Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52.5 LAdmitted-Finance | -9.99% | ₹52.5 L | L1 | Admitted-Finance |
| 2 | L2₹54.1 L+₹1.6 L (2.96%)Admitted-Finance | -7.33% | ₹54.1 L+₹1.6 L (2.96%) | L2 | Admitted-Finance |
Tender Value
₹58.3 L
EMD Value
₹1.2 L
Closing Date
24 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
WDSC DUDU
Construction of 30 Farm pond (Without HDPE Sheet) Total 30 Farm Pond in Arable Land MJSA-2.0 II Phase PS-Dudu Jaipur
2026_WDSC_589265_1
NIT 08/2026-27
Open Tender
Civil Works
Percentage
120 days
DUDU
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
28604-SE, WCDC JAIPUR/MD RISL JAIPUR
₹1.2 L
Yes
26 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Mkx csfyax djuk 5-0 lseh- ls 7-5 lseh- xgjkbZ rd | 3,060 | Mtr | 1.71 | ₹5,232.6 |
| 2 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) | 12,089.25 | Cum | 59.44 | ₹7,18,585.02 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard soil mixed with Kankar / boulders, Morrum H/6*{(A1 A2+4*((A1+B1)/2*(A2+B2)/2)+B1 B2)} = Earth work calculation calculated by this formula | 28,208.25 | Cum | 118 | ₹33,28,573.5 |
| 4 | Supplying and fixing of chain link fencing with angle iron posts 50x50x6mm placed at every 3 Mtr. apart 30cm in ground embedded in cement concrete 1:3:6 (30x30x45cm) corner and every tenth post to be strutted with (50 x 50 x 6cm) angle iron provided and fixed and fitted with posts including earth work in excavation etc. complete with chain link size. 100mm x 100mm x 3.15mm | 3,360 | RM | 521 | ₹17,50,560 |
| 5 | Display board and Photograph | 30 | No. | 1,000 | ₹30,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
biddo1.pdf
Tender Documents • 1.40 MB
BOQ_1046411.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .