| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹36,445.13 (7.91%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹5.7 L
EMD Value
₹57,000
Closing Date
18 Feb 2026, 2:00 pmClosed
Executive Engineer Minor Irrigation Div- prayagraj
Executive Engineer Minor Irrigation Div- prayagraj
Construction Of Anicut Badokhar,block Koraon, District- Prayagraj.
2026_UPMID_1114544_1
2099/MI/AC/NividaSuchna/25-26 dt. 04.02.2026
Open Tender
Civil Works
Percentage
30 days
Construction Of Anicut Badokhar, block Koraon
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
Executive Engineer Minor irrigation division
₹57,000
Yes
20 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
Dewatering work by 5 HP Diesel pump set with operator & P.O.L.
(i lift) Making Diversion drain With o/soil up to 1.50 m. lift & 30m.lead i/all complet.
(ii lift) Making Diversion drain With o/soil up to 1.50 m. to 1.80 m. lift & 30m. lead i/all complet.
(i lift) Earth work excavation in ordinary soil / kanker mixed hard soil I/c Up to 1.50 m. lift and 30 m. lead
(ii lift) Earth work excavation in ordinary soil kanker mixed hard soil I/c Up to 1.50 m. to 1.80 m lift and 30 m. lead
Removal of slush from nala bed before excavation s.soil Up to 2.40 m. to 2.70 m lift and 30 m. lead
Earth work excavation in foundation in mar kabar ordinary & kanker mixed saturated soil crest, wing wall etc. Beyond 1.50 lift and 30 m. lead
P.C.C. Work with 1:3:6 (cement,c/sand & 20-40 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work.
R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in foundation.
R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure.
P.C.C. Work with 1:2:4 (cement,c/sand & 10-20 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work.
Plaster work 1:3 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work.
Raised pointing work 1:2 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work.
Laying of dry stone boulder filling in inverted filter including cost of material, labour etc.
(i) Removal of cofferdam up to 1.50 m. lift.
(ii) Removal of cofferdam Beyond 1.50 m. to 3.00 m lift.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
BOQ_2066919.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .