| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC 138 NAMGHAR PATH BARTILA BARBARI VIP ROAD GUWAHT 36 ASSAM | 360000 | ₹1.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L1₹1.3 CrRejected-AOC H NO 10 JYOTI NAGAR P O BAMUNIMAIDAM P S CHANDMARI KAMRUP M PIN 781021 | GUWAHATI | KAMRUP M | ASSAM | 781021 | ₹1.3 Cr | L1 | Rejected-AOC Not awarded |
| 3 | L1₹1.3 CrRejected-AOC | ₹1.3 Cr | L1 | Rejected-AOC Not awarded |
| 4 | L2₹1.4 Cr+₹14.2 L (11.1%)Rejected-AOC MAKUM JYOTINAGAR TINSUKIA | TINSUKIA | ASSAM | 786125 | ₹1.4 Cr+₹14.2 L (11.1%) | L2 | Rejected-AOC Not awarded |
| 5 | L3₹1.4 Cr+₹17.0 L (13.3%)Rejected-AOC ASSAM AS | NAGAON | ASSAM | 782001 | ₹1.4 Cr+₹17.0 L (13.3%) | L3 | Rejected-AOC Not awarded |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
20 Nov 2023, 2:00 pmClosed
Chief Engineer. PWD (Roads) Assam, Ghy-3
O/o the C.E. PWD (Roads) Assam, Ghy-3
Improvement of (i) Trinagar Madhab Nagar Path, Khanapara (Ward No. 60) (ii) Kailash Nagar path, Panjabari (Ward No. 60) with RCC Load Bearing drain and road works under Mukhya Mantrir Nagoriya Paki Path Nirman Aachoni (MMNPPNA) for the year 2023-24
2023_PWD_33340_28
CE/CW/20/23-24_nagariya_GHY
Open Tender
Civil Works – Roads
Item Rate
180 days
Guwahati
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,800
₹2.8 L
Yes
O/o the C.E. PWD (Roads) Assam, Ghy-3
11 Mar 2024
31 Oct 2023
20 Nov 2023
31 Oct 2023
20 Nov 2023
31 Oct 2023
31 Oct 2023 - 20 Nov 2023
8 Nov 2023
Amount
Labour for removal of mud, soil, silt from the road surface/debries from road side drain deposited at road side for removal after excavation upto 5.00Km out side the city area etc. By truck carriage including clearing, sweeping the road surface as necessary loading and unloading with all labour and materials etc. as directed by the deptt.
Water Bound Mecadam: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening /binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density.
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleanedwith Hydraulicbroom as per Technical Specification Clause 503.
Bituminous Concrete:Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Road Marking with Hot Applied Thermoplastic Compound with ReflectorisingGlass Beads on Bituminous Surface(Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications)
Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&H’s fixed to the road surface using the adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance
roviding and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminiumsheeting, 1.5 mm thick supported on GI pipe 50 mm dia firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 (ii) 600mm equilateral triangle
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminiumsheeting, 1.5 mm thick supported on GI pipe 50 mm dia firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 (iii) 600mm circular
RCC Cross Culvert: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I) Ordinary soil up to 3 m depth.
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork . (E) RCC Grade M20 a) Height upto 5m
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 17.50 A.Sandy material
Stone Masonry Guard Wall: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 17.50 A.Sandy material
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(i) For Grading I Material
Water Bound Mecadam: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening /binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density.
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork .(B) RCC Grade-M20 (a) Height upto 5.00M.
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204(II) 1:4 cement mortar.
Road Marking with Hot Applied Thermoplastic Compound with ReflectorisingGlass Beads on Bituminous Surface(Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications)
Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&H’s fixed to the road surface using the adhesives and the procedures recommended by the manufacturers with three months replacement warranty and free maintenance
Supplying, fitting and fixing ISMB beam, CI saddle etc. in position including necessary scafolding, cutting to the required size and repairing and replacement where necessary with painting etc. as directed by the deptt.
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 (ii) 600mm equilateral triangle
RCC drain with Load Bearing cover slab: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I) Ordinary soil up to 3 m depth.
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 A With crushed Stone (II) PCC Gr. M10.
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (Other ISI approved TMT reinforcement bar (SAI/BISCON/THERMAX or equivalent)) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork . (E) RCC Grade M20 a) Height upto 5m
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 I Sand filling
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 17.50 A.Sandy material
Jiban Gogoi
Ajit Bhattacheryaa
SRI SWADIP GOHAIN
MADAN BORO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .