Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | -29.83% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.5 L+₹13,192.03 (3.88%)Admitted-Fee/PreQual/Technical/Finance | -27.11% | ₹3.5 L+₹13,192.03 (3.88%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.6 L+₹22,116.05 (6.50%)Admitted-Fee/PreQual/Technical/Finance | -25.27% | ₹3.6 L+₹22,116.05 (6.50%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.8 L+₹39,673.09 (11.7%)Admitted-Fee/PreQual/Technical/Finance | -21.65% | ₹3.8 L+₹39,673.09 (11.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹4.1 L+₹66,590.64 (19.6%)Admitted-Fee/PreQual/Technical/Finance | -16.10% | ₹4.1 L+₹66,590.64 (19.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.8 L
EMD Value
₹9,700
Closing Date
27 Aug 2026, 4:00 pmClosed
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Kanir Canal-Construction of cement concrete drain at Dadwachoo minor of Kanir canal at RD-3680 downstream
2026_IFC_319452_3
enit05 of 08 2026
Open Tender
Civil Works
Percentage
20 days
Budgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹300
Chief Engineer Kmr I and FC Deptt.
₹9,700
29 Aug 2026
5 Aug 2026
29 Aug 2026
5 Aug 2026
27 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 59.33 | cum | 592.9 | ₹35,176.76 |
| 2 | Dumping of stones. in Horizontal on level. | 13.01 | cum | 237.9 | ₹3,095.08 |
| 3 | Supply of Stones (nallah) nominal size 225 mm | 13.01 | cum | 700 | ₹9,107 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 114.84 | sqm | 286.35 | ₹32,884.43 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 55.51 | cum | 5,733.6 | ₹3,18,272.14 |
| 6 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 114.84 | sqm | 283.8 | ₹32,591.59 |
| 7 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking
Soling Stone avg. lead 4 km | 13.01 | cum | 215.98 | ₹2,809.9 |
| 7.1 | 20mm Stone aggregate avg lead 4 kms from Chadoora | 49.4 | cum | 183.58 | ₹9,068.85 |
| 7.2 | Sand from Marvel avg. lead of 25 kms . | 26.47 | Cum | 465.14 | ₹12,312.26 |
| 7.3 | Cement avg. lead of 03 kms | 12.84 | MT | 147.41 | ₹1,892.74 |
stage.html
html • 0.02 MB
finance_1058216.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.86 MB
BOQ_1058216.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .