Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹7,600
Closing Date
10 Aug 2026, 5:00 pm
Executive Officer
NAC Office, Odagaon, Nayagada
Construction of Balance Guard Wall At Kaitha Bandha in Ward No-07 of NAC Odagaon
2026_ORULB_137434_1
NAC-ODG-03/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
NAC ODAGAON
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹7,600
Yes
31 Jul 2026
31 Jul 2026
11 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
31 Jul 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50 Mtr initial lead and 1.5 mtr. initial lead and 1.5 mtr lift including rough dressing the bed as per direction of engineer in charg. | 1 | cum | - | - |
| 2 | Refilling the trench with excavated earth well watered and rammed as per direction of engineer in charge in all kinds of soil. | - | cum | 166.4 | - |
| 3 | Filling foundation and plinth with sand well watered and rammed as per direction of engineer in charge | 1 | cum | 719.1 | ₹718.38 |
| 4 | Cement Concrete 1:3:6 using 40mm size hard black granite Crosser broken metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T and P etc complete and as directed by E.I.C. | 1 | cum | 6,005.2 | ₹5,999.19 |
| 5 | P.C.C. 1: 2 : 4 using 12 mm size hard granite crusher broken chips including cost of all materials labour T and P etc work all complete. | 1 | cum | 7,647.8 | ₹7,640.15 |
| 6 | RCC work of M-20 grade with 20mm and down grade black hard grinite (Crusher Broken) stone chips including hoisting and laying | - | cum | 6,129.3 | - |
| 7 | Cutting, bending binding M.S. Or tor rod RCC work including false works and dismentalling them after casting. | 1 | Sqm | 8,341.3 | ₹8,332.96 |
| 8 | Rigid and smooth centering and shuttering for R.C.C. work including false works and dismentalling them after casting.RCC foundation plinth bend footing bases of columns mass concrete precast slabs etc. | 1 | Mtr | 248.7 | ₹248.45 |
| 8.1 | RCC walls and fins including attached pilasters | - | Mtr | - | - |
| 9 | Providing Photographs Placing and Fixing of transparency board at Work Site etc complete. | - | nos | 1,990 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.36 MB
BOQ_603827.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].