| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26 LAccepted-AOC | ₹26 L Quoted ₹25.5 L | L1 | Accepted-AOC EMD |
| 2 | L2₹25.7 L+₹21,805.90 (0.85%)Rejected-AOC | ₹25.7 L+₹21,805.90 (0.85%) | L2 | Rejected-AOC EMD |
| Sl No | Description | Qty | Unit | MKC CONSTRUCTION L2 | MAHALAKSHMI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Construction of 60000 lits OHT at Orraikkalpalayam H/O MGC Palayam Panchayat . (12m Staging Height.) | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub-soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the site complete complying with standard specifications and as directed .First depth of 2m | 50.98 | cum | 270 ₹13,764.6 | 263.75 ₹13,445.98 Lowest |
| 3.00 | Second depth of SDR 1m | 26.91 | cum | 415 ₹11,167.65 | 408.1 ₹10,981.97 Lowest |
| 4.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification. | 5.05 | cum | 1,900 ₹9,595 | 1,889.75 ₹9,543.24 Lowest |
| 5.00 | Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers | 8.57 | cum | 5,570 ₹47,734.9 | 5,564 ₹47,683.48 Lowest |
| 6.00 | Cement concrete 1:2:4 (One of cement, four of sand and eight of hard broken stone) using 20mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers | 1.23 | cum | 6,875 ₹8,456.25 | 6,868 ₹8,447.64 Lowest |
| 7.00Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications PLANE SURFACE | |||||
| 8.00 | Below G.L | 44.13 | Sqm | 1,100 ₹48,543 | 1,095 ₹48,322.35 Lowest |
| 9.00 | 5.30 to 6.30m | 17.93 | Sqm | 1,250 ₹22,412.5 | 1,202.5 ₹21,560.83 Lowest |
| 10.00 | 8.30M-9.30 Above GL | 18.49 | Sqm | 1,350 ₹24,961.5 | 1,310.1 ₹24,223.75 Lowest |
Tender Value
Refer Docs
EMD Value
₹26,000
Closing Date
17 Feb 2026, 3:00 pmClosed
The Block development Officer (BP),Annur union
The Block development Officer (BP),Annur union
Construction of 60000 lits OHT at Orraikkalpalayam H/O MGC Palayam Panchayat
2026_RDTN_658641_1
Roc.No - 1972-2025-A2 Date - 16.02.2026
Open Tender
Civil Works
Item Rate
MGC Palayam
Construction of 60000 lits OHT at Orraikkalpalayam H/O MGC Palayam Panchayat
4 documents required · 4 mandatory
₹0
₹26,000
Yes
11 Jun 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the Work : Construction of 60000 lits OHT at Orraikkalpalayam H/O MGC Palayam Panchayat . (12m Staging Height.) | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub-soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the site complete complying with standard specifications and as directed .First depth of 2m | 50.98 | cum | - | - |
| 3 | Second depth of SDR 1m | 26.91 | cum | - | - |
| 4 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification. | 5.05 | cum | - | - |
| 5 | Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers | 8.57 | cum | - | - |
| 6 | Cement concrete 1:2:4 (One of cement, four of sand and eight of hard broken stone) using 20mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers | 1.23 | cum | - | - |
| 7 | Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications PLANE SURFACE | - | - | - | - |
| 8 | Below G.L | 44.13 | Sqm | - | - |
| 9 | 5.30 to 6.30m | 17.93 | Sqm | - | - |
| 10 | 8.30M-9.30 Above GL | 18.49 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.53 MB
price.pdf
Additional Documents • 0.88 MB
BOQ_790168.xls
BOQ • 0.42 MB
technical.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .