| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC DEVANE NANDED NANDED | NANDED | MAHARASHTRA | 431601 | ₹1.8 Cr | L1 | Accepted-AOC L1-OK |
| 2 | L2₹1.9 Cr+₹16.0 L (9.08%)Rejected-AOC A 8 YAHODUTTA SOCIETY KASBA PETH PUNE 411011 | PUNE | PUNE | MAHARASHTRA | 411011 | ₹1.9 Cr+₹16.0 L (9.08%) | L2 | Rejected-AOC L2-Reject |
| 3 | Rejected-Technical 506 5TH FLOOR GRANDE EDIFICE AKURLI ROAD OFF W E HIGHWAY KANDIVALI EAST 400101 MUMBAI MAHARASHTRA 400101 INDIA UDYAM MH 18 0005535 27AAGFE2360M1ZA R M MII STATUS AS VERIFIED | MUMBAI SUBURBAN | MAHARASHTRA | 400101 | - | - | Rejected-Technical Work Completion Certificate not submitted as per NIT and Form F not certified by CA |
| 4 | Rejected-Technical | - | - | Rejected-Technical Work Completion certificate not submitted as per NIT |
| Sl No | Description | Qty | Unit | PRAVIN CONSTRUCTION L1 | AV AND COMPANY L2 |
|---|---|---|---|---|---|
| 1.00Sub Estimate | |||||
| 2.00 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. | 1,759 | Square Meter | 265 ₹4,66,135 Lowest | 300 ₹5,27,700 |
| 3.00 | Providing and applying one pack bonding coat between concrete members like RCC slabs, columns, beams, chajjas, pardis etc and cement mortar plaster using Hack Aid Plast of approved make & approved by Engineer in charge. Clean the concrete surface thoroughly to remove dust, dirt, grime, deshuttering oils and rub down to a clean surface. Apply Hack Aid Plast of approved make & approved by Engineer in charge by spray on the entire concrete surface. Provide a lean cement - sand dash coat over the same. Allow the dash coat to set for around 24 hours. Further plastering as per specifications can continue. | 1,759 | Square Meter | 53 ₹93,227 Lowest | 70 ₹1,23,130 |
| 4.00 | Chipping of all loose and Spalling of concrete to bottom of slab, beams etc.(wherever required), cleaning of reinforcement, carrying out thorough sand blasting, application of anti-corrosive zinc rich epoxy primer to exposed reinforcement including cost of material, labour, equipment, tools, scaffolding etc. complete. | 1,759 | Square Meter | 570 ₹10,02,630 Lowest | 800 ₹14,07,200 |
| 5.00 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. | 1.5 | Metric Tonne | 89,703 ₹1,34,554.5 Lowest | 90,000 ₹1,35,000 |
| 6.00 | Making up lost section of concrete/ mortar with thixotropic repair mortar is one component thixotropic dual shrinkage compensated fibre r/f formulation for structural members build up section by hand packing as per manufactures specification applied by mean of hand gloves / by expert applicator. The rehabilitees surface should be free from air gaps, avoids sld be in line with existing required line. Line with existing surface includes curing, cleaning complete area etc. complete. Work sld be carried out with all safety measures like helmets, safety belts and adequate labour insurance under qualified supervisor etc. complete. Material HS 122 or equivalent. | 92,348 | kilogram | 66 ₹60,94,968 Lowest | 70 ₹64,64,360 |
| 7.00 | Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. | 1,759 | Square Meter | 625 ₹10,99,375 Lowest | 700 ₹12,31,300 |
| 8.00 | Providing and applying tactile quality acrylic/synthetic, semi viscous paste/plaster containing quartz aggregate acrylic polymer minerals specially formulated to withstand varying climate condition and provide a long lasting elegant look to the surface having very high aesthetic as well as protection value. Highly durable and maintenance free nontoxic and non-flammable 2 mm thick coating having PH value 8-9, specific gravity 1.7 kg/lit and hardness 4H.(Rates excluding GST) | 806 | Square Meter | 620 ₹4,99,720 Lowest | 800 ₹6,44,800 |
| 9.00 | P/fixing of carbon 100 mm x 1.4 mm carbon laminate with adhesive including of all manpower and equipments complete in all respect | 900 | Running Meter | 6,500 ₹58,50,000 Lowest | 7,000 ₹63,00,000 |
| 10.00Providing and fixing in position aluminium openable window of any size as per detailed drawing and as directed by Engineerincharge with all necessary alluminium sections including necessary fixtures and fastening with 5 mm thick clear float glass etc. complete. | |||||
Tender Value
₹1.8 Cr
EMD Value
₹1.5 L
Closing Date
23 Jul 2025, 5:00 pmClosed
Superintending Engineer Mumbai HQ
Office of Superintending Engineer, Mumbai, MIDC, Udyog Sarathi, Mahakali Caves Road, Andheri East, Mumbai- 93.
Tarapur Indl. Area. Strengthening and Repairing of Jack well with High strength repair mortar -Thixotropic- along with Pultruded carbon fibre plate-glass fibre sheet and arresting leakages with tactile quality material at T. I. A.
2025_MIDC_1198677_1
MIDC_Jack Well Tarapur_18080831
Open Tender
Civil Works - Water Works
Item Rate
Tarapur Industrial Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹18,880
₹1.5 L
1 Dec 2025
9 Jul 2025
25 Jul 2025
9 Jul 2025
23 Jul 2025
9 Jul 2025
9 Jul 2025 - 14 Jul 2025
Amount
Sub Estimate
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
Providing and applying one pack bonding coat between concrete members like RCC slabs, columns, beams, chajjas, pardis etc and cement mortar plaster using Hack Aid Plast of approved make & approved by Engineer in charge. Clean the concrete surface thoroughly to remove dust, dirt, grime, deshuttering oils and rub down to a clean surface. Apply Hack Aid Plast of approved make & approved by Engineer in charge by spray on the entire concrete surface. Provide a lean cement - sand dash coat over the same. Allow the dash coat to set for around 24 hours. Further plastering as per specifications can continue.
Chipping of all loose and Spalling of concrete to bottom of slab, beams etc.(wherever required), cleaning of reinforcement, carrying out thorough sand blasting, application of anti-corrosive zinc rich epoxy primer to exposed reinforcement including cost of material, labour, equipment, tools, scaffolding etc. complete.
Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Making up lost section of concrete/ mortar with thixotropic repair mortar is one component thixotropic dual shrinkage compensated fibre r/f formulation for structural members build up section by hand packing as per manufactures specification applied by mean of hand gloves / by expert applicator. The rehabilitees surface should be free from air gaps, avoids sld be in line with existing required line. Line with existing surface includes curing, cleaning complete area etc. complete. Work sld be carried out with all safety measures like helmets, safety belts and adequate labour insurance under qualified supervisor etc. complete. Material HS 122 or equivalent.
Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
Providing and applying tactile quality acrylic/synthetic, semi viscous paste/plaster containing quartz aggregate acrylic polymer minerals specially formulated to withstand varying climate condition and provide a long lasting elegant look to the surface having very high aesthetic as well as protection value. Highly durable and maintenance free nontoxic and non-flammable 2 mm thick coating having PH value 8-9, specific gravity 1.7 kg/lit and hardness 4H.(Rates excluding GST)
P/fixing of carbon 100 mm x 1.4 mm carbon laminate with adhesive including of all manpower and equipments complete in all respect
Providing and fixing in position aluminium openable window of any size as per detailed drawing and as directed by Engineerincharge with all necessary alluminium sections including necessary fixtures and fastening with 5 mm thick clear float glass etc. complete.
b) Powder Coated
Providing sills of required material 20mm to 25mm thick, on a bed of cement mortar 1:4 including cement float, filling joints with neat cement slurry, curing, moulding edges, polishing,cleaning complete. b) Granite
Providing and applying Elastomeric, Anti carbonation, Anti corrosive, UV resistant, Solvent based Pure Aliphatic Acrylate System- MONOPOL 456 on the exterior faces of Buildings Protection against ION penetration, carbonation,UV radiations and wethering effect conforming to ASTM D 4541-02 having Electrochemical impedance of 107 O and achieving dry film thickness of minimum 200 microns in a primer coat followed by two top coats using brush or spray after complete cleaning & removal of oil, grease or loose particles from the surface etc. complete.
Providing and applying plastic emulsion paint of approved quality, colour and shade to new surface in three coats including scaffolding, preparing the surface. (excluding primer coat) etc. complete.
Providing water proofing treatment as per IS : 1346-1966 to generally inaccessible sloping Reinforced Cement Concrete Terrace slab with bitumen felts in all positions in five course, consisting of applying cold bitumen primer coat at the rate of 2.5 litre per 10 Sq.m., hot bitumen layer at the rate of 14.50Kilogramper 10 Sq.m. and over the same layer of bitumen felt of type III grade (I) as per IS: 1332-1965 across the slope with 10 cm overlap commencing at lowest level and again applying hot bitumen course at the rate of 14.50Kilogramper 10 Square Metre. and finally spreading over it grit at the rate of 14.50Kilogramper 10 Square Metre. including all lifts, leads and scaffolding whenever necessary complete as directed with four years guarantee on requisite stamp paper etc. complete.
Lowering down the debris obtained from breaking and removing the cement plaster / burnt brick masonry of the first floor by any means without causing dust nuisance and damage to structure, stacking the same as and where directed including cleaning the site complete.
Sub Estimate 2 :- Control Room
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
Chipping of all loose and Spalling of concrete to bottom of slab, beams etc.(wherever required), cleaning of reinforcement, carrying out thorough sand blasting, application of anti-corrosive zinc rich epoxy primer to exposed reinforcement including cost of material, labour, equipment, tools, scaffolding etc. complete.
Providing and applying one pack bonding coat between concrete members like RCC slabs, columns, beams, chajjas, pardis etc and cement mortar plaster using Hack Aid Plast of approved make & approved by Engineer in charge. Clean the concrete surface thoroughly to remove dust, dirt, grime, deshuttering oils and rub down to a clean surface. Apply Hack Aid Plast of approved make & approved by Engineer in charge by spray on the entire concrete surface. Provide a lean cement - sand dash coat over the same. Allow the dash coat to set for around 24 hours. Further plastering as per specifications can continue.
Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Making up lost section of concrete/ mortar with thixotropic repair mortar is one component thixotropic dual shrinkage compensated fibre r/f formulation for structural members build up section by hand packing as per manufactures specification applied by mean of hand gloves / by expert applicator. The rehabilitees surface should be free from air gaps, avoids sld be in line with existing required line. Line with existing surface includes curing, cleaning complete area etc. complete. Work sld be carried out with all safety measures like helmets, safety belts and adequate labour insurance under qualified supervisor etc. complete. Material HS 122 or equivalent.
Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
Providing and applying tactile quality acrylic/synthetic, semi viscous paste/plaster containing quartz aggregate acrylic polymer minerals specially formulated to withstand varying climate condition and provide a long lasting elegant look to the surface having very high aesthetic as well as protection value. Highly durable and maintenance free nontoxic and non-flammable 2 mm thick coating having PH value 8-9, specific gravity 1.7 kg/lit and hardness 4H.(Rates excluding GST)
Providing and applying Elastomeric, Anti carbonation, Anti corrosive, UV resistant, Solvent based Pure Aliphatic Acrylate System- MONOPOL 456 on the exterior faces of Buildings Protection against ION penetration, carbonation,UV radiations and wethering effect conforming to ASTM D 4541-02 having Electrochemical impedance of 107 O and achieving dry film thickness of minimum 200 microns in a primer coat followed by two top coats using brush or spray after complete cleaning & removal of oil, grease or loose particles from the surface etc. complete.
Providing and applying 2 coats of 100% Pure acrylic low VOC and APEO & HCHO free water based paint of approved colour that belongs to class 1 flame spread resistance of approved make Paint should provide durable and long lasting silk finish with a high crack tolerance of upto 1mm. Paint should have an oustanding washability with high resistance to wide range of bacteria and fungus. Paint has to be applied on smooth and uniform surface prepared by an acrylic copolymer low VOC & Odour putty. This surface should be primed with water based low VOC Primer. The work activity should cover all aspects of applying paints from surface preparation as directed by Engineer in charge.
Providing water proofing treatment as per IS : 1346-1966 to generally inaccessible sloping Reinforced Cement Concrete Terrace slab with bitumen felts in all positions in five course, consisting of applying cold bitumen primer coat at the rate of 2.5 litre per 10 Sq.m., hot bitumen layer at the rate of 14.50Kilogramper 10 Sq.m. and over the same layer of bitumen felt of type III grade (I) as per IS: 1332-1965 across the slope with 10 cm overlap commencing at lowest level and again applying hot bitumen course at the rate of 14.50Kilogramper 10 Square Metre. and finally spreading over it grit at the rate of 14.50Kilogramper 10 Square Metre. including all lifts, leads and scaffolding whenever necessary complete as directed with four years guarantee on requisite stamp paper etc. complete.
Royalty Charges
Royalty Charges for Sand, Aggregate, Murum, Earth etc. (Bidder should Quote the same rate given as per Schedule B in tender document)
Testing Charges
QC testing @ 0.25% of estimated cost. (Bidder should Quote the same rate given as per Schedule B in tender document)
AV AND COMPANY (BID ID -6772830)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .