1480 RPM Marathon Make induction motor SL.NO. JPC-15
Dismantling of motor stater and rotor both after removing of circuit connection and jumpering, taken out burnt coils from stater slot, cleaning of core slots by approved type cleaner ,drying etc.
Supply of SE Copper Wire 20SWG
Insulation Cost
Labour Cost
Supply of glass insulated copper lead
Supply of terminal insulator
Supply of wooden farma for making Coils as per size
Less of copper scrap value
Reconditioning of bearing housing by removing old sleeve ,fabrication & fixing of new sleev & maching as per size
Checking trueness of rotor and both end cover
Shaping of copper bars
Replacement of ball bearing NU-319-C3
Both side transportation charges of above motor
Total impact of GST for the purpose of CTC
KIRAN ELECTRICAL
ROY ENTERPRISE
techsummary_320224.pdf
PDF • 0.99 MB
finsummary_320224.pdf
PDF • 0.99 MB
WOA226.pdf
PDF • 1.27 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .