| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.6 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹31.7 L+₹4.1 L (14.8%)Rejected-AOC | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 3 | L3₹34.5 L+₹6.8 L (24.7%)Rejected-AOC | L3 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 4 | L4₹36.4 L+₹8.8 L (31.8%)Rejected-AOC | L4 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 5 | L5₹37.9 L+₹10.3 L (37.2%)Rejected-AOC 158 ARATH BAZAR KASAULI 173204 HP | KASAULI | SOLAN | HIMACHAL PRADESH | 173204 | L5 | Rejected-AOC OTHER THAN LOWEST BIDDER |
Tender Value
₹42.3 L
EMD Value
₹84,560
Closing Date
15 Aug 2020, 6:00 pmClosed
S F AUGUSTINE GE KASAULI
MES OFFICE KASAULI
OUTSOURCING OF WATER SUPPLY INSTALLATIONS AT MIL STATION KASAULI
2020_MES_362335_1
GEK-32/2020-21
Open Tender
Miscellaneous Works
Item Rate
330 days
KASAULI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE KASAULI
₹84,560
Yes
28 Aug 2020
20 Jul 2020
18 Aug 2020
20 Jul 2020
15 Aug 2020
3 Aug 2020
Amount
Schedule 'A' Section - I
Maintenance and Operating services of water supply pumping installation near Nouti Gaon village at P-2 pump house for 24 hrs having installed equipment/machinery as follows:- (a) Centrifugal multi stage pump set directly coupled with 220HP 3 phase electric motors- 3Nos. (b) 300 KVA voltage stablizer = 01 No. (c) 380 KVA DG Set = 01 No. (d) Main LT panels = 01 No. (e) Motor control Auto tranformer starter panels = 03 Nos. (f) water storage reservoir capacity 30000 Glns = 01 No. (g ) Sluice valve/Gate valve/Non return valve = 15 Nos. (with deployment of operating staff one tradesman (FGM) in each shift for three shifts per day (each shift of 08 hours). The shift timing for the month during contract period shall be as directed by Engr-in- charge. The Contractor will also be responsible for routine/preventive maintenance of eqipments and accessories , cleaning of surrounding area of the installation and the building inclusive of minor repair for leakage like providing gland packing, replacement of flange gasket and maintenace of control panel of DG set / pumping set/LT panel and tightening of loose connections in panels etc. and routinge/periodic maintenance as under :- Note : The following routine/preventive measures of above equipment /plant deemed to be included in the unit rates qouted against this item :- (A) pumping Set (i) Bearing lubrication using grease gun. (ii) Repair to leakage on pump set suction/delivery valve. (iii) Replacement of gland packing (iv) checking of coupling, bolts, nuts etc. (v) Ensuring proper voltage, amp and function of APFC panel. (vi) Checking of Electric LT panel/ATS Panel and tightening of electric connections etc. (vii) Maintenance of daily log sheet . (B) water Reservoir (i) Checking water level indicators. (ii ) Cleaning /repair of control valve and valve pit.
Maintenance and Operating services of water supply pumping installation near Chabal village at P-3 pump house for 24 hrs having installed equipment/machinery as follows:- (a) Centrifugal multi stage pump set directly coupled with 220HP 3 phase electric motors- 3Nos. (b) 300 KVA voltage stablizer = 01 No. (c) Main LT panels = 01 No. (d) Motor control Auto tranformer starter panels = 03 Nos. (e) water storage reservoir capacity 30000 Glns = 01 No. (f ) Sluice valve/Gate valve/Non return valve = 15 Nos. (with deployment of operating staff one tradesman (FGM) in each shift for three shifts per day (each shift of 08 hours). The shift timing for the month during contract period shall be as directed by Engr-in- charge. The Contractor will also be responsible for routine/preventive maintenance of eqipments and accessories , cleaning of surrounding area of the installation and the building inclusive of minor repair for leakage like providing gland packing, replacement of flange gasket and maintenace of control panel of DG set / pumping set/LT panel and tightening of loose connections in panels etc. and routinge/periodic maintenance as under :- Note : The following routine/preventive measures of above equipment /plant deemed to be included in the unit rates qouted against this item :- (A) pumping Set (i) Bearing lubrication using grease gun. (ii) Repair to leakage on pump set suction/delivery valve. (iii) Replacement of gland packing (iv) checking of coupling, bolts, nuts etc. (v) Ensuring proper voltage, amp and function of APFC panel. (vi) Checking of Electric LT panel/ATS Panel and tightening of electric connections etc. (vii) Maintenance of daily log sheet . (B) water Reservoir (i) Checking water level indicators. (ii ) Cleaning /repair of control valve and valve pit.
Maintenance and operating services of Military Hospital area Elect substation round the clock for 24 Hours including Sunday and Holiday having installed equipmt/mechinery as follows :- (a) DG set 125 KVA-01 No (b) LT Electric Panel Board -01 No (c) Change over switch -01 No (d) Transformer 200 KVA -01 No (e) LT two pole structure -01 No, (f) APFC panel-01 No (with depolyment of operating staff (FGM-01 No) in each sfift for three shifts per day (each shift of 08 hours). The shift timing for the month during contract period and time schedule for functioning shall be all as specified and as dircetd by Engineer-in-charge omprising the following works :- (i) Running of DG set for standby supply (ii) Ensure un-intrupted electric power supply under the sub stn/DG set justdiction (iii) Daily cleaning of substation area and machineries installed (iv) Maintance of DG set by replacemnt of Engine oil, Cleaning of air cleaner element etc. Note : - (i) Fuel and lubricant will be issued by the department (ii) The FGM will be well conversant with preventive measures in case of electrical accident and fire accident and fire fighting system.
Maintenance and operating services for various valves (any size / type) located at Kasauli Station for proper supply/collection / storage of water in distribution tanks in entire water distribution network at Kasauli station (i.e High level Area Kasauli, Kasuli Club & MES Club ) including valve operation for proper distribution of water to various entitled/non-entitled users in one shifts daily per month including minor repairs of sluice valves / gate valves i.e tightening of nuts / bolts and replacement of glands packing etc to arrest the leakage complete all as directed by Engr-in-Charge. (with deployment of operating staff one tradesman (Valve Man) in each shift for one shifts per day (each shift of 08 hours). The shift timing for the month during contract period shall be as directed by Engr-in- charge. The Contractor will adhere time schedule for function shall as directed by Engr-in-Charge. The contractor also ensure proper minor repair to valves/pipe line to avoid wastage of water as under :- Note : The following routine / preventive maintenance of above equipment / plant deemed to be included in the unit rates qouted against this item :- (i) Ensure proper chlorination of water (ii) Proper distribution of water to all consumers (iii) Recording of tests results (iv) Repair / cleaning of valve pits (v) Patrolling on distribution pipe line as directed by Engr in charge. (vi) Maintaining water distribution register
(a) High Level Kasauli
(b) Kasauli Club
(c) MES Club Kasauli
Maintenance and operating services for various rising main/distribution Lines (any size / type) located Kasauli station (i.e High level Area, Kasauli) including survey of lines and repair to leakages, maintance of pipe systems fittings and fixtures used for maintance and T&P will be provided by department complete all as directed by Engr-in-Charge. (with deployment of operating staff one tradesman (P/fitter & Helper ) in each shift for one shifts per day (each shift of 08 hours). The shift timing for the month during contract period shall be as directed by Engr-in- charge. The Contractor will adhere time schedule for function shall as directed by Engr-in-Charge. Note : The following routine / preventive maintenance of above equipment / plant deemed to be included in the unit rates qouted against this item :- (i) Ensure proper servicibility of pipe lines (ii) Repair/cleaning of distribution lines (iii) Petrolling of distribution pipe lines as directed by Engineer-in-Charge. (iv) Periodically checking of water pressure at the last of user end
(a) RCC to South Spring to High level Area Kasauli
(i) Pipe Fitter -01 No
(ii) Helper - 01 No
(a) P2 to P3 Area
(i) Pipe Fitter -01 No
(ii) Helper - 01 No
(Note for item 1 to 5) :- (a) The Contractor will provide suitable reliver (Tradesman) during weekly rest of employed electricans without any extra cost to department). (b) Contractor will provide all the tools plants transportation as required for maintanance and operation to without any extra cost to department. (c) The rates for cleaning of sub station area inside and outside shall be deemed to be included in the unit rate. (d) The Contractor or his represetative would maintain the daily complaint register/complaint slip/log book and other required documents. (e) Trademan should inform to JE concerned about any major breakdown and non availability of water for pumping
KATWAL TECHNOCRATS
M/S Trilok chand sharma
Vasudeva Trading Co.
Pankaj Traders
M/s Super Trading Corporation
G M CONSTRUCTION COMPANY
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .