Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹1.9 Cr+₹13.3 L (7.51%)Rejected-AOC | ₹1.9 Cr+₹13.3 L (7.51%) | L2 | Rejected-AOC 2nd lowest |
| 3 | L3₹2.5 Cr+₹70.1 L (39.6%)Rejected-AOC | ₹2.5 Cr+₹70.1 L (39.6%) | L3 | Rejected-AOC 3rd lowest |
| 4 | Not Admitted-Fee/PreQual/Technical ASADUNA TODRAN TEHSIL BAHADURGARH DISTRICT JHAJJAR 124505 HARYANA | BAHADURGARH | JHAJJAR | HARYANA | 124505 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SURYAKANT CONTRACTOR L1 | The Sudkan Khurd Nehra Co Op L C Society Ltd L3 | KAVINDER CONTRACTOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Credit for old brickbats | 22.32 | Cum | 880 ₹-19,641.6 Lowest | 880 ₹-19,641.6 Lowest | 880 ₹-19,641.6 Lowest |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
10 Mar 2026, 6:00 pmClosed
RAHUL
Bhiwani W.S. Divn. Bhiwani
Estimate for providing pitching and strengthening from RD 48200 to 53200 of Bhiwani Ghaggar Drain.
2026_HRY_504714_1
20266B088CBC 2842 4D08 B379 1FD4283931E6127IRR
Open Tender
Civil Works
Works
100 days
BALIALI Ramupura
2 documents required · 2 mandatory
₹15,000
₹4.2 L
Yes
BHIWANI WS DIVISION BHIWANI
7 Apr 2026
24 Feb 2026
11 Mar 2026
24 Feb 2026
10 Mar 2026
24 Feb 2026
27 Feb 2026
Credit for old brickbats
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[14.4.1]Dressing side slopes and preparation of sub grade for lining in earth work, with admixture of kankar by mechanical/ mannual means 1. Up to 40 percent [Through rate]
[27.1]Brick masonry work in 1:3 in sub-structure including scaffolding complete excluding pointing and plastering, as per drawing and MoRTandH Specifications 1300 and 2200 [Through Rate]
[27.10.1.2]RCC Grade M25 1.2. With Batching Plant, Transit Mixer and Concrete Pump [Through Rate]
[27.38]Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and MoRTandH specifications 1600. [Through Rate]
[27.5]Plain/Re-inforced cement concrete in sub-structure complete as per drawing and MoRTandH specifications 1500,1700 and 2200. PCC Grade M15 (with concrete Mixer) Height up to 5m [Through Rate]
[35.10]Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Includes Mazdoor required for trimming of slope to proper profile and preparation of bed. [Through Rate]
[35.9.1]Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications 1. Stone/Boulder [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.22.1.2]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 1.2. All works above plinth and up to floor IV level : M-15 grade plain cement concrete (cement content considered @ 240 kg/cum) [Through Rate]
[6.22.1.3]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 1.3. All works above plinth and up to floor IV level : M-10 grade plain cement concrete (cement content considered @ 220 kg/cum) [Through Rate]
[6.22.2.3]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.3. All works up to Plinth Level : M-10 grade plain cement concrete (cement content considered @ 220 kg/cum) [Through Rate]
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate]
[7.22.3]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 3. Cement mortar 1:3 (1 cement : 3 coarse sand) [Through Rate]
stage.html
html • 0.05 MB
technical_583432.pdf
techsummary_583432.pdf
finance_583432.pdf
BOQ Comparative Chart
xlsx
finsummary_583432.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_583432.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .