Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹11.6 L+₹3.1 L (36.7%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | L3₹15.9 L+₹7.3 L (86.3%)Accepted-Finance 357 KOTKAPURA ROAD STREET NO 8 MUKTSAR PUNJAB 152026 | SRI MUKTSAR SAHIB | PUNJAB | 152026 | L3 | Accepted-Finance FOUND OK | |
| 4 | L4₹22.2 L+₹13.7 L (160.7%)Accepted-Finance F 16 GANESH SHANKAR VIDYARTHI NAGAR PANKI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | L4 | Accepted-Finance FOUND OK |
Tender Value
₹10.7 L
EMD Value
₹10,700
Closing Date
28 Aug 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S E EDC BARABANKI
33/11 KV SUBSTATION BADHEL,BARABANKI PIN-225001
For Selection of Working Agency for execution of deposit work in Sub Division Tikatnagar under EE,EDD RS Ghat UNDER EDC BARABANKI, MVVNL, BARABANKI
2020_MVVNL_503602_1
61/2020-21/EDCBARABANKI
Open Tender
Electrical Works
Fixed-rate
30 days
EDD RAM SNEHI GHAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
S E EDC BARABANKI
₹10,700
Yes
5 Sept 2020
20 Aug 2020
29 Aug 2020
20 Aug 2020
28 Aug 2020
20 Aug 2020
150 days
Amount
Safe loading carriage including unloading and proper stacking of following materials from Electrical Store Center Barabanki to dump site and vice virsa (in case of receipt back from site), in the area where work is to be executed.
PCC Pole 8.5 Mtr Long. (Vide P-28 of RESSPO Cost Schedule 2018-19)
S.T. Pole 11 Mtr Long.
ACSR Weasal Conductor.
T/F 10/16 KVA. (Vide P-30 of RESSPO Cost Schedule 2018-19)
T/F 25 KVA. (Vide P-2 of RESSPO Cost Schedule 2018-19)
T/F 63 KVA. (Vide P-2 of RESSPO Cost Schedule 2018-19)
T/F 100 KVA. (Vide P-2 of RESSPO Cost Schedule 2018-19)
T/F 250 KVA. (Vide P-9 of RESSPO Cost Schedule 2018-19)
T/F 400 KVA. (Vide P-9 of RESSPO Cost Schedule 2018-19)
Outdoor 33 or 11 KV CT/PT compact unit.
Loose line and other miscellaneous Line materials.
AB cable Single Phase.
AB cable Three Phase.
11 KV XLPE cable 3X70 mm2/3X120 mm2/ 3X185 mm2
Indoor 33 KV and 11 KV Pilfer resistant metering cubical.
Dragging of PCC Pole from Dump Site to pit site.
Dragging of ST Pole 11 mtr. Long from Dump Site to pit site.
Fabrication and Erection of 11 KV Single Pole Support on PCC Pole complete in all respect as per Respo norms. (Vide P-28 of RESSPO Cost Schedule 2018-19)
Fabrication and Erection of LT Single Pole Support on PCC Pole complete in all respect as per RESPO NORMS.
Fabrication and Erection of 11 KV Double Pole Support on PCC Poles complete in all respect as per RESPO NORMS.
Fabrication and Erection of Single Pole STP 11 Mtr Support complete in all respect as per RESPO NORMS.
Fabrication and Erection of 11 KV Double Pole Support on ST Poles complete in all respect as per Respo norms.
Grouting of PCC/STP using cement with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories as per RESPO Norms, complete in all respect. (Vide P-28 of RESSPO Cost Schedule 2018-19)
Stringing and binding and jumpering of ACSR Conductors for H.T. Lines complete in all respect.
Sagging of Single Phase AB Cable for L.T. Lines. as per norm.
Sagging of Three Phase AB Cable for L.T. Lines. as per norm.
Earthing of H.T Poles and single phase T/Fs with M.S. Earthing Rod of size 20x2500 mm and 6 SWG Earthing wire etc. as per Specification. (Vide P-28 of RESSPO Cost Schedule 2018-19).
Fabrication & erection of wire mesh rectangle type fencing of size 5 mtr X 3 mtr having height of 2.0 mtr around the Transformer with Locking arrangement made of MS angle iron of 50X50X6 mm jointed with nuts and bolts. The flat of size 50x6 mm and wire mesh of size 10 SWG will be used. MS angle pillers will br grouted in size 350X350X1200 mm in the ratio of 1:4:6. Required painting wil be done as per norms. All the materials will be provided by the contractor at his own cost.
Boring type 20 feet deep piped earthing for 25/63 KVA T/F using 2” dia GI pipe of standard make. 4”X4” copper plate will be laid on the base with charcoal (of Imli) and salt etc, required GI strip of size 30X5 mm will be used for connecting pipe and T/F neutral. All the material will be provided by the contractor. Earthing work will be done as per standard, complete in all respect.
Boring type 70 feet deep piped earthing for 10/250/400 KVA T/Fs using 2” dia GI pipe of standard make. 8”X8” copper plate will be laid on the base with charcoal (of Imli) and salt etc, required GI strip of size 50X6 mm will be used for connecting pipe and T/F neutral. All the material will be provided by the contractor. Earthing work will be done as per standard, complete in all respect.
Installation and Mounting of 11/0.4 KV 10/16 KVA Transformers. Besides jumprig etc. complete in all respect. (Vide P-30 of RESSPO Cost Schedule 2018-19)
Installation and Mounting of 11/0.4 KV 25 KVA Transformers with the help of HYDRA crane on T/F Base channel including its connection in between 11 KV , providing Crimping type Aluminum lugs of required sizes (All the Material except transformer will be provided by the Contractor) (Vide P-2 of RESSPO Cost Schedule 2018-19)
Installation and Mounting of 11/0.4 KV 63 KVA Transformers with the help of HYDRA crane on T/F Base channel including its connection in between 11 KV , providing Crimping type Aluminum lugs of required sizes (All the Material except transformer will be provided by the Contractor) (Vide P-2 of RESSPO Cost Schedule 2018-19)
Installation and Mounting of 11/0.4 KV 100 KVA Transformers with the help of HYDRA crane on T/F Base channel including its connection in between 11 KV , providing Crimping type Aluminum lugs of required size. All the Material except transformer will be provided by the Contractor. (Vide P-2 of RESSPO Cost Schedule 2018-19)
Installation and Mounting of 11/0.4 KV 250 KVA Transformers with the help of HYDRA crane on T/F Base channel including its connection in between 11 KV , providing Crimping type Aluminum lugs of required sizes. All the Material except transformer will be provided by the Contractor. (Vide P-9 of RESSPO Cost Schedule 2018-19)
Installation and Mounting of 11/0.4 KV 400 KVA Transformers with the help of HYDRA crane on T/F Base channel including its connection in between 11 KV , providing Crimping type Aluminum lugs of required sizes. All the Material except transformer will be provided by the Contractor. (Vide P-9 of RESSPO Cost Schedule 2018-19)
33 KV or 11 KV Cabling work from DP Top to meter Room, ensuring that the whole cable remains visible from out side including jointing box work at both ends, complete in all RESPECTS.
Installation and connection of 33 or 11 KV outdoor CT/PT compact unit on D/P situated outside meter room complete in all RESPECTS.
Guarding of 11 KV or 33 KV road X-ing as per standard respo norm complete in all respect.
For New Connections :- Installation and commissioning of indoor 33 KV and 11 KV Pilfer resistant metering cubical including masonary work of plinth, cable trench, proper laying of H.T cable, sealing of entry and exit points of cable in the meter room, fixing of cable jointing boxes at both ends complete in all respect. All the materials except store items will be provided by the contractor.
For exiting connections :-Installation and Commissioning of indoor 33 and 11 KV pilfer resistant metering cubical on the old plinths of exitinig H.T connections, including fixing of cable jointing boxes etc. At both ends, Complete in all respect.
Underground cabling work of 33 or 11 KV line by drilling method as per standard including road restroration charges if any. Complete in all respect
Providing 6" Dia GI pipe as per reqirment and fixing it at D/P pole base in Order to Raise 11 or 33 KV cable for lifting it up to D/P top. complete in all RESPECTS.
Erection of Stay set as per requirement by digging of pit of size 0.4x0.6x1.6 m. Grouting of stay set in the Ratio of 1:3:6 cement concrete, providing loop insolator, anchor plate as per norm. All the material except store item will be provided by the contractor. (Vide P-30 of RESSPO Cost Schedule 2018-19)
Dismantling of old H.T/ L.T Pole with accessories etc.
Dismantling of old H.T/ L.T line excluding poles and pole accessories.
Constructions of Masonary type T/F Plinth of size 2X2X1.5 M with cement coarse sand, sand and brick ballast, filling of sand in the hollow space plastering outer surface in ratio 1:4:6 top of the plinth 4” thickness grouting of 2 No. MS Channel of size 100x50x2000 mm on the top of the plinth for placement of T/F. All the material will be provided by the contractor. (Vide P-11 of RESSPO Cost Schedule 2018-19)
M/S SHAYAMJI GRAMIN SEVA SANSTHAN
M/S ASHOK KUMAR CONTRACTOR
POOJA ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .