Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.7 LAccepted-AOC 108 JAYARAM REDDY GARDEN DODDA BANSWADI BANGALORE 560 043 | BENGALURU URBAN | KARNATAKA | 560043 | L1 | Accepted-AOC AOC | |
| 2 | L2₹34.7 L+₹924.50 (0.03%)Rejected-Finance 6TH CROSS STREET KAMARAJ NAGAR PALAYAMKOTTAI | PALAYAMKOTTAI | TIRUNELVELI | TAMIL NADU | 627002 | L2 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | Janatha Trading Corporation L1 | M/S POTHIRAJ AND CO L2 |
|---|---|---|---|---|---|
| 1.00 | Excavating over areas, n exc 1.5 m deep and getting out in hard / dese soil etc complete all as specified and as directed | 80 | CUBIC METRE | 400 ₹32,000 | 380 ₹30,400 Lowest |
| 2.00 | Excavating over areas, Exc 1.5 m but not exc 3.0 mtr deep and getting out in hard / dese soil etc complete all as specified and as directed | 84 | CUBIC METRE | 400 ₹33,600 Lowest | 400 ₹33,600 Lowest |
| 3.00 | Excavating over areas, Exc 3.0m but not exc 4.50 mtr deep and getting out in hard / dese soil etc complete all as specified and as directed | 92 | CUBIC METRE | 400 ₹36,800 Lowest | 420 ₹38,640 |
| 4.00 | Excavating over areas, Exc 4.50m but not exc 6.00 mtr deep and getting out in hard / dese soil etc complete all as specified and as directed | 96 | CUBIC METRE | 400 ₹38,400 Lowest | 450 ₹43,200 |
| 5.00 | Excavating in trenches n.exc. 1.5 mtr in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n.exc. 10 sqm on plan and and getting out in hard /dense soil complete all as specified and directed. | 76 | CUBIC METRE | 400 ₹30,400 | 380 ₹28,880 Lowest |
| 6.00 | Surface excavation n exe 30 cm deep and averaging 15 cm deep in soft/ loose soil and getting out. | 118 | SQUARE METRE | 120 ₹14,160 | 100 ₹11,800 Lowest |
| 7.00 | Excavating in trenches n.exe. 1.5 m width and n.exe. 1.5 m in depth for foundation in soft/loose soil & getting out. | 62.5 | CUBIC METRE | 400 ₹25,000 Lowest | 400 ₹25,000 Lowest |
| 8.00 | Removing excavated material n exc 50 m & depositing where directed at a level n exc 1.5 m. | 10.3 | CUBIC METRE | 125 ₹1,287.5 Lowest | 200 ₹2,060 |
| 9.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm thick with soil etc complete all as specified and as directed | 220.9 | CUBIC METRE | 90 ₹19,881 Lowest | 100 ₹22,090 |
| 10.00 | Removing excavated material exc. 250m but not exc 500 mtr and depositing where directed at a level n exc. 1.5 m above the starting point etc complete all as specified and as directed | 224.4 | CUBIC METRE | 150 ₹33,660 Lowest | 200 ₹44,880 |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
6 Jun 2026, 6:00 pmClosed
GE North Bangalore
GARRISON ENGINEER NORTH BANGALORE T 64 MEANEE LINESMEG AND CENTRE BANGALORE 560042
PROVN OF RECHARGE PITS FOR RAIN WATER HARVESTING AT 48 GR ADMC PROVN OF 04 URINAL POINT AT DEMOBEES BARRACK 04 28 MEN BARRACK DEPOT BN PROVN OF VEH PARKING SHED FOR 02 ALS AND PROVISION OF TOILET BLOCK NEAR URC BLDG NO T116 AT PCTC U
2026_MES_765898_1
8307
Open Tender
Civil Works
Item Rate
180 days
Bangalore
Class D Category a(i)
9 documents required · 9 mandatory
₹500
Yes
GARRISON ENGINEER NORTH BANGALORE
₹72,000
Yes
23 Sept 2026
16 May 2026
10 Jun 2026
16 May 2026
6 Jun 2026
30 May 2026
16 May 2026 - 30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating over areas, n exc 1.5 m deep and getting out in hard / dese soil etc complete all as specified and as directed | 80 | CUBIC METRE | - | - |
| 2 | Excavating over areas, Exc 1.5 m but not exc 3.0 mtr deep and getting out in hard / dese soil etc complete all as specified and as directed | 84 | CUBIC METRE | - | - |
| 3 | Excavating over areas, Exc 3.0m but not exc 4.50 mtr deep and getting out in hard / dese soil etc complete all as specified and as directed | 92 | CUBIC METRE | - | - |
| 4 | Excavating over areas, Exc 4.50m but not exc 6.00 mtr deep and getting out in hard / dese soil etc complete all as specified and as directed | 96 | CUBIC METRE | - | - |
| 5 | Excavating in trenches n.exc. 1.5 mtr in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n.exc. 10 sqm on plan and and getting out in hard /dense soil complete all as specified and directed. | 76 | CUBIC METRE | - | - |
| 6 | Surface excavation n exe 30 cm deep and averaging 15 cm deep in soft/ loose soil and getting out. | 118 | SQUARE METRE | - | - |
| 7 | Excavating in trenches n.exe. 1.5 m width and n.exe. 1.5 m in depth for foundation in soft/loose soil & getting out.. | 62.5 | CUBIC METRE | - | - |
| 8 | Removing excavated material n exc 50 m & depositing where directed at a level n exc 1.5 m. | 10.3 | CUBIC METRE | - | - |
| 9 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm thick with soil etc complete all as specified and as directed | 220.9 | CUBIC METRE | - | - |
| 10 | Removing excavated material exc. 250m but not exc 500 mtr and depositing where directed at a level n exc. 1.5 m above the starting point etc complete all as specified and as directed | 224.4 | CUBIC METRE | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
8307Tender.pdf
Tender Documents • 1.11 MB
BOQ_857775.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .