Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹7.0 L−₹13,890 (1.93%)Accepted-AOC | H2 | Accepted-AOC accepted | |
| 2 | H1₹7.2 LRejected-AOC | H1 | Rejected-AOC reject |
| Sl No | Description | Qty | Unit | K THANGAM H1 | PANDIARAJ N H2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 275 | m3 | 200 ₹55,000 | 195 ₹53,625 Lowest |
| 2.00Removing the burst AC pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc.complete (excluding cost of sound pipe and jointing materials) | |||||
| 2.01 | 250mm dia AC main | 40 | nos | 2,910 ₹1,16,400 | 2,900 ₹1,16,000 Lowest |
| 2.02 | 200 mm AC main | 25 | nos | 2,300 ₹57,500 | 2,270 ₹56,750 Lowest |
| 3.00Removing the burst PVC pipes with following sizes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc.complete (excluding cost of sound pipe and jointing materials) | |||||
| 3.01 | 110mm dia PVC main | 150 | each | 900 ₹1,35,000 | 880 ₹1,32,000 Lowest |
| 3.02 | 140mm dia PVC Main | 25 | each | 1,300 ₹32,500 | 1,288 ₹32,200 Lowest |
| 3.03 | 90mm dia PVC main | 300 | each | 440 ₹1,32,000 | 433 ₹1,29,900 Lowest |
| 4.00Removing the burst CI main pipes with following sizes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc.complete (excluding cost of sound pipe and jointing materials) | |||||
| 4.01 | 150mm dia CI main | 10 | nos | 3,100 ₹31,000 | 3,000 ₹30,000 Lowest |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
15 Jul 2026, 3:00 pmClosed
commissioner ,virudhunagar municipality
municipal office road,virudhunagar municipality,virudhunagar
attending repairs and maintenance of leakage work for pipeline in municipal limit in virudhunagar municipalait
2026_MAWS_683538_1
E2/1741-1/2025
Open Tender
Civil Works
Works
90 days
virudhunagar municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,500
9 Oct 2026
2 Jul 2026
15 Jul 2026
2 Jul 2026
15 Jul 2026
2 Jul 2026
2 Jul 2026 - 15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 275 | m3 | 196.95 | ₹54,161.25 |
| 2Removing the burst AC pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc.complete (excluding cost of sound pipe and jointing materials) | |||||
| 2.01 | 250mm dia AC main | 40 | nos | 2,903.5 | ₹1,16,140 |
| 2.02 | 200 mm AC main | 25 | nos | 2,270.75 | ₹56,768.75 |
| 3Removing the burst PVC pipes with following sizes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc.complete (excluding cost of sound pipe and jointing materials) | |||||
| 3.01 | 110mm dia PVC main | 150 | each | 880.24 | ₹1,32,036 |
| 3.02 | 140mm dia PVC Main | 25 | each | 1,288.46 | ₹32,211.5 |
| 3.03 | 90mm dia PVC main | 300 | each | 433.74 | ₹1,30,122 |
| 4Removing the burst CI main pipes with following sizes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc.complete (excluding cost of sound pipe and jointing materials) | |||||
| 4.01 | 150mm dia CI main | 10 | nos | 3,031.07 | ₹30,310.7 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_821663.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_821663.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .