Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical NO 202 OLD MAHABALIPURAM ROAD SHOLINGANALLUR CHENNAI 600 119 | CHENNAI | TAMIL NADU | 600119 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical NO 74 SADRAS MAIN ROAD NARASANKUPPAM VILLAGE 603109 MULLIKULATHUR POST THIRUKKAZUKUNDRAM TALUK CHENGALPATTU DISTRICT | CHENGALPATTU | TAMIL NADU | 603109 | Admitted-Fee/PreQual/Technical |
Tender Value
₹79.0 L
EMD Value
₹1.6 L
Closing Date
23 Sept 2026, 11:30 amClosed
Chief Engineer, CEG
CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Construction of Road and Storm Water Drain around RHIDS and SGIDS Building at North Plant, IGCAR, Kalpakkam
2026_IGCAR_925423_1
CEG/IGC/2227/2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.6 L
24 Sept 2026
9 Sept 2026
24 Sept 2026
10 Sept 2026
23 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation necessary in all types of soils for construction of roadway including dressing, trimming and compaction the cut formation in accordance with requirements of lines, levels, cross fall etc. all complete as per specifications and disposal of all cut surplus / unsuitable materials and stacking of suitable materials with all lifts and lead upto 1000metres as per clause 301 of MoRT&H specification for road and bridge works (5th revision) and as directed by the Engineer-in-Charge. | 1,400 | Cu.m. | - | - |
| 2 | Providing & Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & 28km lead, transporting to site, spreading, grading to required slope and compacted in layers, compacted to meet requirement of table No. 300-2 complete all as per clause 305 of MoRT&H specification for road and bridge works (5th revision) and as directed by the Engineer-in-Charge. | 330 | Cu.m. | - | - |
| 3Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete in all respects as per clause 401 of MoRT&H specifications for road and bridge works (5th revision) and as directed by the Engineer-in-Charge. | |||||
| 3.01 | for Grading-II material | 330 | Cu.m. | - | - |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete in all respects as per clause 406 of MoRT&H specifications for road and bridge works (5th revision) and as directed by the Engineer-in-Charge. Note : Item rate shall include conducting all field tests / lab tests. | 330 | Cu.m. | - | - |
| 5 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means complete in all respects as per clause 502 of MoRT&H specification for road and bridge works (5th revision) and as directed by the Engineer-in-Charge. | 1,100 | Sq.m. | - | - |
| 6 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributer at the rate of 0.20kg per sqm on the prepared bituminous/granular surface, cleaned with mechanical broom etc., complete in all respects as per clause 503 of MoRT&H specification for road and bridge works (5th revision) and as directed by the Engineer-in-Charge. | 1,100 | Sq.m. | - | - |
| 7 | Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of grading I (40mm nominal size), premixed with bituminous binder (of 60/70 grade) @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction density complete in all respects as per clause 507 of MoRT&H specifications for road and bridge works (5th revision) and as directed by the Engineer-in-Charge. Note : Item rate shall include conducting all field tests / lab tests. | 175 | Cu.m. | - | - |
| 8 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of grading I (19mm nominal size), premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects as per clause 509 of MoRT&H specifications for road and bridge works (5th revision) and as directed by the Engineer-in-Charge. Note : Item rate shall include conducting all field tests / lab tests. | 60 | Cu.m. | - | - |
| 9Earthwork excavation by mechanical means (Hydraulic excavator) for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-Charge. | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_972481.xls
BOQ • 0.30 MB
2227technicalbid.pdf
Tender Documents • 3.03 MB
2227Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
2227FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .