| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹8.9 L+₹704.35 (0.08%)Rejected-AOC | L2 | Rejected-AOC HIGHEST |
Tender Value
₹8.9 L
EMD Value
₹17,800
Closing Date
4 Mar 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ID UNNAO
EE ID UNNAO
RECONSTRUCTION OF VRB AT DEVGAON DY KM 12.00
2023_UPIDC_778702_34
03/EE/2022-2023
Open Tender
Civil Works - Bridges
Item Wise
20 days
UNNAO
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,266
₹17,800
7 Aug 2024
27 Feb 2024
4 Mar 2024
27 Feb 2024
4 Mar 2024
27 Feb 2024
27 Feb 2024 - 4 Mar 2024
Amount
E/w in cutting in foundation of Culvert / Guide wall on channels Below 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete (M -7.5) in foundation 1:4:8 with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete in foundation 1:4:8 with Brick Ballast including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete 1:6:12 with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.Workdone as per Drawing & direction of engineer-in-charge.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.For bridge slab above 3.00m span.Workdone as per as per Drawing & direction of engineer-in-charge.
Laying R.C.C (M -20)1:1.5:3 in Slab,Karb & Abetment Cap with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.
(Steel Reinforcement) Bending ,Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.Workdone as per as per Drawing & direction of engineer-in-charge.
Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. Workdone as per as per Drawing & direction of engineer-in-charge.
Making / Fixing of expansion joint as per Drawing & direction of engineer-in-charge.
Joint filler board including all cost of material labour T&P etc. as per Drawing & direction of engineer-in-charge.
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete.
Supplying and fixing of Wheel Gard [(L-1100x300Dia,12mm 8 no. main bar,8mm Ring with RCC-M20) including ,Earth work and fixing in position with CC M20 (600x600x400mm) in 1:1.5:3 with stont grit .](all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc .
Supplying and fixing sign board [ On angle iron frame 40x40x6 mm 25x5 mm flat iron bracing sand 18 SWG (1.25mm)MS sheet with one coat of red oxide primer,Painting, Writing including Earth work and fixing in position with C:C M-10 (450x300x300mm) with stone grit .](all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc .
E/W in making approach road for diversion including all cost of material labour T&P etc..
E/W in removing / cutting of diversion including all cost of material labour T&P etc..
Demolishing old brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead as per direction of Eng-in- charge.
Paint (Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard)
Painting chainage numbers on Parapet including cost of all material require.
Dewatering at site (Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.Workdone as per direction of Engineer-in-charge.)
Dharmesh Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .