| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹39.5 CrAccepted-AOC 142 | ₹39.5 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹43.2 CrRejected-Finance | ₹43.2 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹46.2 CrRejected-Finance 1252 20 M AVNTIKA BHAWAN STATION ROAD MAINPURI | MAINPURI | MAINPURI | UTTAR PRADESH | ₹46.2 Cr | L-3 | Rejected-Finance L-3 |
Tender Value
₹55.3 Cr
EMD Value
₹1.1 Cr
Closing Date
25 Feb 2023, 5:00 pmClosed
Superintending Engineer
Superintending Engineer, Drainage Circle,Aligarh
Construction of Slope C.C. Lining and other verious work from Km 215.500 to 228.200 of UGC for 43 Cusec water supply to T.H.D.C. Khurja.
2023_UPIDC_776383_1
15/S.E/2022-23
Open Tender
Civil Works
365 days
SE DRAINAGE CIRCLE ALIGARHDRAINAGE CIRCLE ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.1 Cr
Yes
7 Jun 2023
20 Feb 2023
27 Feb 2023
20 Feb 2023
25 Feb 2023
20 Feb 2023
Amount
Earth work in filling and removing Bundh of canal and embankment by power tranported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty for proper completion of work as directed by Engineer In- charge.
Earth work in berm cutting in ordinary soil including all lead up to 75 M and lift 4.50 M the Earth from excavation to be used in filling embenkment ordisposed as spoil bank with proper ramming and dressing by manual labour or machine or as directed by Engineer In- charge.
Uprooting jhunds including disposal and dressing As per Direction of Engineer In Charge
Cleaning thick bushes & thorny jungle without uprooting with disposal As per Direction of Engineer In Charge
Earth work in excavation in Foundation in ordinary soil with disposal and dressing the surface to the required levels slope including 30m lead & lift upto 5 no etc as per direction of engineer in charge.
Providing and laying Cement concrete M15 (1:2:4) with cement , coarse sand , and 25mm to 10mm stone grit including cost of all material, labour and T&P etc.complete.
Centering and shuttering for C.C. work including all cost of material, labour and T&P etc.
Supplying and laying Fine sand (FM 1.50 or Avobe) under CC lining side slope of canal i/c all cost of material,labour and T&P etc complete.
Dewatering of foundation by 5 BHP including all cost of materials, labour and T&P etc. for proper completion of job as per direction by Engineer in-charge.
12.5mm thick cement plaster in 1:6 cement ,fine sand including cost of all material, labour and T&P etc. complete.
Painting on Top of sleeper with (Bitumen s-35 (60/70) or s90 (80/100) grade @ one kg /sqm including cost of all material, labour and T&P etc. complete.
Providing and laying 100mm thick C.C. ,M-15 (1:2:4) lining with Paver machine, Bantching plant etc. centering and shuttering, including cost of all material ,labour and T&P etc. complete.
Making construction joint in lined concrete surface as per drawing ,including painting with sealing primer and joint filling with sealing compound, including cost of all material ,labour and T&P etc. complete.
Supplying and fixing Sheet pile driving into the ground (Above 5 mt ) required depth including all cost of material cutting, welding , painting with bitumen, labour and T&P etc. (per M.T.) for proper completion of work.
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished . (Red sand stone)
Supplying and laying 300X300X40 mm precast CC tails (M-15 ) in 1:3 CM over 10 mm Thick cement mortar in 1:5 i/c all cost of material,labour and T&P etc complete.
Supplying, fixing and extraction of sheet piles driving into the ground for making bundhas and diversion of required depth including all cost of materials cutting, welding , Labour T&P all lead and lifts, cutting forming, fixing and maintaining them in position for proper completion of work as per direction of Engineer in-charge.
Laying C.C. in 1:3:6 cement, coarse sand and stone grit 10 to 25 mm. size.all cost of material, labour and T&P etc. complete.
M-100 Brick work in 1:4 cement and coarse sand mortar i/c all cost of material, labour and T&P etc. complete.
P/L cement Struck deep pointing in 1:2 cement sand mortar i/c all cost of material, labour and T&P etc. complete.
P/L 12.50mm thick cement plaster in 1:4 cement & Coarse sand mortar i/c cost of all material, labour and T&P
Dismentling existing plaster including disposal of refuse with in distance of 60 meters
Providing and fixing hand railing of approved size steel railing by welding and with primer coat of approved steel primer on steel railing etc. as directed by the Engineer-in -charge
Finishing outer wall with weather coat by (Asian or Berger Brand) of approved make and quality on old surface with two or more coat to give an even shade thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
Laying Single Flat Brick Lining in 1:4 Cm including cost of all material ,labour and T&P etc. complete.
M/s Kaiser Construction Engineers and Contractor
GLOBAL INFRATECH INDIA PVT LTD
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf