| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.1 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹82.8 L+₹61,115.44 (0.74%)Rejected-Finance 2324 KARADUMADAM PUNGAMUTHUR ANANIMALAI UDUMALAI | ARIYALUR | TAMIL NADU | 608703 | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹86.0 L
EMD Value
₹86,000
Closing Date
12 Jul 2022, 3:00 pmClosed
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Improvements to 9 No.of Tank Ponds in Thirukazhukundram Block in Chengalpattu Having Package No.06
2022_RDTN_238642_1
RC No 4683.2022.A10 Dt.24.06.2022
Open Tender
Civil Works
Item Rate
90 days
Thirukazhukundram Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹86,000
O/o The Project Director DRDA Chengalpattu
3 Nov 2022
1 Jul 2022
12 Jul 2022
1 Jul 2022
12 Jul 2022
1 Jul 2022
5 Jul 2022
Amount
Part I Improvements at Kalli Kulam in Vittilapuram Panchayat Est Amt :Rs.17.71 lakhs
Earth work deloying earth moving machinery for desilting channel and forming bund
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
construction of Bathing Ghat
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Revetment
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Rough stone packing for revertment
Pointing for revertment in CM 1;3mix
Construction of Baby Pond
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Inlet and Silt trap
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Part II Improvements to Kattu Thangal in Vadakadambadi Panchayat Est Amt :Rs. 6.60 lakhs
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries and tippers for formation of bund in layes of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum Moidture Content) and compaction of each layer to 95% proctor dendity through deployment of appropriate compaction eqipement (+8-10T Power Roller / Vibtratory Power Roller / Short width +-0.90m with drum) power roller or vibratory power roller / fuel operated or elect operated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per spectification.
Earth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries
Extra watering and consolidation by power roller inculing hire charges
construction of Revetment
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Filling of sand including all cost and conveyance and labour charges etc.copmplete.
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. incl all charges .complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Cement concrete 1:3:6 for foundation using 40mm HBG metal etc. incl all charges .complete.
Rough Stone Dry Packing For Rivetment Work Complying With Standard Specifiction Including all cost and charges etc.complete
Pointing The RR Masonry with cm1:3 mix Including cost and conveyance of all materials to site and all labour charges etc.complete
Part III Improvements to Kanagan Kuttai in sadras in Sadurangapattinam Panchayat Est Am : Rs.7.79 lakhs
Clearing the Scrub jungles Including All Cost Of Labour Charges as per standard specifications
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Sectioning the Bund including Breaking of clouds ,tamping and sectoning etc.complete
Benching of old Embankment slopes etc.
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
Filling with Msand including cost and Conveyance of all charges etc.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
gravel picking for revertment
Rough stone packing for revertment
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Pointing for revertment in CM 1;3mix
Painting two coats with best quality
Part IV Improvements to Thattai Kuttai in sadras in Sadurangapattinam Panchayat Est Amt :Rs. 8.50 lakhs
Clearing the Scrub jungles Including All Cost Of Labour Charges as per standard specifications
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Sectioning the Bund including Breaking of clouds ,tamping and sectoning etc.complete
Benching of old Embankment slopes etc.
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
Filling with Msand including cost and Conveyance of all charges etc.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
gravel picking for revertment
Rough stone packing for revertment
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Pointing for revertment in CM 1;3mix
Painting two coats with best quality
Part V Improvements at Vannan Kuttai in Pudupattinam Panchayat Est Amt : 7.47 lakhs
Earth work deloying earth moving machinery for desilting channel and forming bund
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
construction of Bathing Ghat
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Baby Pond
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Inlet and Siltrap
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Part VI Improvements at Kosu Kuttai in Chinna colony in Vayalur Panchayat Est Amt :Rs. 7.20 lakhs
Earth work deloying earth moving machinery for desilting channel and forming bund
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
construction of Bathing Ghat
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Revertment
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Rough stone packing for revertment
Pointing for revertment in CM 1;3mix
construction of Baby Pond
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Inlet and Silt trap
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Part VII Improvements to Pongeli kuttai in Vayalur Panchayat Est Amt : Rs.7.70 lakhs
Earth work deloying earth moving machinery for desilting channel and forming bund
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
construction of Bathing Ghat
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Revetment
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Rough stone packing for revertment
Pointing for revertment in CM 1;3mix
construction of Baby Pond
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Inlet and Silt trap
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Part VIII Improvements to Palayathamman koil kulam in palayam village in Lattur Panchayat Est Amt :Rs.10.00 lakhs
Earth work deloying earth moving machinery for desilting channel and forming bund
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
construction of Bathing Ghat
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Revetment
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Rough stone packing for revertment
Pointing for revertment in CM 1;3mix
construction of Baby Pond
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
construction of Inlet and Silt trap
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:3:6 Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Part IX Improvements to Dhargas Thangal Eri in Manamai Panchayat Est Amt:Rs.13.00 lakhs
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technica
Earth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries and tippers for formation of bund in layes of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum Moidture Content) and compaction of each layer to 95% proctor dendity through deployment of appropriate compaction eqipement (+8-10T Power Roller / Vibtratory Power Roller / Short width +-0.90m with drum) power roller or vibratory power roller / fuel operated or elect operated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per spectification.
Earth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries
Extra watering and consolidation by power roller inculing hire charges
construction of Revetment
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Filling of sand including all cost and conveyance and labour charges etc.copmplete.
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. incl all charges .complete.
Centering with shuttering for all cc works including all other labour charges etc complete
Cement concrete 1:3:6 for foundation using 40mm HBG metal etc. incl all charges .complete.
Rough Stone Dry Packing For Rivetment Work Complying With Standard Specifiction Including all cost and charges etc.complete
Pointing The RR Masonry with cm1:3 mix Including cost and conveyance of all materials to site and all labour charges etc.complete
Reconstruction of Sluice 2 nos
Dismantling&Removing the Existing Damaged RR Masontry including all labour charges etc complete
Dismantling&Removing the Existing Damaged CC 1:4:8 Mix Base Concrete including all labour charges etc complete
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as storing shuddering and balling out water in necessary etc.completed for foundation as SS 20B.
Depth 0.0-0.30m
Depth 0.30-0.60m
Depth Above 0.60m
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bills as per special condition including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bills as per special condition including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete.
Upto 0.75m
Deck Bottom
Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered from the contractors bill at the rate of specified in the special conditions appended including handling charges for straightening, cleaning, cutting bending, tying grills with steel wire and hoisting and positioning before concerting joining of 20mm placing the reinforcement in correct position as specified including cost of electrodes and power for wilding typing wires, space bars cover blocks and all other incidental charges etc., completed.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including cost of cement which will be supplied and departmental section store attend the cost will be record from contractors bill at the rate of specified in the special conditions appended and including all other incidental charges etc., completed but executing cost and conveyance of steel fabrication charges and centering complete for Roof slab.
Plastering with cement mortar 1:5 20mm thick including cost & conveyance of all materials to work site including cement which will be supplied by the department from the departmental section store and the cost for the same will be recovered from the contractors bill at the rated and conditions specified in the special conditions from cement appended and all other charges etc., completed.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Palani
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .