Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 CrSame as L1Rejected-Finance WARD 18 RAJPUR GHAZIABAD | ETAWAH | UTTAR PRADESH | 206001 | ₹1.4 CrSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 Cr+₹15.8 L (11.6%)Rejected-Finance N A | NA | NA | 121004 | ₹1.5 Cr+₹15.8 L (11.6%) | L3 | Rejected-Finance L3 |
| 4 | L3₹1.5 Cr+₹15.8 L (11.6%)Rejected-Finance | ₹1.5 Cr+₹15.8 L (11.6%) | L3 | Rejected-Finance L3 |
| 5 | Rejected-Technical | - | - | Rejected-Technical all requried not complete |
Tender Value
₹1.6 Cr
EMD Value
₹4.8 L
Closing Date
24 Jun 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Construction of drain by RCC on one side (right side) of the road from Sain Chowk to Utsav Bhavan under Vijaynagar Zone.
2026_DOLBU_1158410_24
125/Nirman/2026-27 Date 06.06.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,387
₹4.8 L
27 Aug 2026
12 Jun 2026
24 Jun 2026
12 Jun 2026
24 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing Reinforced cement concrete or reinforced brick work including stacking of materials as per directed by the of Engineer - in -charge. | 22.5 | Cum | 1,340 | ₹30,150 |
| 2 | Dismantling sundries brick work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet) | 62.1 | Cum | 600 | ₹37,260 |
| 3 | Cleaning of silt/sludge in foul condition lift upto 30 m distance etc all completed as per direction of engineer in charge . | 270 | Cum | 100 | ₹27,000 |
| 4 | E/W in Excavation in foundation in ordinary soil etc all complete as the direction of engineer in charge. | 1,467.9 | Cum | 110 | ₹1,61,469 |
| 5 | Disposal of earth up to 8.00 Km from site including etc. all complete work. | 1,056.24 | Cum | 195.1 | ₹2,06,072.42 |
| 6 | Providing & supply gunny bags including cost of sand and stitching of bags and laying in position SOR-2017 New item 20.21(b) | 1,098 | Bag | 15 | ₹16,470 |
| 7 | Dewatering/Diversion of water by diesal engine pump including opretor,fuel,required length of flexible pipe for proper disposel of water etc all . | 160 | Hrs | 200 | ₹32,000 |
| 8 | Cement Concrete with 4 cm guge approved brick ballast, Fine sand & cement in the proportion of 12:6:1 including supply of all matrials, labour, tools and plants etc. required for proper completion of the work. | 120 | Cum | 4,000 | ₹4,80,000 |
| 9 | RCC work with cement, approved coarse sand and 2 cm gauge stone grit in proportions of 1:1.5:3 in slab wall etc excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG G.I.binding wire and including necessary centering and shuttering etc and supply of all materials, labour and tool & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. | 726 | Cum | 8,640 | ₹62,72,640 |
| 10 | Steel reinforcement for R.C.C work including straightening,cutting,bending,placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel Bars. | 569.91 | Cum | 8,166 | ₹46,53,885.06 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_2173934.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .