Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹89.1 LAdmitted-Finance | -1.22% | ₹89.1 L | L1 | Admitted-Finance |
| 2 | L2₹90.1 L+₹1.0 L (1.13%)Admitted-Finance | -0.10% | ₹90.1 L+₹1.0 L (1.13%) | L2 | Admitted-Finance |
| 3 | L3₹91.1 L+₹2.0 L (2.25%)Admitted-Finance MOHALLA GANGA VIHAR DADRI DISTT GAUTAMBUDHNAGAR U P | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | +1.00% | ₹91.1 L+₹2.0 L (2.25%) | L3 | Admitted-Finance |
Tender Value
₹90.2 L
EMD Value
₹1.8 L
Closing Date
10 Jul 2026, 5:00 pmClosed
SM_TENDER CELL
GNIDA OFFICE
Maintenance work of Civil work and Providing and fixing of FRP railing in Forest Park Boundary wall at Sector Beta-I and II, Greater Noida.
2026_GNIDA_1164876_6
SM/(E-TENDER CELL)/2026/771 DATED-25.06.2026
Open Tender
Civil Works
Percentage
180 days
GREATER NOIDA
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹2,090
₹1.8 L
20 Aug 2026
30 Jun 2026
13 Jul 2026
30 Jun 2026
10 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).
(DSR-18/15.2.1/AR) | 105.65 | Cum | 923.42 | ₹97,559.32 |
| 2 | M-150 Brick Work in 1:6 cement & fine sand 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work.
Same as item no. 303 but in 1:4 one cement & 4 fine sand of 1.25 F.M. mortar. (SOR-20/6.05/305)
Same as item no. 305 but in 1:4 one cement & four Coarse sand of 2.20 F.M. mortar.
(SOR-20/6.05/305(a)) | 36.66 | Cum | 4,950 | ₹1,81,467 |
| 3 | Supply of fiber reinforced plastic railing & the size 1.00 mtr length x 1.00 mtr Height railing temple design. Weight 8 kg.
AR/GNIDA | 2,296.7 | Sqm | 3,275 | ₹75,21,692.5 |
| 4 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/5.06/279)
Same as above item no. 279 but in proportion of 6:3:1.
(SOR-20/5.07/280) | 105.65 | Cum | 7,000 | ₹7,39,550 |
| 5 | 12mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand).
(DSR-18/13.4.2/AR) | 1,196.22 | Sqm | 164.81 | ₹1,97,149.02 |
| 6 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm).
DSR-18/13.44.1/AR | 4,196.55 | Sqm | 67.37 | ₹2,82,721.57 |
| 7 | Labour Cess will be paid extra as per applicable | - | - | - | - |
| 8 | GST will be paid extra as per applicable | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.75 MB
PreQ_Forest_Park.pdf
Tender Documents • 2.03 MB
BOQ_2184536.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .