| 1 | L1₹2.0 CrAccepted-AOC 2 1 MIN NAGAR KOTTUR ROAD SULEESWARANPATTI POLLACHI 624006 | 624006 | ₹2.0 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.1 Cr+₹8.3 L (4.19%)Rejected-Finance 44 82 LIG COLONY 1 MAHALINGAPURAM POLLACHI | COIMBATORE | TAMIL NADU | 638459 | ₹2.1 Cr+₹8.3 L (4.19%) | L2 | Rejected-Finance Rejected |
Tender Value
₹2.0 Cr
EMD Value
₹2 L
Closing Date
3 May 2023, 3:00 pmClosed
Additional Collector DRDA Coimbatore
DRDA Coimbatore
Strengtheningl of 2 roads in Sultanpet Block, Coimbatore district under MGSMT 22-23
2023_RDTN_306285_1
DIPR/2018/Tender/2023 Dated 05.04.2023
Open Tender
Civil Works - Roads
Item Rate
210 days
Coimbatore
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2 L
Yes
DRDA Coimbatore
7 Jun 2023
25 Apr 2023
3 May 2023
26 Apr 2023
3 May 2023
26 Apr 2023
26 Apr 2023
Amount
1.Strengthening to the road from Chinnavadhambacheri to Vadavedampatti Kamalapatti road in Vadhambacheri Panchayat R81 (KM 0/0 - 2/3)
Clearing the scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete.
Picking 5cm to 10cm old metalled and BT surface and sectioning, hand packing metal to camber as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-1/045
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.7 kg/sqm using mechanical means as per Technical Specification Clause 502
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminousbase to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. Km 0/0 - 1/0
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms KM 0/0-1/0
Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes.
Provision for Kilometre stones
Provision for Hecta Metre stones
Provision for Supplying and erection of Scheme Name board Cum Citizen Board
Supplying and fixing of Cautionary Sign board including painting and lettering as directed by the departmental officers etc., complete
Providing and erecting of Retro - reflectorized cautionary , Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type - IV standards of IRC - 67: 2012 and ASTM D -09, Specification and fixed over 2mm thick Aluminium sheet fixed over a black supporting frame of 25MMx25mmx3mm Mild steel angle and supported on a mild steel angle post 75x75x6 mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundadation with M15 grade cement concrete 45cmx45cmx60cm size including cost and conveyance of all materials , equipment , Machinary and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. Higj intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro - reflection as per Table 6.6 of IRC 67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67 - 2012 ( as per MORTH Specification No 801)
90cm Equilateral triangle signboard
90cm High octagon
Major road ahead
Rumble strips ahead
Providing and Fixing reflective road studs of category A raised pavement markers made out of Poly carbonate / methyl methercrylate / ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromically values conforming to ASTM D428. The reflective raised pavement markers shall also confirm to the MORTH circular No RW/NH. 33023/10*97- DO .III dt 11.06.97.The height, width and length shall not be less than 15 mm , 90 mm and 100 mm and with minimum re4flective area of 13 sq.cm on each side and the slope to the base shall be 35+/-5 degree . Each reflector shall have a CIL not less than values specified in Table 2 of sais MORTH circular . The strength of detachment of the integrated cylindrical shanks, ( of diameter not less than 19+/-2 mm and height not less than 30+/-2 mm) from the body is to be a minimum value of 500Kgf . Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommandation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35-2015 guidelines and MORTH specification 804 etc complete
Provision of 1 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
2.Strengthening to the road from Edayapalayam-Ponnagani road to Periyaquilai road in Pachapalayam Panchayat R92 (KM 0/0 - 1/91)
Clearing the scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete.
Picking 5cm to 10cm old metalled and BT surface and sectioning, hand packing metal to camber as directed by the departmental officers.
Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000m Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers. Trimming bottom and side slopes , in accordance with requirements of lines grades and cross - section , and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m asb per Technical specification clause 302.3 Km 0/0 - 1/0
Construction of Embankment with Material Obtained from Road way Cutting Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 Filing with cut Earth Km 0/0 - 1/0
Supply and filling of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site labour charges etc. (Borrow Earth)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-1/045
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.7 kg/sqm using mechanical means as per Technical Specification Clause 502
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous macadam of 50 mm thick shall consist of Construction in a single couse of compacted crushed aggregates premixed with bituminous binder of 60/70 grade at the rate of 3.5 % by weight of total mix to serve as base / binder course in accordance with MORTH rev IV cl.504 specification and in confirmity with drawing.
Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminousbase to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. Km 0/0 - 1/0
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms KM 0/0-1/0
Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes.
Provision for Kilometre stones
Provision for Hecta Metre stones
Provision for Supplying and erection of Scheme Name board Cum Citizen Board
Supplying and fixing of Cautionary Sign board including painting and lettering as directed by the departmental officers etc., complete
Providing and erecting of Retro - reflectorized cautionary , Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type - IV standards of IRC - 67: 2012 and ASTM D -09, Specification and fixed over 2mm thick Aluminium sheet fixed over a black supporting frame of 25MMx25mmx3mm Mild steel angle and supported on a mild steel angle post 75x75x6 mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundadation with M15 grade cement concrete 45cmx45cmx60cm size including cost and conveyance of all materials , equipment , Machinary and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. Higj intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro - reflection as per Table 6.6 of IRC 67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67 - 2012 ( as per MORTH Specification No 801)
60cm Equilateral triangle signboard
90cm High octagon
Major road ahead
Rumble strips ahead
Providing and Fixing reflective road studs of category A raised pavement markers made out of Poly carbonate / methyl methercrylate / ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromically values conforming to ASTM D428. The reflective raised pavement markers shall also confirm to the MORTH circular No RW/NH. 33023/10*97- DO .III dt 11.06.97.The height, width and length shall not be less than 15 mm , 90 mm and 100 mm and with minimum re4flective area of 13 sq.cm on each side and the slope to the base shall be 35+/-5 degree . Each reflector shall have a CIL not less than values specified in Table 2 of sais MORTH circular . The strength of detachment of the integrated cylindrical shanks, ( of diameter not less than 19+/-2 mm and height not less than 30+/-2 mm) from the body is to be a minimum value of 500Kgf . Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommandation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35-2015 guidelines and MORTH specification 804 etc complete
Provision of 1 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Retaining wall at Ch 1200 M
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Supplying & erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surface in all cross bracings using mild steel sheets etc.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying & curing etc complete for 10 cum.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S PARTHIBARAJAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .