| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.4 CrAccepted-AOC | ₹5.4 Cr Quoted ₹5.8 Cr | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹5.8 CrRejected-Finance | ₹5.8 Cr | 2 | Rejected-Finance Non L1 Bidder |
| 3 | 3₹6.1 CrRejected-Finance B 101 GIDC ELECTRONIC ZONE SECTOR 25 GANDHINAGAR GUJARAT | GANDHINAGAR | GANDHINAGAR | GUJARAT | ₹6.1 Cr | 3 | Rejected-Finance Non L1 Bidder |
| 4 | 4₹6.2 CrRejected-Finance F 202 G201 SG BUSINESS HUB NR GOTA FLYOVER SG HIGHWAY GOTA AHMEDABAD 382470 | AHMEDABAD | AHMEDABAD | GUJARAT | 382470 | ₹6.2 Cr | 4 | Rejected-Finance Non L1 Bidder |
| 5 | 5₹6.6 CrRejected-Finance | ₹6.6 Cr | 5 | Rejected-Finance Non L1 Bidder |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
12 Feb 2026, 5:00 pmClosed
Sr. Manager
NTPC VIDYUT VYAPAR NIGAM LIMITED Engineering Office Complex, Plot No. A-8A Sector 24, Block A, Noida, Uttar Pradesh 201301
DEVELOPMENT OF 1000 KW GRID CONNECTED GROUND MOUNTED SOLAR POWER PROJECT AT GAIL AJMER
2026_NVVN_104497_1
NVVN/CandM/2025-26/RE-495
Limited
Miscellaneous Works
GAIL AJMER
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹10 L
28 Apr 2026
29 Jan 2026
13 Feb 2026
29 Jan 2026
12 Feb 2026
29 Jan 2026
29 Jan 2026 - 5 Feb 2026
( Ex-Works)
Solar Photovoltaic (SPV) Modules
Module Mounting Structure (MMS)
DC Cables
AC Cables
Power Conditioning Unit/ Inverters
LT Switchgear
HT Switchgear/RMU
Transformers
Earthing and lightning Protection
Illumination System
Remote Monitoring system
Module Cleaning System
Suitable Energy Metering Arrangement
Arrangement for evacuation of Solar Power
Misc. Equipment (other than Specified Above)
In case the description/quantity for any items mentioned in this schedule is at variance from what has been stated in the technical specifications and its subsequent clarifications, the stipulations of the Technical Specification and its subsequent amendment and clarification shall prevail.
Identification : Each equipment shall be clearly marked and labeled on the outside of the packing with its description when more than one part is packed in single case, a general description of the contents shall be shown on the outside of such case and a detailed list enclosed. All cases, containers and other packages must be suitably marked and numbered for the purpose of identification.
As such the Item Schedule includes all items/equipment necessary to complete the entire scope of works indicated in the Technical Specification & drawings and Bidding Documents , Bidder shall ensure that items not covered here but required to make the equipment / system complete in all respect for its safe and reliable, efficient and troublefree working / operation without any extra cost to NVVN
The prices quoted in Schedule Nos. 1 shall be inclusive of all Taxes, Duties, Levies & charges, except Goods and Services Tax (GST), payable in the Employer’s country as of seven (7) days prior to the deadline for submission of price bids. Goods and Services Tax (GST) applicable on goods and services specified in Schedule Nos. 1 shall not be included in respective schedules, but shall be quoted separately in Schedule No. 4
For the purpose of stage-wise payments, price breakup shall be finalised upon mutual discussion between the successful bidder and NVVN before award of the contract.
Solar PV modules and Inverter shall be necessarily procured from Class-I supplier only.Solar PV Module shall be from the models and manufacturers included in ALMM List-I and shall be using solar cells included in ALMM List -II as per MNRE’s orders and amendments issued from time to time.
Description
( Ex-Works)
Local Transporation & Inland Transit Insurance (Bidder to Quote Local Transporation & Inland Transit Insurance as a percentage of Ex Works Supply Portion)
Bidders are advised to price their bids in such a manner that Transportation including Transit Insurance Component (Schedule 2) of the bid price should not be more than 4% of the Ex-works Price of Main Equipment (Schedule-1).
The prices quoted in Schedule Nos. 2 shall be inclusive of all Taxes, Duties, Levies & charges, except Goods and Services Tax (GST), payable in the Employer’s country as of seven (7) days prior to the deadline for submission of price bids. Goods and Services Tax (GST) applicable on goods and services specified in Schedule No. 2 and 2' shall not be included in respective schedules, but shall be quoted separately in Schedule No. 4.
Description
( Ex-Works)
Installation Services and Civil & Civil Allied Works for Entire Equipment
Amount linked to Safety Aspects/ compliance to Safety Rules
1 . Bidders are advised to price their bids in such a manner that Installation Price Component of the bid price including Civil / Structural works price should not be less than 20 % of the Ex-works Price of Main Equipment. 2. Bidders are advised to price their bids in such a manner that the component for ‘Amount linked to Safety Aspects/ compliance to Safety Rules’ should not be less than 5% of the cumulative total of Service Portion of the Contract, i.e. Civil + Installation/ Erection + Structural Works.
The prices quoted in Schedule Nos. 3 shall be inclusive of all Taxes, Duties, Levies & charges, except Goods and Services Tax (GST), payable in the Employer’s country as of seven (7) days prior to the deadline for submission of price bids. Goods and Services Tax (GST) applicable on goods and services specified in Schedule Nos. 3 shall not be included in respective schedules, but shall be quoted separately in Schedule No. 4.
Bidder to submit break up for Installation & Civil Component during BBU approval. Installation shall include all the items mentioned in Schedule - 1. Civil works shall include: Topographical survey & Geotechnical investigation, Site Cleaning, Grading and Access roads, Foundations of Module mounting structures, Control cum Inverter Room, Drainage System as per site requirement, Transformer yard civil works and Other Misc Civil Works.
Operation & Maintenance (O&M) for 5 years
Operation & Maintenance (O&M) for 5 years
Description
O&M for 1st Year
O&M for 2nd Year
O&M for 3rd Year
O&M for 4th Year
O&M for 5th Year
Operation & Maintenance (O&M) for 10 years
1. Total Quoted O&M Cost for 5 years should not be less than 8 % of EPC price (Supply, Transportation & Installation services including Civil & Safety)
Bid Price Component
Supply of Plant & Equipment (Schedule-1)
Local transportation - Plant & Equipment (Schedule-2)
Installation Services including Civil & Allied Works (Schedule-3)
Amount linked to safety (Schedule-3)
O&M Charges (Schedule-3A)
(a) Schedule 1: Plant and Equipment to be supplied from within the Employer‟s country shall be quoted on EXW (Ex-Factory, Ex-Works, Ex-Warehouse or Off-the-Shelf, as applicable) basis in Schedule 1 and shall be inclusive of all costs as well as taxes, duties and levies paid or payable on components and raw materials incorporated or to be incorporated in the facilities.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
BOQ.xls
Additional Documents • 0.12 MB
Bid_documents.pdf
Tender Documents • 13.79 MB
Download all tender documents and submit your bid