| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC | 1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | 2₹3.4 L+₹5,384 (1.60%)Rejected-Finance | 2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | S K C AND CO L2 | V.Thangavel L1 |
|---|---|---|---|---|---|
| 1.00Name of Work: Renovation of North Facing RCC Roof School Building in PUE School @ Bodiplayam H/O Bodiplayam | |||||
| 2.00 | Dismantling and removal of Pressed Tiles & Weathering Course | 91.44 | Sqm | 47 ₹4,297.68 | 45.7 ₹4,178.81 Lowest |
| 3.00 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. | 6.86 | Cum | 4,050 ₹27,783 | 4,030.5 ₹27,649.23 Lowest |
| 4.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 97.37 | Sqm | 1,275 ₹1,24,146.75 | 1,269.5 ₹1,23,611.22 Lowest |
| 5.00 | Removal of Cement Plastering Including all Charges etc…, Compelete | 76.4 | Sqm | 10 ₹764 | 8.2 ₹626.48 Lowest |
| 6.00 | Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 26.8 | Sqm | 275 ₹7,370 | 269.5 ₹7,222.6 Lowest |
| 7.00 | Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 79.6 | Sqm | 315 ₹25,074 | 310 ₹24,676 Lowest |
| 8.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 175.22 | Sqm | 150 ₹26,283 | 141 ₹24,706.02 Lowest |
| 9.00 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete | 185.25 | Sqm | 260 ₹48,165 | 253.4 ₹46,942.35 Lowest |
| 10.00 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. | 110.24 | Sqm | 40 ₹4,409.6 | 36.5 ₹4,023.76 Lowest |
Tender Value
₹4.3 L
EMD Value
₹4,500
Closing Date
5 Aug 2025, 3:00 pmClosed
Block Developement Officer (BP)
Pollachi North Block Panchayat Union Office
Renovation of North Facing RCC roof Building in PUM School at Bodipalayam
2025_RDTN_585121_1
Rocno1479/2025/A2dt04/07/2025
Open Tender
Civil Works - Buildings
Item Rate
90 days
Pollachi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,500
Yes
13 Aug 2025
24 Jul 2025
5 Aug 2025
24 Jul 2025
5 Aug 2025
24 Jul 2025
Amount
Dismantling and removal of Pressed Tiles & Weathering Course
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Removal of Cement Plastering Including all Charges etc…, Compelete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Painting two coats with enamel paint for ABL Boards Black Boards,etc,as per specification and as directed
Provision for Bala Painting
Brick Partition wall work in cement mortar 1:3 mix and conveyance of all materials to site and all labour charges etc complete
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing Cudappah Slab 38 or 40mm for Shelfs
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. Supply and fixing of 16A DP switch of 500V with metal clad with fuse and neutral (side handle) on suitable TW board with earth connection only
Collection and supply of M.sand filling into the basement including cost and conveyance to the site and all labour charges.
Brick work in CM 1:5 mix using Fly Ash bricks including curing etc., complete complying with standard specifications.
Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges. 40mm Metal
Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges.20mm Metal
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification.
S K C AND CO (BID ID -1419761)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .