| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.0 LAdmitted-Finance | -3.01% | ₹17.0 L | L1 | Admitted-Finance |
| 2 | L2₹17.6 LAdmitted-Finance 75 2 SREENAGAR 01 NO MADHYAMGRAM KOLKATA 700129 | MADHYAMGRAM | NORTH 24 PARGANAS | WEST BENGAL | 700129 | +0.20% | ₹17.6 L | L2 | Admitted-Finance |
| 3 | L3₹17.7 LAdmitted-Finance NANDIRVITA SHAIKHPARA RANINAGAR MURSHIDABAD WEST BENGAL | RANINAGAR | MURSHIDABAD | WEST BENGAL | +0.81% | ₹17.7 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Technically Disqualified |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Technically Disqualified |
Tender Value
Refer Docs
EMD Value
₹39,096
Closing Date
15 Jan 2026, 4:55 pmClosed
Administrator, Haldia Municipality
City Center, Debhog, Haldia, Purba Medinipur, 721657
Construction of Culvert, Concrete road and allied works backside of Meghnath Saha college, Hatiberia under Ward No. 25 within Haldia Municipality
2025_MAD_979335_1
WBMAD/ULB/HM/6527/NIT-2474
Open Tender
CIVIL WORKS
30 days
Haldia Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹39,096
11 Mar 2026
24 Dec 2025
16 Jan 2026
24 Dec 2025
15 Jan 2026
24 Dec 2025
Page No. - 1/2 (a) Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring
Page No. - 2/4 (a) (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
Page No. - 14/1 Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Page No. - 42/36 Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fittings, fixing and striking out after completion of works. ( upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height. shall be taken as 4 m and extra for woks beyond the initial 4 m. ht. shall be allowed under 12(e) for every 4 m or part thereof. ) f) 25 mm to 30 mm shuttering without staging in foundation.
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
Page No. - 43/40 (ii) ( Analysis rate, 10th Corrigenda dt 24.08.2022 ) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. JSW /JSPL /SHYAM / SRMB / BMASL / ELECTROSTEEL / SSL
Page No. - 26/10 (i ) ( Analysis rate ) Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
P - 1/3 Earth work in filling in foundation trenches or plinth with good earth. in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete. ( Payment to be made on basis of measurement of fiinished quantity of work ) a) With earth obtained from excavation of foundation.
P - 245/4.04 ( Analysis rate ) Supplying, spreading & consolidating moorum to a depth of 75 mm at desired density & C.B.R. as per specification camber including watering as necessary, lighting, guarding barricading & making earthen bundh where necessary to protect the edge & curing with water for 2 to 3 days, mending cracks by rolling where necessary complete as per specification. (The payment is to made on the basis of the finished compacted volume of moorum)
Page No. - 47/3 Supplying & laying polythene sheet ( 150 gm. / SqM.) over the layer of compacted moorum at starched condition.
GST Item (Effect from 18.07.2022) 18 % GST on Estimated Cost of Sl No- 1 to 10
Labour Welfare Cess Item (Effect from 01.11.2017) 1% Labour Welfare Cess on Estmated Cost of Sl No -1 to 11
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_2387051.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid