Tender Value
₹1.5 L
EMD Value
₹2,920
Closing Date
7 Aug 2026, 6:00 pm6d left
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Repair and renovation of road from saheedi gate to shamshanghat w.no.4 Pyt Khera Lair Block Pouni Distt Reasi under capex DDC for the year 2026-27
2026_RDPR_318552_21
e-NIT No. 76 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
Reasi Pouni REASl
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹2,920
30 Jul 2026
30 Jul 2026
8 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 11.52 | Cum | 479.3 | ₹5,521.54 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 15.12 | Cum | 5,733.6 | ₹86,692.03 |
| 3 | Providing and laying of stone boulders apron laid in wire crates with 4mm dia G.I wire confirming to IS:280 and IS:4826 in100mmX100mm mesh (wiven diagonally) including 10% extra for laps and joints weighing not less than 25Kg each as per drawing and technical specification clause 1301 including all leads , lifts ,re-handling and including cost of wire crates complete. | 25.92 | Cum | 1,432.35 | ₹37,126.51 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 25.2 | Sqm | 286.35 | ₹7,216.02 |
| 5 | Construction of CIB (Include concrete/Brick pedestal of size 3' x 2'. Platering ,painting all complete job as per direction of Engineer-in-charge | 1 | No. | 3,000 | ₹3,000 |
| 6Carriage of material from source to site of work by MT/AT including loading, unloading and stacking complete. | |||||
| 6.01 | Stone 8.0KM by MT. | 22.03 | Cum | 291.45 | ₹6,420.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1051278.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].