Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.8 L+₹7,289.16 (1.53%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.5 L+₹79,090.74 (16.6%)Admitted-Finance B 111 101 1ST FLOOR A A VENTURES GALI NO 3 DAYALPUR EAST DELHI DELHI 110094 UDYAM DL 01 0034036 | NORTH EAST DELHI | DELHI | 110094 | L3 | Admitted-Finance | ||
| 4 | L4₹5.6 L+₹79,771.97 (16.8%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹6.8 L
EMD Value
₹13,620
Closing Date
28 Sept 2026, 4:00 pmClosed
Executive Engineer Rnb Division Dalgate Srinagr
Executive Engineer Rnb Division Dalgate Srinagr
Construction of an R-wall from Masjid Al Hadees to Son Mohalla at Zoo Vethpora.
2026_PWDJK_325740_4
Nit-56/e-tend/2026-27/7956-63 dtd.22-09-2026
Open Tender
Civil Works
Percentage
45 days
Vethpora.
as per nit
2 documents required · 2 mandatory
₹300
Executive Engineer Rnb Division Dalgate Srinagr
₹13,620
5 Oct 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
28 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 36.49 | Cum | 217.67 | ₹7,942.78 |
| 2 | Providing supplying and stacking of soling including laying ramming complete as per EIC. | 7.2 | Cum | 805.08 | ₹5,796.58 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.6 | Cum | 4,409.24 | ₹15,873.26 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 61.87 | Cum | 6,410.85 | ₹3,96,639.29 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 191.7 | Sqm | 533.01 | ₹1,02,178.02 |
| 6 | Providing fixing and placing in position as per requirement of the site UPVC SWR pipes (Type B) for weeping holes in retaining / breast wall 110mm dia. | 15 | RM | 296.61 | ₹4,449.15 |
| 7 | Supply and filling of RBM / Nallah Muck in back filling behind R /walls including all costs and carriages, complete job as directed by EIC. | 29.15 | Cum | 805.08 | ₹23,468.08 |
| 8 | Carriage of materials from source to site of work by mechanical means. | - | - | - | - |
| 9 | a) Aggregate for an avg. lead of 10 Kms. | 3.24 | Cum | 257.07 | ₹832.91 |
| 10 | b) Aggregate below for an avg. lead of 10 Kms. | 55.68 | Cum | 236.47 | ₹13,166.65 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1101230.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .