Loading…
Loading…
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
5 Oct 2026, 4:00 pm
Executive Engineer PWD Division Poonch
Executive Engineer PWD Division Poonch
Restoration of PS Khawaja Attoli,Zone Mandi
2026_PWDJK_325139_3
e-NIT No.110/2026-27 dated 18-09-2026
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer PWD Division Poonch
₹4,000
Yes
18 Sept 2026
18 Sept 2026
6 Oct 2026
18 Sept 2026
5 Oct 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | 17.3 | Cum | 479.3 | ₹8,291.89 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with :1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.3 | Cum | 4,826.5 | ₹6,274.45 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 26.4 | Cum | 5,733.6 | ₹1,51,367.04 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 4.01 | Foundations, footings, bases of columns etc. for mass concrete. | 26.63 | Sqm | 286.35 | ₹7,625.5 |
| 5 | Dumping stone including cost of stones. On Horizontal on level. | 4.95 | Cum | 937.9 | ₹4,642.61 |
| 6Carriage of material by M.T incl loading/unloading & stacking complete | |||||
| 6.01 | Sand/Stone agg. below 40 mm nominal size avg. lead 18 Km by MT and 50 Mtrs by H.L | 37.3 | Cum | 584.43 | ₹21,799.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Tendernotice_2.pdf
PDF • 0.75 MB
BOQ_1097900.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .