| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.3 LAdmitted-Finance | ₹49.3 L | L1 | Admitted-Finance |
| 2 | L2₹49.4 LAdmitted-Finance | ₹49.4 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sri Annamalayar Constructions L1 | SAKTHI CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.001. Strengthening of the road from Jandamedu - Puliur to Chendrayasamy Koil (Via) Mookampatty Road KM KM 1/750-2/550 .(R-184) Estimate Amount : 49,96,000/- - | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. | 1,440 | Sqm | 6.35 ₹9,144 | 6.37 ₹9,172.80 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,000 | Cum | 23.34 ₹23,340 | 23.41 ₹23,410 |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 576 | Cum | 140.22 ₹80,766.72 | 140.63 ₹81,002.88 |
| 5.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 240 | Cum | 340.79 ₹81,789.60 | 341.78 ₹82,027.20 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 375 | Cum | 3,013.73 ₹11.3 L | 3,022.47 ₹11.3 L |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,000 | Sqm | 88.88 ₹2.7 L | 89.14 ₹2.7 L |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | 3,000 | Sqm | 20.91 ₹62,730 | 20.97 ₹62,910 |
| 9.00 | Providing and laying Bituminous Macadam based on job mix formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen 60/70 penetration grade as per IS 73 and aggregates conforming to grading | 150 | Sqm | 9,597.49 ₹14.4 L | 9,625.35 ₹14.4 L |
| 10.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 75 | Sqm | 12,168.55 ₹9.1 L | 12,203.87 ₹9.2 L |
Tender Value
₹50.0 L
EMD Value
₹50,000
Closing Date
5 Feb 2026, 3:00 pmClosed
Block Development Officer (VP)
BDO Office Mathur
Krishnagiri Dt Mathur Block Salamarathupatti Panchayat General Fund 2025-26 1 work of Strengthening of the road from Jandamedu - Puliur to Chendrayasamy Koil (Via) Mookampatty Road KM 1/750-2/550 Package No 2025-26 MTR 29
2026_RDTN_648166_1
RocNo1983_2025_A5dt_09_01_2026
Open Tender
Civil Works - Others
180 days
BDO Office Mathur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹50,000
Yes
BDO Office Mathur
6 Mar 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
29 Jan 2026
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
TB29.pdf
Tender Documents • 0.66 MB
BOQ_777073.xls
BOQ • 0.28 MB
PB29.pdf
Tender Documents • 0.60 MB