Loading…
Loading…
Tender ID
Tender Value
₹14.2 L
EMD Value
₹15,000
Closing Date
25 Mar 2026, 6:00 pmClosed
EXECUTIVE ENGINEER UPSIC AGRA
EXECUTIVE ENGINEER UPSIC AGRA
CONSTRUCTION OF BOUNDARY WALL AMBEDEKAR PARK AT GRAM MADHUPURI BLOCK JAGEER DISTT. MAINPURI.
2026_MSME_1126319_12
1462/EE3/AGRA/UPSIC/2025-26
Open Tender
Civil Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EXECUTIVE ENGINEER UPSIC AGRA
₹15,000
17 Mar 2026
17 Mar 2026
26 Mar 2026
17 Mar 2026
25 Mar 2026
17 Mar 2026
Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 mt. And lead upto 30 mt. And including filling watering and ramming of excavated earth into the trenches or into the space between the byilding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer Incharge upto a distance of 30 m from the foundation trenches.4.1.1
Concrete with 4 cms guage stone ballast, coarse sand and cement in proportion of 12:6:1 in foundation and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of work.4.1.8
R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in foundation excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.5.1.2
R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in coloumn excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.5.2.2
R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 : 3 in lighter beam excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra.5.1.2
R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 : 3 in lighter beam excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra.5.3
Mild steel or iron in plain work such as reinforced cement concrete work wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping and hooks.( Analysis )
M-150 brick work in 1:4 one cement and four coarse sand in superstructure including necessary cutting and moulding of brick for walls of one brick thick including supply of all material, labour and Tools & Plants etc. required for proper completion of work.6.1.1+6.8A
12mm thick cement Plaster of 1 part cement 4 parts approved fine sand as ordered by the Engineer Incharge in the proportion including supply of all materials, labour & Tools and plants etc. required for proper completion of work and including proper curing.13.4.1
M.S or iron work in angle iron door frame &steel door including cutting welding from including cutting welding and wastage including supply of all material labour T&P etc. required for proper completion of work..10.31
Providing/Applying J.K. Wall/Birala putty on wall in two coat complete item.new 13.80
Painting or varnishing new work in small areas or new wood work with one coat (upto one sq. metre) of ready mixed priming paint and two coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour & Tools and plants etc. required for proper completion of the work. Paint to be used should confirm the ISI No. 13.62.1
Finishing wall with acrylic smooth exterior paint (Apex ) of required shade :New work approved brand of required shed on new surface new 13.46.1
S/F of 4X2.5 feet size granite stone at site including writing painting with graving and cartage up to site complete.
LESS 5% C.P.E.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_2100468.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .