Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC 7C GOVIND NAGAR MATHURA | MATHURA | ₹5.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.3 Cr+₹27.1 L (5.34%)Rejected-Finance CHITAVAR JOGI MEETAI HATHRAS | ₹5.3 Cr+₹27.1 L (5.34%) | L2 | Rejected-Finance rejected |
| 3 | L3₹5.6 Cr+₹48.9 L (9.66%)Rejected-Finance GOODBYE BAZAR HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | ₹5.6 Cr+₹48.9 L (9.66%) | L3 | Rejected-Finance rejected |
| 4 | L4₹6.3 Cr+₹1.2 Cr (23.9%)Rejected-Finance | ₹6.3 Cr+₹1.2 Cr (23.9%) | L4 | Rejected-Finance rejected |
Tender Value
₹8.2 Cr
EMD Value
₹16.4 L
Closing Date
23 Apr 2025, 12:00 pmClosed
SE Aligarh Circle PWD Aligarh
SE Aligarh Circle PWD Aligarh
Widening and Strengthening of Hasayan Kanau Sankra Road
2025_CEALG_1028750_1
2452/Cashier(PDH)-AC/25-26 Dt. 03-04-25
Open Tender
Civil Works
Item Rate
365 days
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
Yes
₹16.4 L
Yes
SE office Aligarh
2 Jul 2025
16 Apr 2025
23 Apr 2025
16 Apr 2025
23 Apr 2025
17 Apr 2025
17 Apr 2025
Amount
Excavation of road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross aections, and transporting to the embankment location within all lifts and lead upto 1000m (Excavated eartth used in the vicinity. 301(3.6) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Stablized Base/Sub-base Providing, laying, spreading and compacting of existing granular material adding cement and using truck mounted / self propelled cement spreader shall have variable working width with microprocessor, controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller to achieve design unconfined compressive strength. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement and 3.50% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 Kg per sqm on the prepared bituminous surface cleaned with mechanical broom.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(Excluding Cost of GST)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Construction of un-reinforced, dowel jointed, grade cement concrete pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or Concrete paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, temprature reinforced, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (Excluding reinforcement) as per MORTH Specification 602 S.No. No. 6.02 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Carted earth (Excluding Cost of GST)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Earth work in excavation in ordinary soil. (Ch-4, SI 251) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing and laying cement concrete in 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. In Foundation and floors. Ch. 5 Sr. 7(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation Complete as per Drawing and Technical Specification as per MORTH Clause 15.13(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only. As Per SOR 4.1.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. In Foundation and floors. As Per SOR 275(a) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation in road work including all materials, labours, T&P etc. required for completion of the work. As Per SOR 20-18(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation-150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) As Per SOR 6.1.1(i) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Supply and Laying of 350 mm dia NP-3 Hume Pipe including 15%Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) For 350 mm dia
Supply and Laying of 600 mm dia NP-3 Hume Pipe including 15%Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) For 600 mm dia
Supply and Laying of 900 mm dia NP-3 Hume Pipe including 15%Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) For 900 mm dia
Ruled Pointing on brick work with cement mortar of mix 1:3 (1Cement : 3 Fine Sand) SOR SI No. 574A(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
12 mm cement plaster on brick work with cement mortar of mix (upto 10 mtr height from Ground level) 1:4 (1 cement : 4 Coarse sand) As Per SOR 13.4.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
White washing with lime on undecorated wall surfaces (Two coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters. As Per SOR 672 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Dismentaling brick work, stone work or R.C.C. work in lime of cement mortar and including stacking of materials as directed by the Engineer-In-Charge with a distance of 60m. S.I. No. 692(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per MORTH Specification No. 304 12.01 (i) B (ii) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Plain Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M20) as per MORTH Clause 12.08 (B Case-II) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M25) as per MORTH Clause 12.08 (E Case-II) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Reinforced Cement Concrete in SUB-STRUCTURE complete as per Drawing and Technical Specifications. (RCC Grade M25) as per Clause 13.05 (F (p)) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Furnishing and Placing Reinforced/ Prestressed cement concrete in SUPER-STRUCTURE as per drawing and Technical Specification (RCC Grade M25) as per Clause 14.01 (B Case II) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation Complete as per Drawing and Technical Specification as per MORTH Clause 15.13(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing and laying of Hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35. The finished surface to be level, uniform and free from streaks and holes.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)
Lettering and painting with emamal paint (renewal coat) including cost of material, labour and T&P etc complete. (Ch-26, SI No. 10)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) Hectometer
Lettering and painting with emamal paint (renewal coat) including cost of material, labour and T&P etc complete. (Ch-26, SI No. 10)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.)Km. Stone (Ordinary)
Lettering and painting with emamal paint (renewal coat) including cost of material, labour and T&P etc complete. (Ch-26, SI No. 10)(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) Km. Stone (5th)
Part-A (Bituminous Work) 05 Year Maintenance Charge @ 7.50%) Routine Maitenance of road for 05 Years after the completion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year @ Nill
2nd Year @ 0.25%
3rd Year @ 0.50%
4th Year @ 0.75%
5th Year @ 1.00%
KISHANKUMAR SARASWAT (BID ID -5139722)
BALAJI Construction (BID ID -5137897)
yash construction (BID ID -5138748)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1859945.xls
BOQ • 0.28 MB
168328928.pdf
Tender Documents • 1.99 MB
168328930.html
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .