Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 CrAccepted-AOC FARIDABAD FARIDABAD HARYANA | FARIDABAD | HARYANA | 121001 | 1 | Accepted-AOC Work allotted | |
| 2 | 2₹6.0 Cr+₹4.8 L (0.81%)Rejected-Finance 125 126 OFFICER COLONY RAJGARH ROAD AZAD NAGAR HISAR | HISAR | HISAR | HARYANA | 125001 | 2 | Rejected-Finance Not ok |
Tender Value
₹5.1 Cr
EMD Value
₹10.2 L
Closing Date
8 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Provn Divisn PWD BandR Jind
Executive Engineer Provn Divisn PWD BandR Jind
Restoration of dismantled road after laying of pipes by Municipal Committee under AMRUT scheme in KM. 301.000 to 307.000 Internal Portion on Narwana Jind Rohtak Road NH 71 New NH 352 in Jind City
2020_HRY_144721_1
PWD/Jind/restoration of dismantled Jind-Rohtak
Open Tender
Civil Works
Works
272 days
Jind
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
Yes
Executive Engineer Provn Divisn PWD BandR Jind
₹10.2 L
Yes
Executive Engineer Provn Divisn PWD BandR Jind
24 Nov 2020
17 Sept 2020
9 Oct 2020
17 Sept 2020
8 Oct 2020
17 Sept 2020
22 Sept 2020
165 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations, trenches etc. in all kinds of soil, not exceeding 2 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry in 15 cm layers with compaction, including disposal of all surplus soil as directed within a lead of 30 Mtrs. (HSR 6.6) | 30,760 | Cum (Per Cubic Meter) | 100 | ₹30,76,000 |
| 2 | Construction of embankment, for replace of sub grade upto 500 mm km 301.000 to 307.000 km with soil of minimum CBR 8 % (4 days soaked) of obtained from borrow area with any lead and lift transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305. The finished road surface will be as per X-section approved by engineer the quantity of earth work calculated with NSL and finished level found to be less than the actual quantity (less than 15775.00 cum) will be paid. In case quantity worked out is more than 15775.00 cum, then only 15775.00 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached section-5 of DNIT.
Note:1.) Excavated earth shall be used only on berms. | 15,775 | Cum (Per Cubic Meter) | 100 | ₹15,77,500 |
| 3 | Disposal of surplus earth after use on berm with all lead and lift including loading and unloading as per direction of Engineer-in Charge. | 28,322.5 | Cum (Per Cubic Meter) | 10 | ₹2,83,225 |
| 4 | Providing and laying 100 mm thick granular sub base consisting of drainage layer confirming to Table 400.1 Grading –III of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications.
Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI).
2. Materials to be used and operations of manufacturing shall be approved by the engineer. | 3,330 | Cum (Per Cubic Meter) | 10 | ₹33,300 |
| 5 | Providing and laying 100 mm thick granular sub base consisting of filter layer confirming to Table 400.1 Grading - VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications.
Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI).
2. Materials to be used and operations of manufacturing shall be approved by the engineer. | 3,330 | Cum (Per Cubic Meter) | 10 | ₹33,300 |
| 6 | Providing & laying 150 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.)
Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI).
2. Materials to be used and operations of manufacturing shall be approved by the engineer. | 4,837.5 | Cum (Per Cubic Meter) | 10 | ₹48,375 |
| 7 | Providing, laying 100 mm thick spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.406. (N.S.)
Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI).
2. Materials to be used and operations of manufacturing shall be approved by the engineer. | 3,225 | Cum (Per Cubic Meter) | 10 | ₹32,250 |
| 8 | Providing and applying primer coat with bitumen emulsion (S.S. grade-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 Kg/sqm using mechanical means as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer-in-Charge complete in all respects as per clause No. 502. (N.S.) | 30,500 | Sqm (Per Square Meter) | 10 | ₹3,05,000 |
| 9 | Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.) | 61,000 | Sqm (Per Square Meter) | 10 | ₹6,10,000 |
| 10 | Providing & Laying 75 mm thick compacted Dense Graded Bituminous Macadam (DBM) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with appropriate rollers to achieve the desired compaction as per clause No. 505 MoRT&H specification for road and bridge works (5th edition) 2013 using minimum 4.50% to bitumen grade VG-30 as binder content by weight of total mix, complete in all respect including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification (5th edition) 2013 in mandatory.
If bitumen required more than 4.50% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work.(NS)
Note:- Before carrying out bituminous work, coating & Stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-Charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. | 2,287.5 | Cum (Per Cubic Meter) | 10 | ₹22,875 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
Tender Document • 6.83 MB
Tendernotice_1.pdf
Tender Document • 5.18 MB
BOQ_194366.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .