Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹1.7 L+₹1,360 (0.81%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹1.7 L+₹1,960 (1.17%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
28 Jul 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
EE 400KV S/s Division Sultanpur
Replacement of Various Equipments to Attend the Emergency Breakdown for One Year including Replacement of Old and Low Accuracy Level Equipments at 400 KV and 220 KV S/S , Sultanpur under Electy. 400 KV Substation Division, Sultanpur
2025_UPTCL_1049732_2
T.No. 02/ESDS/2025-26
Open Tender
Electrical Works
Item Rate
365 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE 400KV S/s Division Sultanpur
₹2,000
30 Jul 2025
21 Jul 2025
28 Jul 2025
21 Jul 2025
28 Jul 2025
21 Jul 2025
Amount
Replacement of various 220 KV,132 KV and 33 KV equipment at 220 KV Sub-Station Sultanpur under Electy. 400 KV Substation Division, Sultanpur along with other associated works during the period of 1 year from the date of LOI or agreement whichever is earlier, with all due care of safety & precautions, with all cost of men, misc. consumables, T&Ps etc. required for satisfactory completion of the work as per technical specification & direction of the concerned JE/SDO as detailed under :-
Replacement of 33 KV VCB with all cost of required T&P, skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost as detailed under :-
Replacement of defective/damaged 33 KV VCB by Dismantling of 33 KV damaged/defective VCB including shifting of dismantled VCB form switchyard to storage place / store room.
Modification of 33 KV VCB foundation as per site requirement/ as per manufacturing drawing or as per direction of supervising Engineer and shifting of earthing & both side jumpers.
Erection of new 33 KV VCB in proper alignment and cable termination of circuit breaker as per logic for tripping/ closing, spring charging/ indication/ supervision circuit with proper reruling and checking out of breaker operation from local / remote including earthing & connection of both side jumpers and works related to complete the erection work.
Replacement of 220 KV CT/CVT/PT with all cost of required T&P, skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost as detailed under :-
Dismantling of 220 KV CT/CVT/PT after opening of its both side jumpers, earthing & cable termination etc. including shifting of dismantled material from site to store.
Erection of new 220 KV CT/CVT/PT including shifting of new 220 KV CT/CVT/PT from store to site. The work also includes jumpering from both sides, earthing and cable termination.
Replacement of 132 KV CT/CVT/PT with all cost of required T&P, skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost as detailed under :-
Dismantling of 132 KV CT/CVT/PT after opening of its both side jumpers, earthing & cable termination etc. including shifting of dismantled material from site to store.
Erection of new 132 KV CT/CVT/PT including shifting of new 132 KV CT/CVT/PT from store to site. The work also includes jumpering from both sides, earthing and cable termination.
Replacement of 245 KV/145 KV LA with all cost of required T&P, skilled labours, crane/hydra etc. shall be arranged by the contractor at his own cost as detailed under :-
Dismantling of 245 KV/145 KV LA after opening of its jumpers, earthing including shifting of dismantled material from site to store.
Erection of new 245 KV/145 KV LA including shifting of new LA from store to site. The work also includes jumpering from side, earthing and cable termination.
DEEPAK ENGINEERING (BID ID -5383805)
HARE KRISHNA ENERGY PROJECTS (BID ID -5383634)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .