Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹81.4 L
EMD Value
₹6.1 L
Closing Date
26 Feb 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Unnao Circle PWD Unnao
SE Unnao Circle PWD Unnao
Construction of Gopal Kheda to Dewarakala link road with Five year maintenance
2026_CEUCZ_1118026_5
510MT/1MT/E-Tender/UC/2025 Dt. 30-01-2026
Open Tender
Civil Works
Fixed-rate
180 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹6.1 L
Yes
10 Apr 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including labour Cess & Excluding GST)
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including labour Cess & Excluding GST)
Granular Sub-base with Well Graded Material (Table 400.1) (A)By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i)For Grading I Material (Including labour Cess & Excluding GST)
Providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of sub-base. (Including labour Cess & Excluding GST)
Providing, laying and spreading material on prepared sub-base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of base. (Including labour Cess & Excluding GST)
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including labour Cess & Excluding GST)
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30-0.40 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Including labour Cess & Excluding GST)
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Case - I By Manual Means (I) Bitumen (S-90) (Including labour Cess & Excluding GST)
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 A. By Manual Means Case - III : Type C (I) Bitumen (S-90) (Including labour Cess & Excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.as per drawing and technical speficiations Clauses 802,803,1202 & 1203 (Including labour Cess & Excluding GST)
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 (Including labour Cess & Excluding GST)
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 (Including labour Cess & Excluding GST)
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets - 1000 mm dia hume pipe (Including labour Cess & Excluding GST)
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets 350 mm dia hume pipe (Including labour Cess & Excluding GST)
Maintenance of Constructed Road for next Five Year after the actual date of completion,Total maintenace Cost 7.50% of BOQ shall be paid in the form of installment as below,The payment shall be the inclusive of cess but Excluding GST,Payment shall be done as per satisfaction of Engineer-in-Charge regarding maintenance work carried out by Contractor. (i) From Completion of 1 Year to 2nd Year 0.75% of Bill Amount.
(ii) 2nd Year to 3rd Year 1.25% of Bill Amount.
(iii) 3rd Year to 4th Year 2.00% of Bill Amount.
(iv) 4th Year to 5th Year 3.50% of Bill Amount.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_2077941.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .