Loading…
Loading…
Tender Value
₹9.9 L
EMD Value
₹19,900
Closing Date
27 Jul 2026, 6:00 pm2d left
Executive Engineer LRWD SMC
Office of The Executive Engineer LRWD SMC old fund office near public park karan Nagar
Construction Of Park Near Bata Boni at Chattabal
2026_HAUDD_316311_6
NIET 20 e-tendering /2026-27 LRWD
Open Tender
Civil Works
Percentage
60 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Chief Accounts Officer SMC
₹19,900
Yes
16 Jul 2026
16 Jul 2026
28 Jul 2026
16 Jul 2026
27 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labourers for clearance of site etc. | - | NO | - | - |
| 2 | Surface dressing of the ground including removing vegetation and in-equalitiesnot exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil. | 1 | SQM | - | - |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (1 meter from cutting edge ) All kinds of soil | 1 | CUM | - | - |
| 4 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: Bituminous road. | - | SQM | 1 | - |
| 5 | Providing & laying /Black cutting / Nallah Muck / GSB filling got by lorries including Loading, unloading. Ramming, dressing, and watering in layers and , including all sorts of carriages complete job. | 1 | CUM | - | - |
| 6 | Providing and laying stone soling/ hand packed (above 75 mm) including all sorts of carriages by all means of transport upto site of work complete job . | - | CUM | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | CUM | 1 | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | CUM | 1 | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete including all carriages complete job.(TMT Bars) | - | KG | - | - |
| 10 | Form work centering / shuttering including Strutting, Propping etc and removal of form work for:
(a) Foudation, footings, basis, coloums etc | - | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1030866.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].