Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.4 LAccepted-AOC | 1 | Accepted-AOC LOA Issued | |
| 2 | 2₹9.7 L+₹31,246.95 (3.31%)Rejected-Finance PLOT NO 17 NEAR POLICE REST HOUSE GROUND FLOOR PALAM ROAD SECTOR 22 GURUGRAM GURUGRAM HARYANA 122015 | GURUGRAM | GURUGRAM | HARYANA | 122015 | 2 | Rejected-Finance 2 | |
| 3 | 3₹9.9 L+₹49,982.95 (5.30%)Rejected-Finance C 46 OPP SECTOR 4 SURYA VIHAR GURUGRAM HARYANA | 2025 | 3 | Rejected-Finance 3 | |
| 4 | 4₹10.9 L+₹1.5 L (15.4%)Rejected-Finance E 32 FF SUSHANT LOK PHASE 3 EXT SECTOR 57 | 4 | Rejected-Finance 4 | |
| 5 | 5₹11.0 L+₹1.6 L (16.8%)Rejected-Finance | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | THE VENKATESHWARA COOPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED GURUGRAM L3 | THE DAT GREENS COOPERATIVE L AND C SOCIETY LIMITED L1 | The Lakhdatar Shyam Construction Cooperative Labour and Construction Society Ltd. L4 | THE SARASWATI WOMENS COOPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED L5 | THE ROYAL GORWAL COOPERATIVE MULTIPURPOSE SOCIETY LTD. L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply and fixing of cement pot at site with size 36-inch x 36inch round shape with MCG Logo alongwith painting, cast with cement concrete of nominal mix 1:2:4(1 cement:2 coarse sand:4 graded stone aggregate 6 mm nominal size), including required MS wire with 4mm thick jaal (approx 3 to 4 kg weight) and 50 mm wallI thickness from work, finishing with cement punning on exposed surface, curing for specified period and stacking in required rows and height, all complete as per direction of Officer-in-Charge. (A) Cost of pot@ Rs.1500 (B) Contractor profit 10%=Rs. 150 (C) OHC, handling, transportation charges 5%= Rs. 75 Total Cost per pot: - A plus B plus C=1500 plus 150 plus 75= Rs. 1725 18% GST= Rs. 310.5 (10% extra for causality only in accidental case) | 150 | Each | 1,500 ₹2,25,000 | 5 ₹750 Lowest | 1,665 ₹2,49,750 | 1,680 ₹2,52,000 | 1,300 ₹1,95,000 |
Tender Value
₹13.4 L
EMD Value
₹27,000
Closing Date
13 Apr 2026, 12:00 pmClosed
Tushar Yadav
Municipal Corporation Gurugram
Providing and fixing of bench and potted plant at various location in ward 34 zone II under MCG
2026_HRY_512742_1
2026034EBF8D 57A4 48E1 937A 6B86B871B28F285ULB
Open Tender
Civil Works
Works
90 days
Gurugram
2 documents required · 2 mandatory
₹1,000
₹27,000
Yes
4 May 2026
3 Apr 2026
13 Apr 2026
3 Apr 2026
13 Apr 2026
3 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and fixing of cement pot at site with size 36-inch x 36inch round shape with MCG Logo alongwith painting, cast with cement concrete of nominal mix 1:2:4(1 cement:2 coarse sand:4 graded stone aggregate 6 mm nominal size), including required MS wire with 4mm thick jaal (approx 3 to 4 kg weight) and 50 mm wallI thickness from work, finishing with cement punning on exposed surface, curing for specified period and stacking in required rows and height, all complete as per direction of Officer-in-Charge. (A) Cost of pot@ Rs.1500 (B) Contractor profit 10%=Rs. 150 (C) OHC, handling, transportation charges 5%= Rs. 75 Total Cost per pot: - A plus B plus C=1500 plus 150 plus 75= Rs. 1725 18% GST= Rs. 310.5 (10% extra for causality only in accidental case) | - | Each | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_591552.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .