| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹88.3 LAccepted-AOC AT PO NAKEIPASI DANARA TALCHER ANGUL PIN 759103 | ANUGUL | ODISHA | 759103 | L-1 | Accepted-AOC Contract value is excluding GST | |
| 2 | L-2₹1.0 Cr+₹15.4 L (17.4%)Rejected-Finance | L-2 | Rejected-Finance Quoted amount excluding GST | |
| 3 | L-3₹1.1 Cr+₹17.1 L (19.3%)Rejected-Finance BYE PASS ROAD JEYPORE KORAPUT | KORAPUT | ODISHA | 763001 | L-3 | Rejected-Finance Quoted amount excluding GST |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
2 May 2025, 5:00 pmClosed
General Manager (Mech.), Erection and Maintenance,
General Manager (Mech.), Erection and Maintenance, OCC Ltd., Rasulgarh, Bhubaneswar
Replacement of Vertical Lift Gates in bay No.1,2,8 9 by dismantling, erection, commissioning , testing, construction of extra bay, walkway including painting of Malaguni Barrage near Rameswaram in Tangi Block of Khurda
2025_OCCL_112478_1
E-Procurement Notice No. 01/OCCL/2025-26(on-line)
Open Tender
Mechanical Works
Item Rate
180 days
Malaguni, Rameswarnm, Tangi
Please refer tender documents
3 documents required · 3 mandatory
₹11,800
₹1.2 L
23 Jul 2025
17 Apr 2025
3 May 2025
17 Apr 2025
2 May 2025
17 Apr 2025
17 Apr 2025 - 28 Apr 2025
Amount
VERTICAL LIFT GATES ( Size 12200 mm x 3650 mm) - 04(Four) Sets.
Dismantling, removal & shifting of 04 (Four) sets of old Vertical lift Gates to designated place as decided by the Client.
Erection, Commissioning, Testing of 04 (Four) sets of new Vertical lift Gates
Repair, Replacement of hoist materials including fixing of wire ropes with application of cadmium compound, fixing of covers for hoists, fixing of position indicator parts, hand drive etc. for 09(Nine) sets of rope drum hoist assemblies.
Painting of 06(six)) sets of Vertical lift Gates after sand blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include hire charge of compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of 09 (Nine) sets of rope drum Hoists for 09(Nine) sets Barrage Bay Gates after blast cleaning process performed with as per requirements & class 'B' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint confirming to IS 2932 : 1974 to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include hire charge of compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
STOPLOGS ( Size 12200 mm x 1267 mm) - 09(Nine) Sets & LATCH ARRANGEMENTS
Cost for fixing of 32mm dia anchor bolts by drilling 36 mm dia 700 mm long holes in existing pier and chemical grouting with bond chemical from reputed manufacturer having bond strength not less than 1.6 MPa including material, hire charges of machinery, labour and transportation charges.
Erection of 2nd Stage Embedded Parts for 09 (Nine) Sets of stoplog grooves for Barrage Bay.
Erection of 04 (Four) Nos of stoplog segments of size 12000mm x 1267mm for Barrage Bay.
Erection of Stoplog latch arrangements for 09 (Nine) Nos. of Barrage Bay
Cost of fixing of 20 mm dia anchor bolts by drilling 24 mm dia 600 mm long holes in existing pier and chemical grouting with bond chemical from reputed manufacturer having bond strength not less than 1.6 MPa including material, hire charges of machinery, labour and transportation charges.
Painting 04(four) of Stoplog segments of size 12200mm x 1267mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include hire charge of compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of 09 (Nine) sets of latch arrangements for 09(Nine) Nos. of bays after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include hire charge of compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
LIFTING BEAM, MONORAIL SUPPORTING STRUCTURE AND MONORAIL WALKWAY
Erection of 01 (One) set of Lifting Beam
Painting of 01(one) set of Lifting Beam after blast cleaning process performed with as per requirements & class C or Class B of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include hire charges of compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting
Erection of 10(Ten) sets of Monorail supporting structures including column, short column, cross beam and monorail beam.
Painting of 11 (Eleven) sets of Monorail supporting structures including painting of Monorail supporting structures of Extra Bay after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include hire charge of compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Cost of fixing of 22 mm dia anchor bolts by drilling 26 mm dia 600 mm long holes in existing pier and chemical grouting with bond chemical from reputed manufacturer having bond strength not less than 1.6 MPa including material, hire charges of machinery, labour and transportation charges.
Erection of 09 (Nine) Nos. of Monorail walkway
Painting of 09(Nine)) Nos. of Monorail walkway after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Finishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include hire charge of compressor, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Dismantling of existing concrete
Cost of fixing of 16 mm dia anchor bolts by drilling 20 mm dia 200 mm long holes in existing sill beam groove and chemical grouting with bond chemical from reputed manufacturer having bond strength not less than 1.6 MPa including material, hire charges of machinery, labour and transportation charges.
2nd stage concreting of 2nd stage embedded parts for Barrage Bay by M25 grade concrete using 20mm and down graded agregates.
CONSTRUCTION OF EXTRA BAY:- Footing for extra bay by excavation of earth in all kind of soil PCC(1:4:8), M-10/RCC grade M-25 for concreting using 40mm and downgradeed crusher broken hard granite aggregates of approved grades from approved quarry free from weathered skin surface, dust and any other deleterious materials as per drawing and specificationwith all leads, lifts, de-lifts including cost of carrige, royality and all other taxes of all materias mixing and vibrating concrete by mechanical means including shuttering and supply of all T&P,machinery, labour charges, cost and carrige of water for mixing concrete and curing including hire and running charges of all machinery, equipments, constructions/ erection and removal of gangway staging, scaffolding, incidental charges complete including cost of all materials like steel(Reinforcement, cement etc as per drawings and direction of the Engineer-in-charge.
Excavation of foundation
Sand filling in foundation & plinth
P.C.C. M-10 (1:4:8), M-10 with 40mm down graded crusher broken granite stone
R.C.C . M-25 for footing & pedesral with 20mm down graded with 20mm down graded crusher broken granite stone
Reinforcement for RCC
Centering & shuttering for footing & pedestal (Form Work of RCC)
Removal of debrs from worksite
Erection of of Trestles 02(Two) sets on extra bay for travel of Monorail crane 15T capacity as per drawing & direction of the Engineer-in-charge.
BALAJI DRILLERS AND ENGINEERS (BID ID -2903770)
NEELAMADHAB ENGINEERING WORKS (BID ID -2903698)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .