Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
29 Sept 2023, 3:00 pmClosed
PR & CC
This tender is published for AMC (CAMC) of Various Safety Equipment Installed at POL Locations Across
2300005572-HD-09050
5100005572
Open Tender
Unknown (Unspecified Location)
29 Sept 2023
8 Sept 2023
29 Sept 2023
29 Sept 2023
8 Sept 2023 - 22 Sept 2023
14 Sept 2023
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | CAMC - HVLR - AKRON | CAMC - HVLR - AKRON — MC-HVLR-AKRON BRASS MAKE, CAMC OF HIGH VOLUME LONG RANGE MONITOR, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONED IN THE TENDER CAMC HVLR INDIAN MAKE Manadatory: No | - | each |
| 1 | CAMC - HVLR - INDIAN MAKE | CAMC - HVLR - INDIAN MAKE — MC-HVLR-INDIAN MAKE, CAMC OF HIGH VOLUME LONG RANGE MONITOR, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONED IN THE TENDER. CAMC VIMAL FIRE Tank RimSeal Manadatory: No | - | each |
| 1 | Rim Seal -VIMAL FIRE - Tank | Rim Seal -VIMAL FIRE - Tank — MAL FIRE-TANK DIA <=25 M, CAMC OF RIME SEAL FIRE PROTECTION SYSTEM, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONED IN THE TEND | - | each |
| 2 | Rim Seal -VIMAL FIRE Tank dia | Rim Seal -VIMAL FIRE Tank dia — MAL FIRE TANK DIA >25 M BUT <=40 M, CAMC OF RIME SEAL FIRE PROTECTION SYSTEM, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONED I | - | each |
| 3 | Rim Seal -VIMAL FIRE Tank dia | Rim Seal -VIMAL FIRE Tank dia — MAL FIRE TANK DIA >38 M BUT <=50 M, CAMC OF RIME SEAL FIRE PROTECTION SYSTEM, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONED I CAMC FITECH Tank Rim Seal Manadatory: No | - | each |
| 1 | Rim Seal -FITECH - Tank Dia | Rim Seal -FITECH - Tank Dia — TECH-TANK DIA <=25 M, CAMC OF RIME SEAL FIRE PROTECTION SYSTEM, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONED IN THE TENDER. | - | each |
| 2 | Rim Seal -FITECH - Tank Dia > | Rim Seal -FITECH - Tank Dia > — TECH-TANK DIA >25 M BUT <40 M, CAMC OF RIME SEAL FIRE PROTECTION SYSTEM, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONED IN THE CAMC HSE ENGINEERS Tank Rim Seal Manadatory: No | - | each |
| 1 | Rim Seal -HSE ENGINEERS - | Rim Seal -HSE ENGINEERS - — E ENGINEERS-TANK DIA <=25 M, CAMC OF RIME SEAL FIRE PROTECTION SYSTEM, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONED IN THE T | - | each |
| 2 | Rim Seal -HSE ENGINEERS | Rim Seal -HSE ENGINEERS — E ENGINEERS TANK DIA >25 M BUT <=40 M, CAMC OF RIME SEAL FIRE PROTECTION SYSTEM, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONE | - | each |
| 3 | Rim Seal -HSE ENGINEERS | Rim Seal -HSE ENGINEERS — E ENGINEERS TANK DIA >40 M BUT <=50 M, CAMC OF RIME SEAL FIRE PROTECTION SYSTEM, AMC/CAMC OF THE EQUIPMENT AS PER DETAILS MENTIONE | - | each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2300005572-HD-09050.pdf
TENDER_DOCUMENT • 37.50 MB
Download all tender documents and submit your bid