| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹43.0 LAccepted-AOC VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹45.0 L+₹2.1 L (4.83%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical GRAM POST DISTRICT UTTAR PRADESH UP | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S ADITYA CONSTRUCTION COMPANY L1 | M/S VINOD SHANKAR PANDAY L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling cement concrete or brick or granolithic floor including base concrete and including stacking of dismantled materials as directed by the engineer-in-charge within a distance of 60 M. | 508.84 | sqm | 15 ₹7,632.6 Lowest | 110 ₹55,972.4 |
| 2.00 | Earth work in excavation of foundation in ordinnary soil /sandy soil loam clay is lift up to 1.5m and lead up to 30m and filling ramming excavated earth into trenches etc required for completion of work. | 240.49 | cum | 80 ₹19,239.2 Lowest | 200 ₹48,098 |
| 3.00 | Earth work in filling including all cost of labour, manual compaction and T&P, lead, lift etc. and its carriage beyond 1.0 Km. and up to 2.0 Km. required for completion of work. | 113.86 | cum | 60 ₹6,831.6 Lowest | 220 ₹25,049.2 |
| 4.00 | Laying C.C(1:3:6) in foundation with cement coarse sand and crushed hard stone grit including cost of all material labour T&P etc. required for Completion of work. | 61.48 | cum | 4,000 ₹2,45,920 Lowest | 5,000 ₹3,07,400 |
| 5.00 | Cement concrete 1:1.5:3 (1 cement,1.5 sand,3stone ballast) with 2 cm gauge stone ballaste in R.C.C. work including all cost of material,labour nad T&P but excluding centring, shuttring and reinforcement for mechanical mixing. | 23.41 | cum | 7,000 ₹1,63,870 Lowest | 7,500 ₹1,75,575 |
| 6.00 | Reinforcement in R.C.C. work with cutting, bending and binding,placing with 24 SWG wire including cost of all material and T&P required for proper completion of work. | 3.68 | MT | 65,000 ₹2,39,200 Lowest | 72,000 ₹2,64,960 |
| 7.00 | Centring and shuttering of C.C. work including rent of shuttring,material,labour and T&P required for proper completion of work for etc. | 327.98 | Sqm | 400 ₹1,31,192 | 200 ₹65,596 Lowest |
| 8.00 | Febrication of mild Steel /iron size(35x35x5mm)Work in frame including cutting, drilling ,welding ,revetting &hinges , where necessary and fixing position including cost of all material , labour T&P etc. Required for proper complition of work with one coat of red oxide primer | 52.8 | Kg | 90 ₹4,752 Lowest | 110 ₹5,808 |
| 9.00 | Class-150 brick work in 1:3 cement and sand mortar in Boundry wall including supply of all materials, labour and tools and plants etc. Required for proper completion of the work | 119.33 | cum | 5,500 ₹6,56,315 Lowest | 7,000 ₹8,35,310 |
| 10.00 | 12 mm Thick Cement Plaster CM 1:4 on brick masonry / sqm. including all material,Labour,T&P etc proper completion of work. | 449.2 | sqm | 150 ₹67,380 | 130 ₹58,396 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
6 Aug 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E. B.S.C.C.C.-2, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Construction of Rainwater harvesting In Bansagar Sakhaura Colony, Mirzapur
2026_UPIDC_1163817_4
01/SE/2026-27
Open Tender
Civil Works
Item Rate
180 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹1.0 L
17 Sept 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling cement concrete or brick or granolithic floor including base concrete and including stacking of dismantled materials as directed by the engineer-in-charge within a distance of 60 M. | 508.84 | sqm | - | - |
| 2 | Earth work in excavation of foundation in ordinnary soil /sandy soil loam clay is lift up to 1.5m and lead up to 30m and filling ramming excavated earth into trenches etc required for completion of work. | 240.49 | cum | - | - |
| 3 | Earth work in filling including all cost of labour, manual compaction and T&P, lead, lift etc. and its carriage beyond 1.0 Km. and up to 2.0 Km. required for completion of work. | 113.86 | cum | - | - |
| 4 | Laying C.C(1:3:6) in foundation with cement coarse sand and crushed hard stone grit including cost of all material labour T&P etc. required for Completion of work. | 61.48 | cum | - | - |
| 5 | Cement concrete 1:1.5:3 (1 cement,1.5 sand,3stone ballast) with 2 cm gauge stone ballaste in R.C.C. work including all cost of material,labour nad T&P but excluding centring, shuttring and reinforcement for mechanical mixing. | 23.41 | cum | - | - |
| 6 | Reinforcement in R.C.C. work with cutting, bending and binding,placing with 24 SWG wire including cost of all material and T&P required for proper completion of work. | 3.68 | MT | - | - |
| 7 | Centring and shuttering of C.C. work including rent of shuttring,material,labour and T&P required for proper completion of work for etc. | 327.98 | Sqm | - | - |
| 8 | Febrication of mild Steel /iron size(35x35x5mm)Work in frame including cutting, drilling ,welding ,revetting &hinges , where necessary and fixing position including cost of all material , labour T&P etc. Required for proper complition of work with one coat of red oxide primer | 52.8 | Kg | - | - |
| 9 | Class-150 brick work in 1:3 cement and sand mortar in Boundry wall including supply of all materials, labour and tools and plants etc. Required for proper completion of the work | 119.33 | cum | - | - |
| 10 | 12 mm Thick Cement Plaster CM 1:4 on brick masonry / sqm. including all material,Labour,T&P etc proper completion of work. | 449.2 | sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_2203509.xls
BOQ • 5.35 MB
Tender_Document_01_SE_2026-27_Lot-2.pdf
Tender Documents • 4.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .