Tender Value
₹1.5 L
EMD Value
₹4,395
Closing Date
1 Oct 2026, 6:00 pm3d left
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
DEVELOPMENT. OF LINK ROAD TO MASJID SHREEF AT GAZINAG BLOCK BRENG
2026_RDPR_325959_27
ENIT115of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹4,395
25 Sept 2026
25 Sept 2026
2 Oct 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing including removing vegetatin and in equalitites not exceeding 15cm deep and disposal of rubbish upto 50 m lead and 1.5 m lifg | - | Sqm | 24.12 | - |
| 2 | Earth work in excavation by manual means in trenches for foundations drains , pipes , cablesetc. (not exceeding 1.5 m in width ) and for shafts ,wells , cesspits and the like not exceeding 10 sqm on plan depth up to 1.5 m including disposal ofexcavated earth up to 1 m from cutting edge disposal earth is to be leveled and neatly dressed in all kinds of soil. | - | Cum | 479.3 | - |
| 3 | Providing and laying stone soling hand packed in foundation with plum complete with all costs and carriage 15kms | - | Cum | 990 | - |
| 4 | Providing and laying in position cement concrete of specified grade Of 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone agg.20 mm nominal size incl the cost and carriage of cement complete Excluding cost of centering and Shuttering all work up to plinth level. | - | Cum | 5,733.6 | - |
| 5 | Centering & shuttering including strutting & propping etc in foundations footings, bases of columns etc incl. removal of forms complete job. | - | sqm | 286.35 | - |
| 6 | Reinforcement of RCC work including straightening , cutting , bending, binding and placing in postion all complete TMT bars | - | Cum | 123.8 | - |
| 7 | Carriage of materials by mechanical transport
Sand & Bajri at an average lead of 35 kms | 18.66 | Cum | 575.54 | ₹10,739.58 |
| 8 | Add provison for carriage of cement shuttering and unforseen items etc . | 1 | ls | 1,500 | ₹1,500 |
| 9 | Provision for signboard & photographs and unforseen items | 1 | ls | 1,450 | ₹1,450 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1102254.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .