| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.4 LAccepted-AOC | L1 | Accepted-AOC The lowest and negotiated bidder M/s Kheerthi Associates, Krishnagiri is accepted by the this office note order dt.14.10.2025 | |
| 2 | L2₹98.5 L+₹2.7 L (2.86%)Rejected-AOC | L2 | Rejected-AOC Other than lowest tenderer | |
| 3 | L3₹1.0 Cr+₹6.4 L (6.73%)Rejected-AOC 1 532 1 AMMAN TOWER ENGINEER NAGAR 3RD FLOOR 8TH STREET MADURAI NORTH THIRUPPALAI MADURAI 625014 | MADURAI | TAMIL NADU | 625014 | L3 | Rejected-AOC Other than lowest tenderer |
| Sl No | Description | Qty | Unit | Sri Amman Construction L3 | Kheerthi Associates L1 | M/S MRD CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 221.5 | M3 | 265 ₹58,697.5 | 270 ₹59,805 | 255 ₹56,482.5 Lowest |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 19.5 | M3 | 6,500 ₹1,26,750 | 6,094 ₹1,18,833 | 6,000 ₹1,17,000 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 23 | M3 | 1,800 ₹41,400 Lowest | 2,153 ₹49,519 | 2,000 ₹46,000 |
| 4.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 93 | M3 | 160 ₹14,880 Lowest | 167 ₹15,531 | 165 ₹15,345 |
| 5.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 41.1 | M3 | 500 ₹20,550 Lowest | 517 ₹21,248.7 | 550 ₹22,605 |
| 6.00 | Brick work in following Cement Mortar 1:5 (One cement and five crushed stone sand) using best quality Burnt Clay Brick of size 9” x 4-3/8” x 2¾” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge.-For Foundation & Basement | 47.1 | M3 | 8,500 ₹4,00,350 | 8,074 ₹3,80,285.4 Lowest | 8,300 ₹3,90,930 |
| 7.00Brick work in Cement Mortar 1:6 (One cement and six crushed stone sand) using best quality Burnt Clay Brick of size 9” x 4-3/8” x 2¾” with class designation of 7.5 conforming to IS 1077-1992 including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge | ||||||
| 7.01 | For Super Structure in Ground Floor | 55.1 | M3 | 8,500 ₹4,68,350 | 8,097 ₹4,46,144.7 Lowest | 8,350 ₹4,60,085 |
| 7.02 | For Super Structure in First Floor | 18.1 | M3 | 8,600 ₹1,55,660 | 8,295 ₹1,50,139.5 Lowest | 8,500 ₹1,53,850 |
| 8.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 134.5 | M2 | 700 ₹94,150 Lowest | 753 ₹1,01,278.5 | 780 ₹1,04,910 |
Tender Value
₹90.5 L
EMD Value
₹55,500
Closing Date
6 Oct 2025, 3:00 pmClosed
The Superintending Engineer PWD
Buildings C and M Circle Salem
Construction of Silkworm Seed Rearing Building in Large Scale Silk Farm at Kollati in Krishnagiri District.
2025_PWD_606059_1
29/04/2025-26
Open Tender
Civil Works - Buildings
Lump-sum
150 days
Kollati in Krishnagiri District
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹55,500
4 Dec 2025
19 Sept 2025
6 Oct 2025
19 Sept 2025
6 Oct 2025
19 Sept 2025
Amount
Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers.
Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Brick work in following Cement Mortar 1:5 (One cement and five crushed stone sand) using best quality Burnt Clay Brick of size 9” x 4-3/8” x 2¾” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge.-For Foundation & Basement
Brick work in Cement Mortar 1:6 (One cement and six crushed stone sand) using best quality Burnt Clay Brick of size 9” x 4-3/8” x 2¾” with class designation of 7.5 conforming to IS 1077-1992 including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge
For Super Structure in Ground Floor
For Super Structure in First Floor
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid).
Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid)-.RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks
Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). ( Slab )- RCC Floor Slab, Roof Slab, Loft, Landing Slabs
Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid)-. For Column Sunshade
Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
For Foundation & Basement
For Super Structure in Ground Floor
Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost of centering shuttering reinforcement grills and fabrication charges but including Cost of Mortar Plasticizer, curing etc. complete and as directed by the departmental officers. (Dummy columns should be at least 1 metre height)-Mixing by mechanical means-For Super Structure in First Floor
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
For upto Plinth/ Basement level
For Super Structure in Ground Floor
For Super Structure in First Floor
Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means
Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means - For foundation and basement
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supplying and fixing in position best approved of BIS quality 110mm dia PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of neceSORy PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of “U” clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification and as directed by the departmental officers-one floor
Paving the floor with best quality Double Charged vitrified Tiles 600x600x8mm of size and variety conforming IS 15622 with water absorbtion less than 0.08% of approved colour and shade laid over cement mortar bed of 20mm thick in cement mortar 1:3 (one cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer in all floors and the top pointed with Water Resistant Tile Epoxy Grout etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dadooing walls with Dadooing with printed design colour glazed tiles of size 300 x 450 x 8mm conforming to IS 15622 of following sizes in Cement Mortar 1:2 (One Cement and Two crushed stone sand),10 thick with Mortar Plasticizer and pointing the joints with Water Resistant Tile Epoxy Grout at the rate of 0.27 Kg. / sq.m. neatly in all floors, curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Pavingpre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in accordance with IS 1443 in Cement Mortar 1:3 (One Cement and Three crushed stone sand), with required Cement Slurry and Mortar Plasticizer, 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Manufacturing supplying and fixing of Fully panelled steel door with the following specification MS angels of size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x6mm for the shutter frames stiffeners with 32 x 6mm M.S flat is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact. M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter, 3nos. of Steel Parliament Hinges of Size 125mm x 150mm in case of single leaf and 6nos. of Steel Parliament Hinges of Size 125mm x 150mm in double leaves shutter to be provided 6nos. of holdfasts 200 mm in length made of angle section spliced at the ends are welded to the outer frames of the door. Tower bolts 4nos. One the top of each shutter, one at lock rail and the other at the bottom are provided. 1no. Aldrop is provided at lock rail section in the door 3 Nos of handle are to be provided, one more aldrop is provided in the inner lock rail section of the door One rotaing locking arrangements for the inner side of the door and additional
provision for locking arrangements for lock is provided on the rear side of the door at an appropriate place. Incase of double leaf door M.S.Flat 32 x 3mm at 1.1Kg/m is provided on the one shutter t conceal the gap between the two shutters. at an appropriate place in the door. A tie bar is provided at the bottom of the frame to prevent twisting of frame during transportation and fixing. All members are given a coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation to site of work, loading, un loading and all other incidental charges etc.,complete complying with standard specification and as directed by the departmental officers. - Single leaf of size 1.00m x 2.10m.
Manufacturing, supplying and fixing of Entrance steel door Single leaf coverd with the following specification. M.S angles of a size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32x6mm M.S. flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the shutter and welded intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S. flat sand witching the CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter. The balance 2/3 portion at top is provided with grill at an average weight of 20 kg/sq.m with 300mm hieght of fixed glazing at top with 3mm thick Pin Headed glass including 3 Nos Steel Parliament Hinges of Size 125mm x 150mm for single leaf shutter to be provided 6 nos of holdfasts 200mm in length made of angle section spliced at the ends are welded to the outer frame of the door. Tower bolts 3 nos, one at the top, one at lock rail (Inner) and the other at the bottom are provided. one aldrop is provided at on appropriate place in the door. 2Nos of handle are to be provided.
A Tie bar is provided at the bottom of the outer frame to prevent twisting of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by the departmental officer. The rate includes cost of all meterials, labour, charges,taxes, transportation to site of work, loading, unloading and all other incidental charges etc., complete complying with standard specification and as directed by the departmental officers. - Single leaf of size 1.00m x 2.40m.
UPVC Window Specification: Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work
UPVC Ventilator Specification: Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Louvered Ventilators of from the profile the size of outer frame 60mm x 58mm and shutter profile size of 60 x 78mm both profiles are reinforced with GI/1mm 125GSM and 100% corrosion free, the profile are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with all over the edges of frame and shutter. The corners and joints should be welded and cleaned. Radiations pin headed glass 4mm thick should be provided in the louvers. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The ventilator should be got approved from the Executive Engineer before use on work
Supplying and fixing Mild Steel grills for windows, ventilators etc.,complete complying with standard specifications and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers.
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothly with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers.( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (water proof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coats of putty, scrapping the putty area to level the surface smooth, etc.,complete. The putty should be got approved by the Executive Engineer before use on work
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat on cement plastered wall surface ect., complete complying with standard specification and as directed by the departmental officers.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supplying , fixing and roofing with colour galvalume sheet of 0.47mm thick with all necessary accessories such as J/V bolt and nuts of suitable length with suitable bitumen washers complete complying with standard specification and as directed by the departmental officers.
Supplying and Fixing MS Ladder width 45cm using 50x50x6mm MS Angle all necesssary accessories complete complying with standard specification and as directed by the departmental officers.
M/S MRD CONSTRUCTIONS (BID ID -1479266)
Sri Amman Construction (BID ID -1478942)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_724439.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .