| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹11.5 L+₹1.2 L (11.4%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹11.6 L
EMD Value
₹12,000
Closing Date
21 Jul 2022, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT - AGAMT 2021-22 - Kaveripattinam Block - 1.Construction of Cycle Stand at Nattankottai Govt High School H/o.Sundekuppam 2.Construction of School Toilet Building (Girls) at Chinnamuthur PUP School H/o.Sundekuppam- Package TN-04-KRI-85
2022_RDTN_238811_1
RocNo_42_2022_R10_ 20_06_2022
Open Tender
Civil Works - Buildings
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,000
DRDA Krishnagiri
2 Aug 2022
2 Jul 2022
21 Jul 2022
2 Jul 2022
21 Jul 2022
2 Jul 2022
18 Jul 2022
Amount
1.Construction of Cycle Stand at Nattankottai Govt High School H/o.Sundekuppam - Rs.6.60627/- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation and basement with filling M-Sand including water consolidating etc.,
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Column Below GL
End Beam
Roof Slab Bottom
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Column Below grade beam
Column Above grade beam
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision of Name Board
2.Construction of School Toilet Building (Girls) at Chinnamuthur PUP School H/o.Sundekuppam - Rs.4.96/- Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Supplying and filling in foundation and basement with filling M-Sand including water consolidating etc.,
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers
Paving the floor with scratch proof design ceramic tiles of any colour and any size laid in CM 1:3, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly completed.
Dadooing walls with Colour Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard sepcification and as directed by the departmental officers size 150x150x6mm
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification.
Towards watersupply and sanitary arrangemens including all cost and conveyance of all at site etc., complete
4" PVC pipe
4" PVC Tee
4" PVC Y junction
3" PVC Air pipe
PVC tap 3/4"
PVC Elbow 3/4"
PVC pipe 3/4"
500 liter sintex tank
Wash basin
Steel mesh for incinerator
Supply of steel doors of following size including all cost at site etc., complete
Steel door
Steel door
Towards fixing of steel doors of following size including all cost at site etc., complete
Steel door
Supply of RCC Jolly
Roofing with best quality Tuflon sheet
Roof Top
MS square tube of 25.0x25.0x2.60 mm allround
Provision for Soak Pit for Septic Tank
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Collection and supply of sand filling into the basement including cost and conveyance to the site and all labour charges.
Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges.
Provision for Handrail
Provision for RCC cover slab for inspection chamber
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sivan Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .