Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAccepted-AOC K 4 FIVE STAR INDUSTRIAL AREA MIDC BUTIBORI NAGPUR 441 122 | NAGPUR | NAGPUR | MAHARASHTRA | 441122 | ₹5.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.5 Cr+₹1.5 Cr (29.6%)Rejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹6.5 Cr+₹1.5 Cr (29.6%) | L2 | Rejected-AOC L2 |
| 3 | L3₹13.5 Cr+₹8.5 Cr (170.6%)Rejected-Finance 2ND ROSHAN TOWER S B SHOP BISTUPUR AREA EAST SINGHBHUM JHARKHAND | BISTUPUR | EAST SINGHBHUM | JHARKHAND | 831001 | ₹13.5 Cr+₹8.5 Cr (170.6%) | L3 | Rejected-Finance L3 |
Tender Value
₹5.6 Cr
EMD Value
₹5.6 L
Closing Date
20 Apr 2021, 3:00 pmClosed
SE PNW SGTPS MPPGCL BIRSINGHPUR
SE PNW SGTPS MPPGCL BIRSINGHPUR
COH/AOH of TG-Set of unit No. 1, 2, 3 and 4 SGTPS, MPPGCL, Birsinghpur
2021_MPPGC_132157_1
132157
Limited
Electrical and Maintenance Works
Fixed-rate
45 days
SGTPS MPPGCL BIRSINGHPUR
Not applicable
14 documents required · 14 mandatory
₹0
₹5.6 L
Yes
17 Mar 2022
9 Mar 2021
23 Apr 2021
9 Mar 2021
20 Apr 2021
9 Mar 2021
PART-A
BEARING INSPECTION WORK OF TG , Casing Roll Check, Bump Check, Centering, Horn Drop Test, Rotors CRO checks, Alignment, Coupling, OH of MOP & Barring Gear including EOT Crane operator
HP TURBINE OVERHAUL
IP TURBINE OVERHAUL
LP TURBINE OVERHAUL
Inspection and Revisioning of IPT & LPT gland Box (Front & Rear)
OVERHAULING OF HYDRAULICALLY OPERATED VALVES (complete package including F1 to F8)
ESV & HP CONTROL VALVES AND ITS SERVOMOTORS
IV & IP CONTROL VALVES AND ITS SERVOMOTORS
LPBP STOP & CONTROL VALVES AND ITS SERVOMOTORS
LPBP WATER INJECTION VALVES AND ITS SERVOMOTORS
CRH NRV AND ITS SERVOMOTORS
HPBP STEAM CONTROL VALVES & HPBP SPRAY CONTROL VALVES
GS & LEAK STEAM CVs
OVERHAULING oF EXTRACTION NRV
Overhauling of MS strainer / HRH Strainer (04 nos)
COH of generator and Exciter (with rotor thread out)
General AOH of generator & EXCITER ALONG WITH SEAL BODY INSPECTION
Part-B- On site Refining and machining work of HPT module (Inner casing & Rotor inter stage sealing fins, rotor balance drum & gland seals, shaft seal segments) during AOH/ COH of TG Set of Unit No. 1,2,3 &4 (PH-I & II) at SGTPS , MPPGCL, Birsinghpur
Refining and machining work of HPT Rotor interstage sealing fins, rotor balance drum & gland seals, shaft seal segments, (FOR unit 1,3 and 4)
Refining and machining work of HPT module Inner casing (FOR unit 1,2, 3 and 4)
Slow speed balancing of HP Rotor (FOR unit 1,3 and 4)
GE POWER INDIA LIMITED
Siemens Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .