Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance NA | ₹5.0 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹5.0 L+₹4,104.47 (0.82%)Accepted-Finance TAMIL NADU TAMIL NADU TAMIL NADU | COIMBATORE | TAMIL NADU | 638459 | ₹5.0 L+₹4,104.47 (0.82%) | L2 | Accepted-Finance Accepted |
Tender Value
₹6.7 L
EMD Value
₹6,800
Closing Date
14 Aug 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
FORMATION OF FOOTPATH AT AGATHIAR NAGAR 7TH STREET IN DIV 95 UNIT 21 ZONE 08
2026_CoC_690294_1
Z.O.VIII.C.NO.E1/1400/2026
Open Tender
Civil Works
Works
90 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,800
17 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Open excavation by Mechanical Means for... the departmental officers. (Excluding Refilling) | 13 | CUM | 199.33 | ₹2,591.29 |
| 2 | Plain Cement Concrete 1:2:4 (one cement, two crush...departmental officers.-Mixing by mechanical means | 5 | CUM | 7,255.21 | ₹36,276.05 |
| 3 | Providing and laying, spreading and compacting gra... Is Applicable Only If Work Is Done During Night) | 11 | CUM | 2,734.71 | ₹30,081.81 |
| 4 | Supplying And Fixing of Rubber Moulded Grey Premiu...o Full Depth Curing Thread Lining Etc Complete . | 90 | MTR | 893.29 | ₹80,396.1 |
| 5 | Providing And Laying In Position, Standarded Concr...The Department For The Excess Usage of Materials). | 27 | CUM | 9,398.08 | ₹2,53,748.16 |
| 6 | White washing two coats with freshly burnt white s...lying with standard specification and as directed. | 60 | SQM | 43.53 | ₹2,611.8 |
| 7 | Painting New Plastered Wall Surface with Two finis...ed by the Executive Engineer before use on works.) | 60 | SQM | 201.05 | ₹12,063 |
| 8 | Construction of cast -in- situ Silt Catch Pit of i... x 450mm -25 MT -completing the finishing work etc | 12 | EACH | 17,562.84 | ₹2,10,754.08 |
| 9 | Supplying and fixing of 24" FRC manhole cover with...ll be painted with anti corrosive bitumastic paint | 10 | EACH | 4,434.3 | ₹44,343 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_829835.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .