Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
16 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
+ Capital Works)
TELE
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N OR 'V' Whichever is less; where. V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per ANNEXURE-XXXIII, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- "Trenching, laying, jointing, splicing, testing and commissioning of optical fiber and 4/6 Quad cable including installation of pig tails and termination box. OR Trenching, laying, splicing, testing and commissioning of optical fiber cable including installation of pig tails and termination box"
8 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tender document, Scope of work & GCC 2022 are attached with the tender.
Replacement of 6 quad cable of various sections of Mumbai Division.
CR-BB-TELE-2026-54
CR-BB-TELE-2026-54
Open
Works - General
12 Months
Mumbai, Maharashtra
₹0
₹4.2 L
16 Jun 2026
13 May 2026
2 Jun 2026
32 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 90,17,876.24 | ||
| — | 123.00 | — | — | ||
| Supply of Thermo-Shrink cable joining kit (Reinforced) TSF-2 type generally confirming to RDSO specification RDSO/SPN/TC/57/2015 Rev 1 with modified kit contents as per CSTE's Specification No.:CR/SPN/TC/57 (A)/2015 Dt: 06.01.2015 (Table-A) to be suitable for jointing both 10/20/50 pair PIJF and 4/6 Quad cables alongwith sub-kit (Table-B) for armour continuity. Inspection by consignee. | — | — | — | 3,93,329.4 | |
| — | 2501.00 | — | — | ||
| SUPPLY OF "C" CHANNEL CLAMPS with nut bolts, washers and all type fixures for 6 inch dia pipe to be fixed on GIRDERS, on rock cuttings etc. as per DRG No.-SK-900. Inspection by consignee. | — | — | — | 55,09,853.06 | |
| — | 94.00 | — | — | ||
| Preparation of cable route plan, cable coreage plan, location particulars, Cable termination rack particulars, cable meggering report, earth resistance particulars, Traction bonding diagram, 1/2 wire count sheet and any other drawing in Autocad in A3/A4 size. The contractor shall initially supply 3 sets of circuits complete for approval of Railways. Railways will return one set to the contractor duly approved with alterations/corrections if any. The contractor shall incorporate Railways alterations/corrections in the tracings without any deviation and submit all tracings complete in all respects to the Railways . This includes submission of final cable route plan as per laid cable duly measured at every 30m clearly indicating distance of laid cable from fixed point of reference & indicating all track crossings and tail cables. This also include designing of cable coreage plan based upon I.P in consultation with engineer-in-charge - for small/medium yards. Inspection by consignee. | — | — | — | 21,75,473.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022-withACS10.pdf
ATTACHMENT
ACS11GCCWorks.pdf
ATTACHMENT
2026-54TenderDocquadcablerepl22052026m.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .