| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC | ₹3.1 Cr Quoted ₹3.5 Cr | L1 | Accepted-AOC Lowest bid. |
| 2 | L2₹3.5 Cr+₹73,351 (0.21%)Rejected-Finance | ₹3.5 Cr+₹73,351 (0.21%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹3.6 Cr+₹3.5 L (0.98%)Rejected-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | ₹3.6 Cr+₹3.5 L (0.98%) | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
7 Nov 2019, 3:00 pmClosed
SUPERINTENDING ENGINEER
Electricity Urban Distribution Circle, Banglow No. 9, Old Power house colony, Station Road, Gorakhpur.
REPLACEMENT OF OLD AND DAMAGED CONDUCTOR WITH ABC CABLE
2019_PVVNV_395797_1
106/EUDC(G)/2019-20
Open Tender
Electrical Works
Turn-key
120 days
AREA OF EUDC GKP
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
SUPERINTENDING ENGINEER, EUDC GORAKHPUR
₹3.1 L
31 Jan 2020
24 Oct 2019
8 Nov 2019
24 Oct 2019
7 Nov 2019
24 Oct 2019
Amount
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&142@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr Hkkjr izsl xyh ¼fcgkjh dkyksuh½ ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&143@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr [klgh Vksyk rqdZekuiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&144@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr fpaxh lbZn bekeckM+k rqdZekuiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&145@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr fnynkjxyh] rqdZekuiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&146@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr bZVoy njksxk xyh ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&147@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr njksxk xyh] gkalwiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&148@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr ctjax odhy] gklwiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&149@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr pqM+hgkjk xyh] rqdZekuiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&150@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr nqxkZ efUnj] cgjkeiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&151@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr ;wfu;u cSad ukSl<+] xksj[kiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&152@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr ve:n e.Mh] xksj[kiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&153@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr us'kuy dkuosUV Ldwy xksj[kiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&154@2019&20 ¼fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr ikloku <+kyk] ukSl<+ xksj[kiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
ST Pole 11 Mtr. Long
Earthing Complete
Cable LT ABC (3X120+1X95+1X16) mm2
Stay Complete
De-centralized Material :-
1X16 mm2 PVC Cable
Distribution Box
Clamp of Distribution Box
I Hook
Dead End Clamp With I Hook
Suspension Clamp With I Hook
LT Insulated Piercing Connector For Line To Line Jumpering in Case of Tapping
Nuts & Bolte
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 11 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of 11Mtr long ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of 11 Mtr. Long ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&160@2019&20 ¼fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr txslj iklh pkSd ls gM+gok QkVd rd ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
ACSR Dog Conductor
Stay Complete with 5 Kg wire
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector
LT clamp for ST Pole and other clamps with Nuts & bolts
Shackle Insulator
I hook
Nuts & Bolts
XLPE PVC insulated 1x35 Sq.mm. cable for energizing D.B.
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Disconnection and reconnection of consumer cable of complete LT Line (1 Phase/3 Phase)
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&161@2019&20 ¼fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr fodkl uxj] xksj[kiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
ACSR Dog Conductor
Stay Complete with 5 Kg wire
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector
LT clamp for ST Pole and other clamps with Nuts & bolts
Shackle Insulator
I hook
Nuts & Bolts
XLPE PVC insulated 1x35 Sq.mm. cable for energizing D.B.
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
Disconnection and reconnection of consumer cable of complete LT Line (1 Phase/3 Phase)
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&162@2019&20 ¼fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr u[kkl pkSd ls jsrh pkSd ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&163@2019&20 ¼fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr ?kklhdVjk ls fetkZiqj pkSd rd ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&164@2019&20 ¼fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr pkSfj;k ls [kwuhiqj rd ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&165@2019&20 ¼fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr e[kfu;k iwy tkQjk cktkj ls tkQjk pkSd rd ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&166@2019&20 ¼fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr ?kklh dVjk ls e[kfu;k iwy tkQjk cktkj rd ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&155@2019&20 ¼fo|qr uxjh; forj.k [k.M&r`rh;] xksj[kiqj ds v/khu 33@11 ds0oh0 fo|qr midsUnz] eksgn~nhiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
Stay Complete with 5 Kg wire
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector for line to line jumpering in case of tapping
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
XLPE PVC insulated 1x35 Sq.mm. cable for energizing D.B.
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Disconnection and reconnection of consumer cable of complete LT Line (1 Phase/3 Phase)
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&156@2019&20 ¼fo|qr uxjh; forj.k [k.M&r`rh;] xksj[kiqj ds v/khu 33@11 ds0oh0 fo|qr midsUnz [kksjkckj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Stay Complete with 5 Kg wire
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector for line to line jumpering in case of tapping
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
XLPE PVC insulated 1x35 Sq.mm. cable for energizing D.B.
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Erection of Distribution Box with all fitting
Dismantling of LT overhead line
Disconnection and reconnection of consumer cable of complete LT Line (1 Phase/3 Phase)
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&157@2019&20 ¼fo|qr uxjh; forj.k [k.M&prqFkZ] xksj[kiqj ds v/khu 33@11 ds0oh0 fo|qr midsUnz jkIrhuxj ds vUrxZr Hkxokuiqj [kkl] xksj[kiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
Stay Complete with 5 Kg wire
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector for line to line jumpering in case of tapping
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
XLPE PVC insulated 1x35 Sq.mm. cable for energizing D.B.
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Disconnection and reconnection of consumer cable of complete LT Line (1 Phase/3 Phase)
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&158@2019&20 ¼fo|qr uxjh; forj.k [k.M&prqFkZ] xksj[kiqj ds v/khu 33@11 ds0oh0 fo|qr midsUnz esfMdy dkyst] xksj[kiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
Stay Complete with 5 Kg wire
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector for line to line jumpering in case of tapping
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
XLPE PVC insulated 1x35 Sq.mm. cable for energizing D.B.
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Disconnection and reconnection of consumer cable of complete LT Line (1 Phase/3 Phase)
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
fctusl Iyku esa Lohd`r iSdst la[;k ch0ih0&159@2019&20 ¼fo|qr uxjh; forj.k [k.M&prqFkZ] xksj[kiqj ds v/khu 33@11 ds0oh0 fo|qr midsUnz 'kkgiqj xksj[kiqj ds iqjkus ,oa {kfrxzLr rkj dks ,0ch0lh0 dsfcy ls cnyus dk dk;Z½ ds dk;ksZ dks Qqy VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
Centralized Material :-
Cable LT ABC (3X120+1X95+1X16) mm2
ST Pole 09 Mtr. Long
Earthing Complete
Stay Complete with 5 Kg wire
De-centralized Material :-
Distribution Box with Clamp
Insulated Dead End Clamp With I Hook
Insulated Suspension Clamp With I Hook
LT Insulated Piercing Connector for line to line jumpering in case of tapping
LT clamp for ST Pole and other clamps with Nuts & bolts
I hook
Nuts & Bolts
XLPE PVC insulated 1x35 Sq.mm. cable for energizing D.B.
Work Details ( All Work is to be done As per RESPO Norms )
Loading, Unloading and Carriage of Above material from JE dump store to work site
Erection of Single 09 Mtr. Long ST Pole along with all fitting ( As per RESPO Norms )
Grouting and Making of Plinth of ST Pole
Painting of ST Pole
Laying of LT AB Cable (3X120+1X95+1X16) mm2 along with all fitting
Grouting of stay complete in all respect
Earthing of ST Pole
Erection of Distribution Box with all fitting
Dismantling of exisiting ST Pole
Dismantling of LT overhead line
Disconnection and reconnection of consumer cable of complete LT Line (1 Phase/3 Phase)
Loading Unloading and carriage of all dismantled material from work site to store centre, Gorakhpur
Kgn Construction And Distribution
M/s Anil kumar singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .