Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹9.8 LAdmitted-Finance | +8.88% | ₹9.8 L | H1 | Admitted-Finance |
Updated dates
Tender Value
₹9 L
EMD Value
₹18,000
Closing Date
19 Feb 2026, 6:00 pmClosed
EE PHED CD II UDAIPUR
EE PHED CD II UDAIPUR
WORK FOR LEAKAGE AT CSD VII UDAIPUR
2026_PHCJA_535164_1
39/2025-26
Open Tender
Civil Works - Water Works
UDAIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
23615 EE PHED CD II UDAIPUR
₹18,000
Yes
27 Feb 2026
4 Feb 2026
20 Feb 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated trench/pit/road shall be done properly i.e. after a layer of 20cm with propoer watering and ramming in layers. For entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)
In all type Soil AC/PVC/HDPE pipe
Add on above item no. 1.1 for B.T. Road 5%
Add on above item no. 1.1 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Add on above no. 1.1 item if depth of pipeline is above 3.0 mtr. 30%
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)
In all type Soil
Add on above item no. 1.2 for B.T. Road 5%
Add on above item no. 1.2 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Add on above no. 1.2 item if depth of pipeline is above 3.0 mtr. 30%
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)
In all type Soil
Add on above item no. 1.3 for B.T. Road 5%
Add on above item no. 1.3 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Add on above no. 1.3 item if depth of pipeline is above 3.0 mtr. 30%
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)
In all type Soil
Add on above item no. 1.4 for B.T. Road 5%
Add on above item no. 141 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.4 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Add on above no. 1.4 item if depth of pipeline is above 3.0 mtr. 30%
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.
In all type Soil
Add on above item no. 1.5 for B.T. Road 5%
Add on above item no. 1.5 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.5 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Add on above no. 1.5 item if depth of pipeline is above 3.0 mtr. 30%
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.
In all type Soil
Add on above item no. 1.6 for B.T. Road 5%
Add on above item no. 1.6 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.6 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Add on above no. 1.6 item if depth of pipeline is above 3.0 mtr. 30%
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.
Add on above item no. 1.7 for B.T. Road 5%
Add on above item no. 1.7 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.7 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)
In all type Soil
80 mm dia pipe to 100mm
125 mm dia pipe to 150mm
200 mm dia pipe to 250mm
300 mm dia pipe to 350mm
Add on above item no. 1.8 for B.T. Road 5%
Add on above item no. 1.8 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.8 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).
In all type Soil
80 mm to 110 mm
125 mm to 165 mm
200 mm to 300 mm
Add on above item no. 1.9 for B.T. Road 5%
Add on above item no. 1.9 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.9 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).
In all type Soil
80 mm to 100 mm
125 mm to 150 mm
200 mm to 300 mm
350 mm to 450 mm
500 mm to 600 mm
Add on above item no. 1.10 for B.T. Road 5%
Add on above item no. 1.10 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.10 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Labour charges for removal of complaint of polluted water supply to the consumers
Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size
In all type Soil
Add on above item no. 1.12 for B.T. Road 5%
Add on above item no. 1.12 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.12 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size
In all type Soil
Add on above item no. 1.13 for B.T. Road 5%
Add on above item no. 1.13 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.15%
Add on above no. 1.13 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
NIT39.pdf
Tender Documents • 2.14 MB
BOQ_953503.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid