Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 CrAccepted-AOC 3RD FLOOR KAY M PLAZA GANESHGURI G S ROAD GUWAHATI 06 | GUWAHATI | ASSAM | ₹21.7 Cr | L1 | Accepted-AOC Successful Bidder |
| 2 | L2₹21.8 Cr+₹17.5 L (0.81%)Rejected-Finance | ₹21.8 Cr+₹17.5 L (0.81%) | L2 | Rejected-Finance Unsuccessful Bidder |
| 3 | Rejected-Technical 4A SWAIKA CENTRE POLLOCK STREET DALHOUSIE KOLKATA WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | Dhar Construction Company L1 | Industrial Systems LLP L2 |
|---|---|---|---|---|---|
| 1.00New 11KV Lines: ( 61.62 Km) | |||||
| 1.01 | Galvanised Steel Tubular Pole SP-60 - 12 mtrs(H/D) | 370 | Nos. | 1,27,03,210 ₹1,49,89,787.8 | 1,17,65,630 ₹1,38,83,443.4 Lowest |
| 1.02 | Galvanised Steel Tubular Pole SP-60 - 12 mtrs(N/D) | 370 | Nos. | 84,90,020 ₹1,00,18,223.6 | 79,85,710 ₹94,23,137.8 Lowest |
| 1.03 | Galvanised Steel Tubular Pole 9.5 mtrs | 739 | Nos. | 1,37,54,268 ₹1,62,30,036.24 | 1,31,32,030 ₹1,54,95,795.4 Lowest |
| 1.04 | ACSR"Raccoon" conductor | 18 | km | 16,40,664 ₹19,35,983.52 Lowest | 17,65,692 ₹20,83,516.56 |
| 1.05 | ACSR"Weasel" conductor | 176 | km | 65,73,952 ₹77,57,263.36 Lowest | 69,27,360 ₹81,74,284.8 |
| 1.06 | G.I Channel cross arm 75×40×4.8×2280 mm | 1,109 | Nos. | 19,08,589 ₹22,52,135.02 | 19,03,044 ₹22,45,591.92 Lowest |
| 1.07 | G.I Channel cross arm/ V Cross arm 75×40×4.8×1200 mm | 678 | Nos. | 6,22,404 ₹7,34,436.72 | 6,12,912 ₹7,23,236.16 Lowest |
| 1.08 | G.I Channel top bracket 75×75 * 40 *4.8 * 310 mm | 678 | Nos. | 1,60,008 ₹1,88,809.44 | 1,58,652 ₹1,87,209.36 Lowest |
| 1.09 | Polymer 11 kV ( Double) Disc insulator ( 45 KN) | 924 | Set | 1,76,484 ₹2,08,251.12 Lowest | 3,84,384 ₹4,53,573.12 |
Tender Value
₹23.0 Cr
EMD Value
₹46.1 L
Closing Date
23 Sept 2025, 1:00 pmClosed
Chief Engineer(Projects)
MeECL Lumjingshai Shillong
Development of Distribution Infrastructure for Additional Household electrification in South Khasi Hills Distribution Division (Package-III)
2025_MeECL_1793_1
T-239/Pt-I/2025-26/84-PkgIII
Open Tender
Electrical Works
Turn-key
540 days
Meghalaya
Please refer Tender documents.
3 documents required · 3 mandatory
₹47,200
The CE(Projects), MePDCL, Principal Accounts
₹46.1 L
15 Jul 2026
10 Sept 2025
23 Sept 2025
10 Sept 2025
23 Sept 2025
18 Sept 2025
10 Sept 2025 - 19 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1New 11KV Lines: ( 61.62 Km) | |||||
| 1.01 | Galvanised Steel Tubular Pole SP-60 - 12 mtrs(H/D) | 370 | Nos. | - | - |
| 1.02 | Galvanised Steel Tubular Pole SP-60 - 12 mtrs(N/D) | 370 | Nos. | - | - |
| 1.03 | Galvanised Steel Tubular Pole 9.5 mtrs | 739 | Nos. | - | - |
| 1.04 | ACSR"Raccoon" conductor | 18 | km | - | - |
| 1.05 | ACSR"Weasel" conductor | 176 | km | - | - |
| 1.06 | G.I Channel cross arm 75×40×4.8×2280 mm | 1,109 | Nos. | - | - |
| 1.07 | G.I Channel cross arm/ V Cross arm 75×40×4.8×1200 mm | 678 | Nos. | - | - |
| 1.08 | G.I Channel top bracket 75×75 * 40 *4.8 * 310 mm | 678 | Nos. | - | - |
| 1.09 | Polymer 11 kV ( Double) Disc insulator ( 45 KN) | 924 | Set | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
SBDPkgIII.rar
Tender Documents • 37.72 MB
BOQ_1952.xls
BOQ • 1.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .