| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹98.6 Craccepted-aoc | accepted-aoc |
Tender Value
₹93.9 Cr
EMD Value
₹93.9 L
Closing Date
12 Dec 2025, 4:30 pmClosed
Minor Irrigation Department
Sahana. K.S
FIVE (05) YEARS OPERATION & MAINTENANCE FOR LIFT IRRIGATION SCHEME PUMPING SECONDARY TREATED WATER FROM BENGALURU CITY TO FILL 126 TANKS OF KOLAR DISTRICT AND CHINTAMANI TALUK OF CHIKKABALLAPURA DISTRICT.
MI/2025-26/OW/WORK_INDENT7304
MI/2025-26/OW/WORK_INDENT7304
Open
Other Works
Two Tender Document System(Two Cover)
Minor Irrigation Division Kolar
6 documents required · 6 mandatory
3.2 To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2020-21, 2021-22, 2022-23, 2023-24 and 2024-25. b. Satisfactory completed (at least 90% of the contract value), as prime contractor, at least one similar work such as Construction of Lift Irrigation Scheme Along with 5 years of Operation & Maintenance / Operation & maintenance of Lift Irrigation Schemes for 5 years satisfactorily completion of O&M period in the past 05 years of Pumping Stations/ power plants/transformers etc., in any Government Departments, Public Sector Undertakings, Urban and Rural Water Boards and schemes and Municipal Corporations in India in one or more contract in which value of O&M should not be less than Rs. 4693.21 Lakhs.
3.2 To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2020-21, 2021-22, 2022-23, 2023-24 and 2024-25. c. Executed in any one year following minimum quantities of work: 1) Jungle Clearance- 2646446.00 Sqm. 2) Operation, Maintenance and repairs of Pumps / Motors not less than 3024 HP (Average):-03 Nos. 3) Operation, Maintenance and repairs of Electrical Sub Stations not less than 66 / 6.9 KVA:-05 Nos. 4) Operation, Maintenance and repairs of Jackwell cum Pump house:-05 Nos.
a. Availability by owning at least 50% of the required / specified key and critical equipment for this work and the remaining 50% can be deployed on lease / hire basis for all works provided, the relevant documents (Commitment agreements, RC book, Purchase invoice, sale deed, hire/lease deed , latest B-extracts, latest insurance copy etc.,) for availability for this work are furnished. 1) Excavator- 05 Nos (03 Own & 02 Hire / Lease) 2) Lorry / Tipper- 05 Nos (03 Own & 02 Hire / Lease).
3.2 To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2020-21, 2021-22, 2022-23, 2023-24 and 2024-25. a. Achieved in at least two financial years a minimum financial turnover (i.e from 2020-21 to 2024-25) (in all classes of civil engineering construction works only) of Rs. 18772.83 Lakhs.
b. Liquid assets and /or availability of credit facilities of not less than Rs. 514.07 Lakhs (Credit lines/letter of credit/certificates from banks for meeting the fund requirement etc.) in the format to be as prescribed below:
A copy of the GST registration certificate.
Latest copy of the Income tax clearance certificate & Sale tax clearance PAN and TAN Nos.
A copy of the Contractor Registration Certificate for Class-I and above.
₹7,500
₹93.9 L
12 Dec 2025
9 Dec 2025
15 Dec 2025
9 Dec 2025
9 Dec 2025
26 Nov 2025
5 YEARS OPERATION & MAINTENANCE FOR LIFT IRRIGATION SCHEME PUMPING SECONDARY TREATED WATER FROM BENGALURU CITY TO FILL 126 TANKS OF KOLAR DISTRICT AND CHINTAMANI TALUK OF CHIKKABALLAPURA DISTRICT
Deployment of Manpower for the O&M Contract for 1st Year Electrical Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract For 1st year ICA/SCADA Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract For 1st year Foreman-Electrical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract For 1st year Foreman-Mechanical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract For 1st year Foreman Instrumentation and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract For 1st year Manager and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 1st year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 1st year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 1st year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 1st year Electrician and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 1st year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 1st year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station(lift-1&2) for 1st year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 1st year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 1st year Seucrity Guards( Gravity Nalas) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 1st year Vehicle with fuel (2500km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3&4) for 1st year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3&4) for 1st year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3&4) for 1st year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3&4) for 1st year Electrician and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3&4) for 1st year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3&4) for 1st year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3) for 1st year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3&4) for 1st year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3) for 1st year Vehicle with fuel (2500km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 1st year
Security Guards(Gravity Nalas) and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 2nd year Electrical Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 2nd year ICA / SCADA Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 2nd year Foreman-Electrical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 2nd year Foreman-Mechanical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 2nd year Foreman Instrumentation and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 2nd year Manager and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 2nd year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 2nd year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 2nd year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 2nd year Electrician and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 2nd year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station(lift-1&2) for 2nd year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1) for 2nd year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 2nd year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 2nd year Seucrity Guards( Gravity Nalas) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 2nd year Vehicle with fuel (2500 km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4&6) for 2nd year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4&6) for 2nd year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4&6) for 2nd year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4&6) for 2nd year Electrician) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4&6) for 2nd year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4&6) for 2nd year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3&6) for 2nd year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4&6) for 2nd year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station(lift-3&6) for 2nd year Vehicle with fuel (2500km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 2nd year Seucrity Guards( Gravity Nalas) and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 3rd year Electrical Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 3rd year ICA / SCADA Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 3rd year Foreman-Electrical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 3rd year Foreman-Mechanical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 3rd year Foreman Instrumentation and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 3rd year Manager and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 3rd year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 3rd year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 3rd year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 3rd year Electrician and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station(lift-1&2) for 3rd year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station(lift-1&2) for 3rd year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1) for 3rd year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 3rd year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station(lift-1&2) for 3rd year Security Guards( Gravity Nalas) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1) for 3rd year Vehicle with fuel (2500km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 3rd year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 3rd year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 3rd year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 3rd year Electrician and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 3rd year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 3rd year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,5&6) for 3rd year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 3rd year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,5&6) for 3rd year Vehicle with fuel (2500km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 3rd year Security Guards( Gravity Nalas) and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 4th year Electrical Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 4th year ICA / SCADA Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 4th year Foreman-Electrical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 4th year Foreman-Mechanical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 4th year Foreman Instrumentation and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 4th year Manager and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 4th year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 4th year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 4th year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 4th year Electrician and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 4th year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 4th year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1) for 4th year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 4th year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 4th year Seucrity Guards( Gravity Nalas) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1) for 4th year Vehicle with fuel (2500km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 4th year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 4th year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 4th year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 4th year Electrician and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 4th year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 4th year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,5&6) for 4th year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 4th year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,5&6) for 4th year Vehicle with fuel (2500km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 4th year Seucrity Guards( Gravity Nalas) and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 5th year Electrical Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 5th year ICA / SCADA Engineer and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 5th year Foreman-Electrical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 5th year Foreman-Mechanical and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 5th year Foreman Instrumentation and as per the direction of the Engineer in charge.
Deployment of Manpower for the O&M Contract for 5th year Manager and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 5th year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 5th year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 5th year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 5th year Electrician and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 5th year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 5th year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1) for 5th year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 5th year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1&2) for 5th year Seucrity Guards( Gravity Nalas) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-1) for 5th year Vehicle with fuel (2500km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station(lift-3,4,5&6) for 5th year Pumping Station Supervisor and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station(lift-3,4,5&6) for 5th year Shift-in-Charge and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 5th year Pump Operator and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 5th year Electrician and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station(lift-3,4,5&6) for 5th year Helpers and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 5th year Gardener and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,5&6) for 5th year Driver and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 5th year Security Guards (Pumping Station) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,5&6) for 5th year Vehicle with fuel (2500km per month) and as per the direction of the Engineer in charge.
Deployment of Manpower at pumping station (lift-3,4,5&6) for 5th year Seucrity Guards( Gravity Nalas) and as per the direction of the Engineer in charge.
Clearing and grubbing land including uprooting rank vegetable grass, bushes, shrubs, saplings and trees up to 300mm girth by manual means, in areas of light jungle, removal of stumps, disposal of unse...
Cutting and removing jauliflora bushes up to 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete. Wit...
Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations complete. With all lead and lifts, and directed by the Engineer in charge of work.
Cleaning gates / hoists / embedded parts for re-painting by removing rust, old paint, grease by using wire brush, scrubber, rust remover including cost of all materials, labour, machinery, scaffolding...
Removing and hauling all kinds of soil / soft rock including boulders up to 0.6 m diameter slipped due to natural causes and disposing off the same in specified dump area or as directed by manual mean...
Cleaning concrete / masonry / rock surface for guniting / shotcreting by sand blasting method and cleaning by air and water jets after sand blasting as per specifications including cost of all materia...
Supplying and fixing rubber seals of approved quality including cost of all materials, labour, removing existing worn out / damaged bulb type rubber seals from gates, cleaning surface, making holes in...
Supplying and fixing rubber seals of approved quality including cost of all materials, labour, removing existing worn out / damaged bulb type rubber seals from gates, cleaning surface, making holes in...
Supplying and fixing rubber seals of approved quality including cost of all materials, labour, removing existing worn out / damaged bulb type rubber seals from gates, cleaning surface, making holes in...
Supplying and fixing rubber seals of approved quality including cost of all materials, labour, removing existing worn out / damaged bulb type rubber seals from gates, cleaning surface, making holes in...
Providing and applying grease of approved quality to gate and hoist components requiring greasing as part of the annual maintenance using grease gun wherever necessary including cost of all materials,...
Providing and applying cardium compound of approved quality to wire ropes of hoists / gantry cranes as part of the annual maintenance including cost of all materials, machinery, labour with all other ...
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of...
Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :Two coats on new work including preparing the surface after thoroughly cleaning oil, grease...
Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scratches including cost of labour, material complete as pe...
Removing the old paint from steel and / or other metal surface with hand scraping and making surface even including cost of labour, complete as per specifications. With all lead and lifts, etc. comple...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all all lead & lifts and as...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc. Complete with all lead & lifts and as per ...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Supplying, installing, testing and commissioning of spare parts whenever required during the maintenance period including, cost of all materials, labour etc., Complete with all lead & lifts and as per...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
INDEMNITY BOND MI.docx
Others - Indemnity Bond Format • 0.02 MB
mineral dispatch permit.zip
Instructions to Tenderers • 6.45 MB
star rates.pdf
Instructions to Tenderers • 2.13 MB
New Royalty Rate.pdf
Instructions to Tenderers • 4.03 MB
KW 4 Bid Document 7304.doc
Tender Document • 2.23 MB
Postponement Notification.pdf
pdf • 0.11 MB
Annexure 02 Spares 01.pdf
pdf • 0.01 MB
Annexure 04 Drawings.zip
zip • 46.27 MB
Annexure 01 Pump Motor.pdf
pdf • 0.25 MB
pre bid meeting proceedings.pdf
pdf • 1.80 MB
Annexure 02 Spares.pdf
pdf • 0.01 MB
Annexure 03 Valves.pdf
pdf • 0.02 MB
addendum.pdf
pdf • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .