Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-Finance | ₹1.1 Cr | 1 | Accepted-Finance L1 |
| 2 | 2₹1.1 Cr+₹1.2 L (1.11%)Rejected-Finance | ₹1.1 Cr+₹1.2 L (1.11%) | 2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
5 Apr 2022, 3:00 pmClosed
PD and VC
IWAI NOIDA
Procurement of ADMEASUREMENT CONTRACTS for CHANNEL STABILIZATION WORKS THROUGH ECO-FRIENDLY TECHNIQUES FOR DEVELOPMENT OF NAVIGATION CHANNEL AT 07 DIFFERENT LOCATIONS - SCH-5
2022_JMVP_676177_5
IN-IWAI-279739-CW-RFB
Open Tender
Civil Works
Item Rate
75 days
IWAI NOIDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
IWAI FUND
₹2.1 L
IWAI NOIDA
12 Apr 2023
1 Mar 2022
5 Apr 2022
1 Mar 2022
5 Apr 2022
16 Mar 2022
10 Mar 2022
Amount
Schedule – V (Channel Stabilizing Works at Arjunpur Ch 1120 KM)
Construction of Bamboo Submerged Vane of 12.0m length, with high quality bamboos (preferably Bhaluka/ Harauti) of average 6.0m length and 18-23 cm circumference at 45 Centimeter above from bottom consisting of average 150 bamboos in each vane installed atleast 3m inside the riverbed by water jetting close to each other and some minimal gaps is acceptable or in other words the vanes need not be impervious. The angle of vane with dominant flow as prescribed in the design should be between 180 - 200 complete as per drawing and instructions of Engineer-In- Charge. The leading 3m long portion of the vane should be tapered at 450 angle after complete installation of a vane using appropriately a saw or any other convenient tool. The contract comprises of supply, erection and supervision of bamboo submerged vanes and other allied works with all material, cartage, labour, boats, machinery, tools, taxes, levies, duties, etc. as specified in the contract.
Erection and fixing of balli screen of 6m length with a gap of 10m towards the flow and 5m across the flow of river and should be driven atleast 3m driven in staggered layout alignment with respect to flow direction as per the drawing and directions of EIC. The contract comprises of supply, erection and supervision of balli screen with all material, cartage, labour, boats, machinery, temporary and permanent works, taxes, levies, duties, etc. as specified in the contract. (No. of ballis)
Plantation of Vetiver Grass (Sapling) units as per design, drawing and directions of Engineer-in-Charge of the work as complete as per the requirement
GST @18% for all above item in Rs.
M/S Rama Shankar Prasad
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .