| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC NO 7 MUTHAMIZ STREET AAM NAGAR DV PURAM PONNERI TALUK TIRUVALLUR 601204 | PONNERI | TIRUVALLUR | TAMIL NADU | 601204 | ₹1.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹24,803.39 (0.14%)Rejected-AOC | ₹1.8 Cr+₹24,803.39 (0.14%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
25 Jun 2025, 3:00 pmClosed
Project Director/Joint Director
DRDA Tiruvallur
strengthening of BT Road from Madars Pulicut Road to Irulipattu Road via Neduvarambakkam in Neduvarambakkam Panchayat Sholavaram Block (R-98) Under NABARD RIDF XXXI 2025-26 Pac.01
2025_RDTN_567010_1
DIPR/2866/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Sholavaram Block
refer tender document
5 documents required · 5 mandatory
₹0
₹1.9 L
Yes
DRDA Tiruvallur
21 Jul 2025
10 Jun 2025
25 Jun 2025
10 Jun 2025
25 Jun 2025
16 Jun 2025
16 Jun 2025
Amount
Strengthening of BT Road from Madars Pulicut Road to Irulipattu Road via Neduvarambakkam in Neduvarambakkam Panchayat KM 0/0 - 2/950 in Sholavaram Block.
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking BT Surface Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc. as per Technical Specification Clause 303.1.(Subgrade using Carted Earth)
Gravel Shoulders Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Laying of Wet Mix Macadam(WMM) Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Slow Setting Emulsion (SS-1) 7.00 Kg Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Rapid Setting Emulsion (RS-1) 2.5 Kg Providing and laying Tack coat over BM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous macadam 50mm Thick Providing and laying 50mm Compacted thick Bituminous macadam using 26.50-11.2mm graded metal and 0.10 cum of 13.20-2.36mm grade metal with 37.00kgs of VG30/VG40 for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP asper clause 507 of MORTH Rev-5
Providing and laying Bituminous Concrete 25/30/40mm Thick (Grade-II) Using VG30 Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.3 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for KM Stone
Provision for HM Stone
Supply and fixing of Sign boards as per specification
Road Marking/ Road Stud with lens reflector
Construction of CC Road @ ch: 0/0 - 0/200
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
B JOTHEESWARAN (BID ID -1375634)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .